Resolved
Decision The Argyll and Bute Local Review Body, having considered the merits of the case De Novo, unanimously agreed the Motion subject to the following conditions and reasons:- 1. The development shall be implemented in accordance with the details specified on the application form and the approved drawing reference numbers 2018_0004-00 2018_0004-01 2018_0004-02 2018_0004-03 2018_0004-04 2018_0004-05 2018_0004-06 2018_0004-07 unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. The first 5m of the driveway shall be covered in a bitumous or other hard surface. Reason: In the interests of road safety and to prevent loose material from spilling onto the existing access. 3. No development shall commence until details of a Sustainable Urban drainage system has been submitted to and approved by the Planning Authority. This shall be compliant with the guidance set out in CIRIA C753 and Sewers for Scotland 3rd Edition. The requisite surface water drainage shall be operational prior to the development being brought into use and shall be maintained as such thereafter. Reason: To ensure the provision of an adequate surface water drainage system and to prevent flooding. 4. No development shall commence until a scheme of boundary treatment, surface treatment and landscaping has been submitted to and approved by the Planning Authority. Thereafter the development shall proceed in accordance with the approved details. The scheme shall include details of: a. Location, design and materials of proposed walls, fences and gates; b. Surface treatment of proposed means of access and hardstanding areas. c. Any proposed re-contouring of the site by means of existing and proposed ground levels including details of any retaining walls. d. Any trees which within a period of ten years from the completion of the development die, or for whatever reason are removed or damaged shall be replaced in the next planting season with others of the same size and species, unless otherwise agreed in writing with the Planning Authority. Reason: To assist with the integration of the proposal with its surroundings in the interest of amenity. 5. No development shall commence until plans and particulars of the external finishes of the development, as specified in drawings 2018-0004-05 and 2008-004-07 have been submitted to and approved by the Planning Authority. This shall comprise the original stone which will be used to face the external walls of the replacement building. Thereafter the development shall proceed in accordance with the approved details. Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended, and in order to integrate the proposed dwellinghouse with its surroundings. 6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended), (or any Order revoking and re- enacting that Order(s) with or without modifications), nothing in Article 2(4) of or the Schedule to that Order, shall operate so as to permit, within the area subject ... view the full minutes text for item 3.