Resolved
DECISION The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 22.04.2024; supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location Plan 2023_0008_00 23.04.2024 Site Plan – As Existing 2023_0008_02 23.04.2024 Site Plan 2023_0008_03 23.04.2024 Site Plan – As Proposed 2023_0008_01B 23.04.2024 Original ground level survey 25.07.2024 Plans and Elevations of Water Tanks 2023_008-04 23.10.2024 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. PP – Vehicular Access Within 3 months of the date that planning permission has been granted, plans and particulars of the means of vehicular access to serve the development shall be submitted to and approved by the Planning Authority in consultation with the Roads Authority. Such details shall incorporate: · An additional passing place at a location between Kilbowie Lodge and Tigh -a- Chaolais . · Additional passing places in the section of road from the site access to the junction with the U24 Glenshellach Road; · Additional road marking and signage to be installed for road safety issues. Details and location to be agreed with Roads; · Access at junction with public road to be constructed in accordance with Operational Services Drawing no SD08/004(Rev b) · No walls, fences, hedges etc greater than 1m in height will be permitted within 2m from the channel line of the public road. Visibility splays measuring 53m x 2.4m to be cleared and maintained; · A system of surface water drainage is required to prevent water passing onto the public road; · Parking and turning commensurate with the units is to be provided; · Refuse collection points to be provided at locations easily accessed and service by RCV. · Turning heads required within internal roads serving site. The upgrades to the public road and the existing private access track (within ownership control of the applicant) shall be completed within 6 months of the date this permission or prior to the occupation of any of the additional units/caravans/lodges hereby permitted at the site (whichever occurs the first). Reason: In the interests of road safety . 3. PP – Surface Water Drainage – Further detail required Notwithstanding the provisions of Condition 1, the development shall incorporate a surface water drainage system which is consistent with the principles of Sustainable urban Drainage Systems ( SuDS ) compliant with the guidance set out in CIRIA’s SuDS Manual C753. Post development surface water runoff should be attenuated to pre-development amounts. The requisite surface water drainage shall be operational within 6 months of the date of this permission or prior to the occupation of any of the additional units/caravans/lodges hereby permitted at the site (whichever occurs the first). Reason: To ensure the provision of an adequate surface water drainage system and to prevent flooding . Note to Applicant: Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale Development – www.sepa.org.uk 4. PP – Landscaping Scheme and Biodiversity Enhancement Measures Within 3 months from the date of planning permission having been granted, scheme of boundary treatment, surface treatment and landscaping shall be submitted to and approved in writing by the Planning Authority. The scheme shall comprise a planting plan and schedule which shall include details of: (i) Existing and proposed ground levels in relation to an identified fixed datum; (ii) Existing ... view the full minutes text for item 4.