Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. The development shall be implemented in accordance with the details specified on the application form dated 6 February 2019 and the approved drawing reference numbers AL(0)001, AL(0)005, AL(0)006 Revision N, AL(0)030 AL(0)020 Revision AB unless the prior written approval of the planning authority is obtained for other materials/finishes/for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. Notwithstanding Condition 1 above, the finished floor level of the dwellinghouse hereby approved shall be a minimum of 5.5AOD. Reason: To ensure the proposed new dwellinghouse is not subject to flooding. 3. No development shall commence on site until authorisation has been given by Scottish Water for connection to the public water supply. Confirmation of authorisation to connect shall be provided to the Planning Authority for approval before commencement of development. Reason: To ensure that the development is adequately served by a public water supply. 4. No development shall commence until samples of materials to be used in the construction of the dwellinghouse hereby approved have been submitted to and approved in writing by the Planning Authority. The development shall thereafter be completed using the approved materials or such alternatives as may be agreed in writing with the Planning Authority. Reason: In order to integrate the development into its surroundings. 5. Prior to commencement of development a scheme of boundary treatment, surface treatment and landscaping shall be submitted to and approved in writing by the Planning Authority. The scheme shall include details of: i) Location, design and materials of proposed walls, fences and gates; ii) Surface treatment of proposed means of access and hardstanding areas; iii) Any proposed re-contouring of the site by means of existing and proposed ground levels. iv) Proposed hard and soft landscape works. The development shall not be occupied until such time as the boundary treatment, surface treatment and any re-contouring works have been completed in accordance with the duly approved scheme. All of the hard and soft landscaping works shall be carried out in accordance with the approved scheme during the first planting season following the commencement of the development, unless otherwise agreed in writing by the Planning Authority. Any trees or plants which within a period of ten years from the completion of the development die, for whatever reason are removed or damaged shall be replaced in the next planting season with others of the same size and species, unless otherwise agreed in writing with the Planning Authority. Reason: To assist with the integration of the proposal with its surroundings in the interest of amenity. 6. No development shall be commenced until details of the surface water drainage system to be incorporated into the development have been submitted to and approved in writing by the Planning Authority. Such measures shall show separate means for the disposal of foul and surface water, the provision of a Sustainable Urban Drainage System (SuDS), shall be located outwith the 200 year functional floodplain and shall include details of how it will be maintained. Suds should be designed in accordance with CIRIA C753 and Sewers for Scotland 4th Edition and include details of design calculations, method statement for construction, maintenance regime and ground investigation. The approved surface water drainage system shall be completed and brought into use prior to the development hereby approved being completed or brought into ... view the full minutes text for item 4.