Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons:- 1. The development shall be undertaken in accordance with the application dated 30 th October 2015; the Environmental Statement October 2015; the Further Environmental Information (EIA Addendum) December 2016; and approved drawings: · 1 of 12 - Site Location, Figure 1 · 2 of 12 - Planning Application Boundary, Figure 2 · 3 of 12 - Typical Wind Turbine Elevation, Figure 3 · 4 of 12 - Typical Turbine Foundation Details, Figure 4 · 5 of 12 - Typical Crane Platform Layout, Figure 5 · 6 of 12 - Typical Track Cross Sections, Figure 6 · 7 of 12 - Meteorological Mast, Figure 7 · 8 of 12 - Typical Cable Trench Detail, Figure 8 · 9 of 12 - Control Building and Substation Compound, Figure 9 · 10 of 12 - Typical Control Building Details, Figure 10 · 11 of 12 - Construction Compound Layout, Figure 11 · 12 of 12 - Comparative Turbine Elevations (126m and 106m) Figure 6.10.1 unless otherwise agreed in writing with the Planning Authority and except insofar as amended by the terms of this permission. Reason: To ensure the development is carried out in accordance with the application documentation. Turbine dimensions and micro-siting 2. The overall height of the wind turbines shall not exceed 126 metres to tip of the blades when the a turbine blade is in the vertical position as measured from the natural ground conditions immediately adjacent to the turbine base, with the exception of T36 where the blade tip height shall be restricted to 106 metres. This permission should not be construed as giving any consent for T37 and its ancillary development, or for access track formation beyond the spur serving T36, as this turbine was deleted from the scheme during the processing of the application. Reason: For the avoidance of doubt and in order to define the permission. 3. The approved turbines shall be erected and the site tracks constructed in the positions indicated in the Environmental Statement, save for the ability to vary under the supervision of the Ecological Clerk of Works required by condition 9 and without further recourse to the Planning Authority, the indicated position of any turbine, track or associated infrastructure by up to 30 metres in any direction, with the exception of the movement in an easterly direction of T21 or T30 to T36 inclusive. Variations of between 30 and 50 metres may be permitted subject to the prior written approval of the Planning Authority. Any such micro-siting shall not encroach further into any environmentally sensitive areas indicated in the Environmental Statement. Reason: In order to enable re-positioning in response to local ground conditions having regard to environmental constraints. Timing and Operation 4. The permission shall enure for a period of 25 years from the ‘First Export Date’ being the date when electricity is first exported from all the wind turbines to the electricity grid network. Written confirmation of the First Export Date shall be provided to the Planning Authority no later than one calendar month after that event. Reason: To define the duration of the permission. 5. If any turbine fails to supply electricity to the grid for a continuous period of 6 months, then unless otherwise approved in writing by the Planning Authority, a scheme for the removal of the wind turbine should be submitted in writing for the approval of the Planning Authority. The scheme shall thereafter be implemented as approved. Reason: ... view the full minutes text for item 7.