Resolved
Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 22.10.2024; supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Location plan *1 of 5 23.10.2024 Site Plan *2 of 5 23.10.2024 Access Route Plan *3 of 5 24.10.2024 Outline Arrangement of Met Mast *4 of 5 24.10.2024 Peat Depth Figure *5 of 5 31.04.2025 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. Duration Restriction The permission shall be for a period of 48 months from the commencement of the development, the date of which shall be notified in writing to the Planning Authority. Within three months of the end of the 48 month period, unless a further planning application is submitted and approved, the meteorological mast and associated equipment shall be dismantled and removed from the site and the land reinstated to the satisfaction of the Planning Authority. Reason: To define the permission and in order to protect the amenity of the locale. 3. Construction Details The wind monitoring mast shall not be erected until full details of ground anchors including mast base, foundations and any fencing to protect both livestock and mast and full reinstatement details and safety and operating maintenance details, have been submitted to and approved by the Planning Authority in consultation with Scottish Natural Heritage. Reason: To allow the Planning Authority to consider these aspects in detail and in the interest of site restoration. 4. Bird Flight Diverters Notwithstanding the provisions of Condition 1 above, bird flight diverters (BFDs) with stops or clamps shall be fitted to all guy wires at even intervals of 5 metres from the ground upwards. The mast thereafter shall be monitored and maintained annually for its lifetime to ensure diverters remain in place and as necessary, missing diverters be replaced. Reason: In the interests of natural heritage, in order to reduce the potential for avian casualties. 5. Aviation Lighting Prior to commencing construction of any meteorological masts, or deploying any construction equipment or temporal structure 50 metres or more in height (above ground level) the undertaker must submit an aviation lighting scheme for the approval of Argyll and Bute Council in conjunction with the Ministry of Defence defining how the development will be lit throughout its life to maintain civil and military aviation safety requirements as determined necessary for aviation safety by the Ministry of Defence. This should set out: a) details of any construction equipment and temporal structures with a total height of 50 metres or greater (above ground level) that will be deployed during the construction of the meteorological mast and details of any aviation warning lighting that they will be fitted with; and b) the location and height of the meteorological mast identifying the position of the lights on the mast; the type(s) of lights that will be fitted and the performance specification(s) of the lighting type(s) to be used. Thereafter, the undertaker must exhibit such lights as detailed in the approved aviation lighting scheme. The lighting installed will remain operational for the lifetime of the development. Reason: To maintain aviation safety. 6. Aviation Charting and Safety Management The undertaker must notify the Ministry of Defence, at least 14 days prior to the commencement of the works, in writing of the following information: a) the date of the commencement of the erection of meteorological masts; b) the maximum height of any construction equipment to be used in the erection of the meteorological masts; c) the date any meteorological masts are brought into use; d) the latitude and longitude and ... view the full minutes text for item 5.