Planning, Protective Services and Licensing Committee, Wednesday 20 September 2023 at 10.30am

MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF: 22/02523/PP)

Agreed Planning 4 papers

Planning, Protective Services and Licensing Committee agreed this item on Wednesday 20 September 2023. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes The development shall be implemented in accordance with the details specified on the application form dated 12 th December 2022, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location Plan 807(L)000A - 25.01.2023 Existing Site Plan 807(L)002A - 25.01.2023 Proposed Site Plan 807(L)002 Rev. B 09.08.2023 Proposed Plans, Sections and Elevations 807(L)003A - 25.01.2023 Tree Survey Plan 2016_015/01 - 13.12.2022 Location Plan with Passing Places 807(L)004 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. No development in relation to the construction of the dwellinghouse , hereby approved, shall commence until such time as the two passing places identified in drawing no 807(L)004 have been fully formed and surfaced. Notwithstanding the details shown on the approved plan, construction details for the proposed passing places shall be submitted to and approved in writing by the Planning Authority, in consultation with the Roads Authority, prior to implementation. Reason: In the interest of road safety. 3. PP - Junction with public road: Notwithstanding the provisions of Condition 1, the proposed access shall be formed in accordance with the Council’s Roads Standard Detail Drawing 08/006 Rev A. and visibility splays of 2.4 metres to point X by 25.0 metres to point Y from the centre line of the proposed access. The access road shall be a minimum width of 5.5m for the first 10m from the back of the service bay. Thereafter it may be reduced to a private driveway of minimum 3.5m width. The access shall be surfaced with a bound material in accordance with the stated Standard Detail Drawing for a minimum of 5.0m back from the edge of the carriageway. Prior to work starting on site the access hereby approved shall be formed to at least base course standard and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the access shall be completed prior to the development first being brought into use and the visibility splays shall be maintained clear of all obstructions thereafter. Reason: In the interests of road safety. Note to Applicant: A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from the Council’s Roads Engineers prior to the formation/alteration of a junction with the public road. The access shall be constructed and drained to ensure that no surface water is discharged onto the public road. 4. PP - Access Gradient Notwithstanding the provisions of Condition 1, the gradient of the service bay / access road / driveway shall not exceed 1 in 20 within 5 metres of the edge of ... view the full minutes text for item 5.
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee

Argyll and Bute Council Development & Economic Growth

Planning Application Report and Report of Handling as required by Schedule 2 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 relative to applications for Planning Permission or Planning Permission in Principle

Reference No: 22/02523/PP Planning Hierarchy: Local Applicant: [name removed]: Erection of dwellinghouse, formation of vehicular access and associated works Site Address: Garden Ground of Torwood House, Torwoodhill Road, Rhu, Helensburgh, Argyll And Bute

DECISION ROUTE

☐Delegated - Sect 43 (A) of the Town and Country Planning (Scotland) Act 1997

☒Committee - Local Government Scotland Act 1973

(A) THE APPLICATION

(i) Development Requiring Express Planning Permission  Sub-division of curtilage of single residential development to create a site for erection of a new separate dwellinghouse  Erection of a dwellinghouse  Formation of access and driveway  Associated land engineering works/re-profiling existing ground levels  Installation of surface water drainage system

(ii) Other specified operations  Connection to existing public water supply network  Connection to existing public drainage network

(B) RECOMMENDATION:

It is recommended that planning permission be refused.

(C) CONSULTATIONS:

ABC Roads (08.03.2023): Torwoodhill Road, in its current layout is considered unsuitable to serve the existing properties and the proposed new development. It is recommended that determination of the application be deferred until details of commensurate improvements to Torwoodhill Road are submitted for assessment.

Report of Handling Template for PPSL and Delegated Planning Applications – Updated 08.03.2023 Commensurate improvements should include the creation of 2No. intervisible passing places between the Upper Torwoodhill Road junction and the access to the proposed. This could include the creation of a ‘Service Bay’ access arrangement at the access to the proposed development.

ABC Local Biodiversity Officer (21.02.2023): 1) The submitted Tree Report does not provide advice on the timing for opening up the site for foundation construction with reference to impact on birds. 2) Requests a planning condition requiring a pre-start ecological survey to be carried out in advance of excavation works, if it is proposed to commence during the bird nesting season. 3) Advises that good practice measures e.g. pipe end capping and escape ramps from foundation/services trenches should implemented during construction to avoid trapping animals. 4) Advises that submission, assessment and approval of a Landscape Design Planting Plan be required by planning condition.

ABC Built Heritage & Conservation Officer (22.02.2023: Planning Permission Ref 16/03045/PP was granted for the sub division of the plot and proposed new dwellinghouse. Whilst the same LDP is currently in place, there has been a material change in that the NPF4 has now been adopted which requires to be taken into account as part of a proper assessment of the current application. It is not considered that the supporting information submitted as part of the Planning Statement provides sufficient assessment of the character of the conservation area and the properties (both listed and un-listed within it) to allow a full assessment against the provisions of NPF4 Policy 7. Notwithstanding the above required information, initial concern is expressed that: 1) the proposed development is at odds with the existing pattern of development/urban grain; and, 2) there is a lack of justification for the architectural style of the proposed house in relation to the mixture of distinct architectural styles for existing houses within the area. It is suggested that the applicant submits a more comprehensive assessment of the historic assets and the likely impacts of the proposal which may help to address these concerns.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
22.02523_PPSL RoH_torwood FINALReport 547 KB DownloadRead as text
PDF
2202523PP PPSL SR_1 FINALReport 309 KB Download
PDF
2202523PP plan, 21/06/2023 Planning, Protective Services and Licensing Committee, 11/09/2023 Pre-Agenda Briefing of the Planning, Protective Services and Licensing CommitteeAgenda 621 KB Download
PDF
MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF: 22/02523/PP)Supplementary 386 KB Download

At this meeting

Whole meeting

Who was there

13 of 15 attended
JA
Councillor John ArmourMember, present
GB
Councillor Gordon BlairMember, present
JB
Councillor Jan BrownMember, present
AF
Councillor Audrey ForrestMember, present
KG
Councillor Kieron GreenChair, present
AH
Councillor Amanda HampseyVice-Chair, apologies
DH
Councillor Daniel HampseyMember, apologies
GH
Councillor Graham HardieMember, present
MI
Councillor Mark IrvineMember, present
AK
Councillor Andrew KainMember, present
PD
Councillor Paul Donald KennedyMember, present
LM
Councillor Liz McCabeMember, present

All 15 on the meeting page

On this subject at Argyll and Bute

Search all
  1. MR D HIGGINS: ERECTION OF DWELLINGHOUSE, FORMATION OF VEHICULAR ACCESS AND ASSOCIATED WORKS: GARDEN GROUND OF TORWOOD HOUSE, TORWOODHILL ROAD, RHU, HELENSBURGH (REF: 22/02523/PP)This decision
  2. Mr d higgins: erection of dwellinghouse, formation of vehicular access and associated works: garden ground of torwood house, torwoodhill road, rhu, helensburgh (ref: 22/02523/pp)Agreed

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies