Resolved
Decision The Committee noted the contents of the report. (Reference: Report by Head of Development and Economic Growth dated 2 June 2025, submitted)
Planning, Protective Services and Licensing Committee noted this item on Wednesday 18 June 2025. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision The Committee noted the contents of the report. (Reference: Report by Head of Development and Economic Growth dated 2 June 2025, submitted)
2.1Members are asked to note the contents of the report.
3. REPORTER’S CONCLUSIONS (Extracts from Appeal Decision)
3.1The flood study estimates that the peak flow from the ‘third pipe’ (originating from Kilmahew Avenue) would generate a peak flow of 155 litres per second, which would represent 0.6% of the design flow of the Geilston Burn. The study concludes that this would bring no increased flood risk to existing properties. Given the relative sizes of the catchment area of the Geilston Burn (stated to be 7.2 square kilometres with only a very small proportion being downstream of the site) and of the much smaller Kilmahew Avenue/ Court estate, it does seem inevitable that any flows from the latter must contribute only a very small proportion of overall flow in the Geilston Burn. The photograph of the Geilston Burn in spate that has been submitted does show some overtopping of the river bank but does not demonstrate that flood waters approached the level of The Glen property itself.
3.2Regarding other matters raised in representations, I do not consider that the
7 Classification: OFFICIAL
discharge of drainage water would constitute development in a flood risk area and so be contrary to NPF4. I am satisfied that the calculations in appendix D of the appellant’s Drainage Strategy Report are reasonably concerned with the drainage of the appeal site itself and the successful operation of its SUDS system and are not intended to address flows in the ‘third pipe’. It is not my role to conduct a comparative study of the different drainage options that may be available, but to assess the suitability of the arrangements being proposed by the appellant. The need or otherwise to gain the landowner’s consent to discharge waters into the Mill Dam pond is a legal matter not pertinent to this decision.
3.3As regards drainage, I find that the submissions demonstrate to my satisfaction that the development will not increase the risk of off-site surface water flooding, and that it therefore complies with NPF4 Policy 22(c) in this regard. Surface water arising on the appeal site is managed through SUDS as required by LDP Policy 61. I do not consider that this policy requires the appellant to manage the water arising from the existing Kilmahew Avenue estate. The council’s professional advisors on flooding matters are content that the appellant’s submissions meet the required technical standards. The professional evidence before me therefore firmly favours the appellant’s position. Overall, I conclude that the requirements of condition 11 have been satisfied.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Update on Recent Kirkton Farm Housing (AMSC) Appeal DecisionDecisions | 135 KB | DownloadRead as text |
Follow Planning, Protective Services and Licensing Committee at Argyll and Bute and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.