SCOTTISH POWER RENEWABLES UK LIMITED: ERECTION OF 18 NO.

Agreed Planning 3 papers

Planning, Protective Services and Licensing Committee agreed this item on Wednesday 22 February 2017. Below is the council's own wording, with the papers it was decided on.

Item7

Resolved

Decision The Committee agreed to grant planning permission subject to the following conditions and reasons:- 1. The development shall be undertaken in accordance with the application dated 30 th October 2015; the Environmental Statement October 2015; the Further Environmental Information (EIA Addendum) December 2016; and approved drawings: · 1 of 12 - Site Location, Figure 1 · 2 of 12 - Planning Application Boundary, Figure 2 · 3 of 12 - Typical Wind Turbine Elevation, Figure 3 · 4 of 12 - Typical Turbine Foundation Details, Figure 4 · 5 of 12 - Typical Crane Platform Layout, Figure 5 · 6 of 12 - Typical Track Cross Sections, Figure 6 · 7 of 12 - Meteorological Mast, Figure 7 · 8 of 12 - Typical Cable Trench Detail, Figure 8 · 9 of 12 - Control Building and Substation Compound, Figure 9 · 10 of 12 - Typical Control Building Details, Figure 10 · 11 of 12 - Construction Compound Layout, Figure 11 · 12 of 12 - Comparative Turbine Elevations (126m and 106m) Figure 6.10.1 unless otherwise agreed in writing with the Planning Authority and except insofar as amended by the terms of this permission. Reason: To ensure the development is carried out in accordance with the application documentation. Turbine dimensions and micro-siting 2. The overall height of the wind turbines shall not exceed 126 metres to tip of the blades when the a turbine blade is in the vertical position as measured from the natural ground conditions immediately adjacent to the turbine base, with the exception of T36 where the blade tip height shall be restricted to 106 metres. This permission should not be construed as giving any consent for T37 and its ancillary development, or for access track formation beyond the spur serving T36, as this turbine was deleted from the scheme during the processing of the application. Reason: For the avoidance of doubt and in order to define the permission. 3. The approved turbines shall be erected and the site tracks constructed in the positions indicated in the Environmental Statement, save for the ability to vary under the supervision of the Ecological Clerk of Works required by condition 9 and without further recourse to the Planning Authority, the indicated position of any turbine, track or associated infrastructure by up to 30 metres in any direction, with the exception of the movement in an easterly direction of T21 or T30 to T36 inclusive. Variations of between 30 and 50 metres may be permitted subject to the prior written approval of the Planning Authority. Any such micro-siting shall not encroach further into any environmentally sensitive areas indicated in the Environmental Statement. Reason: In order to enable re-positioning in response to local ground conditions having regard to environmental constraints. Timing and Operation 4. The permission shall enure for a period of 25 years from the ‘First Export Date’ being the date when electricity is first exported from all the wind turbines to the electricity grid network. Written confirmation of the First Export Date shall be provided to the Planning Authority no later than one calendar month after that event. Reason: To define the duration of the permission. 5. If any turbine fails to supply electricity to the grid for a continuous period of 6 months, then unless otherwise approved in writing by the Planning Authority, a scheme for the removal of the wind turbine should be submitted in writing for the approval of the Planning Authority. The scheme shall thereafter be implemented as approved. Reason: ... view the full minutes text for item 7.
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee

Location Plan relative to Application Ref: 15/03057/PP Date: 06.02.2017 ¯ 1:50,000

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
15-03057-PPReport 4.5 MB DownloadRead as text
PDF
1503057 RoH RKReport 388 KB Download
PDF
SCOTTISH POWER RENEWABLES UK LIMITED: ERECTION OF 18 NO. WIND TURBINES (17 NO. AT 126 METRES AND 1 NO. AT 106 METRES HIGH TO BLADE TIP), FORMATION OF ACCESS TRACKS, ERECTION OF CONTROL BUILDING, SUB-STATION AND ASSOCIATED COMPOUND, 2 NO. ANEMOMETER MASTS, 5 NO. BORROW PITS AND ASSOCIATED INFRASTRUCTReport 73 KB Download

