Resolved
Decision The Committee agreed the following conditions and reasons be attached to planning permission reference 24/01249/PP: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated; 1st July 2024, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location Plan 2024_0023_00A 22.08.2024 Existing Site Plan 2024_0023_01A 22.08.2024 Proposed Site/Landscape Plan 2413.03 101 01.07.2024 Topographical Survey 01.07.2024 Visualisation of Boundary Wall 02.08.2024 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. Operational use There shall be no more than 30 cars on the site at any time, unless otherwise agreed in writing with the planning authority and no individual car shall remain on the site for a continuous period of more than a year. A register of all cars stored for longer than a month including their registration numbers, dates the car was placed on the site and left the site shall be maintained by the Site Owner and shall be available at all reasonable times for inspection by the Planning Authority. Reason: In order to define the limits of the permission and to ensure cars are not abandoned on site for over a year and become unsightly. 3. PP – Environmental Management Plan No development shall commence on the laying of the car park surfacing or hard landscaping until a full site specific Environmental Management Plan (in the form of a proposed Construction Procedures Handbook) has been submitted to and approved in writing by the Planning Authority. The Plan shall address requirements arising from the construction of the car storage area and, shall inform the production of construction method statements, and shall specify the siting of working areas, soil management practices, measures to prevent pollution of watercourses and environmental site monitoring. The development shall be implemented in accordance with the requirements of the duly approved Construction Procedures Handbook, copies of which shall be maintained available on site for the duration of construction works. Reason: In the interests of pollution control. 4. PP - Junction with public road: Notwithstanding the provisions of Condition 1, the proposed access shall be formed in accordance with the Council’s Roads Standard Detail Drawing SD 08/005B; and visibility splays of 42 x 2.4 x 1.05 metres measured from the edge of the carriageway. The first 3m of the access shall be surfaced with a bound material and be a width of 3.6m, increasing to 3.7m if bound by walls in accordance with the stated Standard Detail Drawing. Prior to any car park formation construction works being undertaken the access hereby approved shall be formed to at least base course standard and the visibility splays shall be cleared of all obstructions such that nothing shall disrupt visibility from a point 1.05 metres above the access at point X to a point 0.6 metres above the public road carriageway at point Y. The final wearing surface on the access shall be completed prior to the development first being brought into use and car being stored on site and the visibility splays shall be maintained clear of all obstructions thereafter. Reason: In the interests of road safety. Note to Applicant: A Road Opening Permit under the Roads (Scotland) Act 1984 must be obtained from the Council’s Roads Engineers prior to the formation/alteration of a junction with the public road. The access shall be constructed and drained to ensure that no surface water is discharged onto the public road. 5. Pedestrian Visibility and Gates Any access gates should be sited at least 6 metres from the rear of the footway and must be hung so that they do not open towards the carriageway and pedestrian visibility splay of 2.4 m x 2.4 x 0.9m measured from the rear of the footway must be achieved and maintained in perpetuity. Reason: In the interests of pedestrian and road safety to allow an entering vehicle to stop clear of the footway when the gates are closed. 6. PP - Parking and Turning As Shown The parking and turning area shall be laid out and surfaced in accordance with the details shown on the approved plans prior to the cars being stored on site and shall thereafter be maintained clear of obstruction for the parking and manoeuvring of vehicles. Reason: In the interest of road safety. 7. PP – Surface Water Drainage – Further detail required Notwithstanding the provisions of Condition 1, no development shall commence until details of the intended means of surface water drainage to serve the development have been submitted to and approved in writing by the Planning Authority, in consultation with the Council’s Flood Advisors. The duly approved scheme shall be implemented in full concurrently with the development that it is intended to serve and shall be operational prior to the cars being stored on the ... view the full minutes text for item 5.