At this meeting

Whole meeting
3MINUTESOn the agenda 4BETTER REGULATION: ARGYLL AND BUTE COUNCIL ENFORCEMENT POLICYAgreed 5ARGYLL AND BUTE COUNCIL - BIODIVERSITY TECHNICAL NOTE FOR PLANNERS AND DEVELOPERSAgreed 6MRS IONA LARG: ERECTION OF BEACH HUT FOR BLACKHOUSE WATERSPORTS (RETROSPECTIVE): LAND NORTH-EAST OF BRAEHEAD, BALEVULLIN BEACH, BALEVULLIN, ISLE OF TIREE (REF: 15/03260/PP)Agreed
7SCOTTISH POWER RENEWABLES UK LIMITED: ERECTION OF 18 NO.This decision
8MR DEREK HAY: INSTALLATION OF 3 REPLACEMENT WINDOWS (INCLUDING FRONT DORMER), 2 REPLACEMENT DOORS (FRONT AND REAR ELEVATIONS) AND RE-RENDERING OF FRONT ELEVATION.Agreed 9MACLEOD CONSTRUCTION LIMITED: PROPOSED SUSTAINABLE URBAN DRAINAGE SYSTEM: LAND SOUTH OF DUNAVON, CONNEL (REF: 16/02889/PP)Agreed 10ARGYLL COMMUNITY HOUSING ASSOCIATION: ERECTION OF 6 DWELLINGHOUSES (AMENDMENT TO PLANNING PERMISSION 14/01752/PP FOR ERECTION OF 13 DWELLINGHOUSES AND DETACHED GARAGES AND FORMATION OF NEW VEHICULAR ACCESS ROADS) - REVISED HOUSE TYPES TO PLAgreed 11MR IAIN S MACLEAN: CERTIFICATE OF LAWFULNESS (EXISTING) FOR USE OF LAND FOR GENERAL STORAGE PURPOSES: LAND NORTH OF FALLS VIEW APARTMENTS, NORTH CONNEL (REF: 17/00042/CLAWU)On the agenda 12PROPOSED PROGRAMME OF PLANNING TRAINING FOR MEMBERSAgreed 13UPDATE ON RECENT SCOTTISH GOVERNMENT PLANNING APPEAL DECISIONSNoted 14LOCAL REVIEW BODY CONSIDERATION AND REQUEST FOR REVIEW OF EXSITING TREE PRESERVATION ORDER (TPO 08/99)Agreed 19The Council resolved in terms of Section 50(A)(4) of theOn the agenda 15ENFORCEMENT REPORT - REFERENCE 15/00120/ENOTH2Private 16ENFORCEMENT REPORT - REFERENCE 14/00046/ENOTH2Private 17ENFORCEMENT REPORT - REFERENCE 15/00150/ENOTH2Private 18ENFORCEMENT REPORT - REFERENCE 16/00076/ENAMENPrivate

Who was there

13 of 15 attended
RH
Rebecca HepburnSecretary, expected
DK
Councillor David KinniburghChair, present
GB
Councillor Gordon BlairMember, present
RC
Councillor Rory ColvilleMember, present
RC
Councillor Robin CurrieMember, present
GF
Councillor George FreemanMember, present
AM
Councillor Alistair MacDougallMember, present
NM
Councillor Neil MacIntyreMember, present
RG
Councillor Robert Graham MacIntyreMember, present
DM
Councillor Donald MacMillanMember, present
RM
Councillor Roderick McCuishMember, present
AM
Councillor Alex McNaughtonMember, present

All 15 on the meeting page

On this subject at Argyll and Bute

Search all
  1. SCOTTISH POWER RENEWABLES UK LIMITED: ERECTION OF 18 NO.This decision
  2. Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Agreed
  3. The scottish government on behalf of scottish power renewables (uk) limited: electricity act section 36 consultation for earraghail renewable energy development, comprising thirteen onshore wind turbines around 78mw, solar photovoltaic arraAgreed
  4. The scottish government on behalf of scottish hydro electric transmission plc: construction of approximately 13.3 km of 275 kv overhead line (ohl) from between a proposed substation at creag dhubh to the existing scottish power energy netwoAgreed
  5. Scottish hydro electric transmission plc: construction of approximately 13.3 km of 275kv over head line (ohl) from between a proposed substation at creag dhubh to the existing scottish power energy networks (spen) 275 kv ohl that runs fromAgreed
  6. The scottish government on behalf of drax cruachan expansion limited: electricity act section 36 consultation relevant to construction and operation of new underground power station and associated infrastructure adjacent to cruachan 1 to prAgreed

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies