CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Argyll and Bute Council
Planning, Protective Services and Licensing Committee, Wednesday 19 August 2026 at 10.30am

FABULOUSLY SCOTTISH HOTELS (OBAN) LTD: ERECTION OF HOTEL: CAR PARK, SHORE STREET, OBAN (REF: 21/01584/PP)

Agreed Planning 2 papers

AI summaryArgyll and Bute planning committee approves hotel on Shore Street car park, Oban, as a minor departure to the Local Development Plan, with conditions on drainage, waste, materials, landscaping and biodiversity.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeAgreedSubject to conditions, on Shore Street, Oban
MoneyNot stated
What happens nextNot stated
Who it affectsNot stated

What was decided

The committee agreed to grant planning permission as a minor departure to the Local Development Plan for the erection of a hotel on the Shore Street car park, Oban. Report P5

The permission is subject to a standard time limit, a standard soil management condition, and additional conditions covering approved details, finishing materials, sustainable drainage, waste management, and landscaping and biodiversity enhancement.

The development must be built in line with the application form dated 30/07/21 and the approved drawings including Floor Plans, Perspective View, Elevations, Site Plan, Location Plan and the Daylight and Sunlight Report.

Why

The application is being treated as a minor departure to the Local Development Plan, rather than refused or approved in full conformity.

The site lies on Shore Street, Oban, near the Oban Ferry Terminal, with surrounding uses including a Health Centre, Library and Cawdor House shown on the location plan. Report P5, P22, P24

What happens next

Samples of finishing materials must be submitted to and approved by the Planning Authority before any development begins.

A surface water drainage system consistent with SuDS principles (CIRIA C753 and Sewers for Scotland 4th Edition) must be in place before the hotel is brought into use.

A Waste Management Strategy and a soft landscaping and biodiversity enhancement scheme must both be submitted and approved before development commences.

Options considered

  • Chosen: Grant planning permission as a minor departure to the Local Development Plan, with conditions

Implications

  • Environment and climate: A Sustainable Drainage System must be installed and maintained to prevent flooding.
  • Other: Landscaping and biodiversity enhancement details are required before development starts, in line with NPF4 Policy 12 on waste and with planning policy aims to integrate the building into its surroundings.
  • Legal: Any change to the approved details would need prior written approval from the planning authority under Section 64 of the Town and Country Planning (Scotland) Act 1997.

Who and where

  • Fabulously Scottish Hotels (Oban) Ltd, the applicant
  • Users and neighbours of the Shore Street car park site, Oban, including those near the Oban Ferry Terminal Report P5
  • Nearby established uses including a Health Centre, Library and Cawdor House Report P22, P24

Timeline

  • 30/07/21: Application form submitted
  • 02/08/21: Perspective View, Elevations, Site Plan and Location Plan received
  • 22/09/21: Revised Floor Plans received (version D)
  • 13/12/21: Shore Street Hotel Daylight and Sunlight Report received
  • 19/08/2026: Planning, Protective Services and Licensing Committee considered and decided the application

Plain English for the jargon

  • Minor departure: A planning decision that departs from the policies of the Local Development Plan but is considered acceptable by the council.
  • SuDS: Sustainable urban Drainage Systems, a way of managing surface water runoff to reduce flood risk.
  • CIRIA C753: The industry manual setting out the standards for Sustainable Drainage Systems in the UK.
  • NPF4: National Planning Framework 4, the Scottish Government's national planning policy document.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item5

Resolved

Decision The Committee agreed to grant planning permission as a minor departure to the Local Development Plan subject to the following conditions and reasons: Standard Time Limit Condition (as defined by Regulation) Standard Condition on Soil Management During Construction Additional Conditions 1. PP - Approved Details & Standard Notes – Non EIA Development The development shall be implemented in accordance with the details specified on the application form dated 30/07/21, supporting information and, the approved drawings listed in the table below unless the prior written approval of the planning authority is obtained for an amendment to the approved details under Section 64 of the Town and Country Planning (Scotland) Act 1997. Plan Title. Plan Ref. No. Version Date Received Floor Plans – Scheme Design 1509 05 D 22/09/21 Perspective View, Section – Scheme Design 1509 10 02/08/21 Elevations – Scheme Design 1509 11 02/08/21 Site Plan – Scheme Design 1509 12 B Location Plan 02/08/21 Shore Street Hotel – Daylight & Sunlight Report – 17 PAGES 13/12/21 Reason: For the purpose of clarity, to ensure that the development is implemented in accordance with the approved details. 2. PP - Finishing Materials Notwithstanding the effect of Condition 1, no development shall commence until samples of materials to be used in the construction of the development hereby approved have been submitted to and approved in writing by the Planning Authority. The development shall thereafter be completed using the approved materials or such alternatives as may be agreed in writing with the Planning Authority. Reason: In order to integrate the development into its surroundings. 3. PP – Sustainable Drainage System Notwithstanding the provisions of Condition 1, the development shall incorporate a surface water drainage system which is consistent with the principles of Sustainable urban Drainage Systems (SuDS) compliant with the guidance set out in CIRIA’s SuDS Manual C753 and sewers for Scotland 4 th Edition. The requisite surface water drainage shall be operational prior to the development being brought into use and shall be maintained as such thereafter. Reason: To ensure the provision of an adequate surface water drainage system and to prevent flooding. Note to Applicant Further advice on SuDS can be found in SEPA’s Standing Advice for Small Scale Development – www.sepa.org.uk . 4. PP - Waste Management Notwithstanding the effect of Condition 1, no development shall commence until a Waste Management Strategy for the development has been submitted to and approved in writing by the Planning Authority. The Waste Management Strategy shall include details of how much waste the proposal is expected to generate and how it will be managed including: i. Details of provisions to maximise waste reduction and waste separation at source; ii. Details of measures to minimise the cross-contamination of materials, through appropriate segregation and storage of waste; convenient access for the collection of waste; and recycling and localised waste management facilities. Thereafter the development shall be undertaken in accordance with the approved Waste Management Strategy unless otherwise agreed in writing with the Planning Authority. Reason: In order to comply with the requirements of NPF4 Policy 12. 5. PP - Landscaping and Biodiversity Enhancement Notwithstanding the effect of Condition 1, no development shall commence until details of the proposed treatment of the soft landscaping areas within the development has been submitted to and approved in writing by the Planning Authority. The scheme shall include details of: i. Location, design and materials of proposed walls, fences and ... view the full minutes text for item 5.
Word for word from the decision Argyll and Bute published for this meeting. Source: www.argyll-bute.gov.uk

Follow this further

Built from Argyll and Bute's papers

What the report saysPro

Report to Planning, Protective Services and Licensing Committee

g

rfr Hi

o a n Ps

nt Me

ES S FB Tank n t io a (St Car Park banESS /O Oban Ferry Terminal Mast ban t -Ò An 56 rds Bolla

Application Site FB h n on Jo ders e gation Light ET reen White Green) E s R AnHou 1t E ST Ha ll

OR o1 nding Stage 2 SH

Car Park p ot

So De on

rti ipway er e e s )

n ace m s ic

g l CaHout Off 1t L Twr P o3 r l

Of do te Ho S

w

fic Ca ov LW

4t G

e o6 ER

( M

Y PI

EE 7 R ST LWA

ANY B AL RAI

35 Health Centre

6 o1 10.1m 1t ents m Ha

art Cawdor House p ll

PW 2 yA 10

to3 n ba to

17 Al 15 16

9.4m ce to

rra 21

r Te 0 12.5 25 50 Meters o Liby wd 1 9

a 2 C to

3 32 7

4 DR

Location Plan relative to: 21/01584/PP O IMV

SHE EN AR

GL GIE

© Crown Copyright and database right 2025 All rights reserved. OS license (customer) account number AC0000849384 RO A

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
2101584PPReport 946 KB DownloadRead as text
PDF
FABULOUSLY SCOTTISH HOTELS (OBAN) LTD: ERECTION OF HOTEL: CAR PARK, SHORE STREET, OBAN (REF: 21/01584/PP)Report 486 KB Download

At this meeting

Whole meeting

Who was there

7 of 14 attended
KM
Katie McKenzieSecretary, expected
GB
Councillor Gordon BlairChair, present
JB
Councillor Jan BrownMember, present
KG
Councillor Kieron GreenVice-Chair, present
DH
Councillor Daniel HampseyMember, apologies
GH
Councillor Graham HardieMember, apologies
FH
Councillor Fiona HowardMember, apologies
WH
Councillor Willie HumeMember, present
AK
Councillor Andrew KainMember, apologies
PD
Councillor Paul Donald KennedyMember, apologies
RK
Councillor Reeni Kennedy-BoyleMember, present
LM
Councillor Liz McCabeMember, apologies

All 14 on the meeting page

More from Argyll and Bute Planning, Protective Services and Licensing Committee

All decisions
MeetingDecisionOutcome
15 Sep 2026 Beaufort wind limited: erection of 7 turbines (up to 149.9m to tip) and ancillary development and decommissioning of existing beinn ghlas wind farm: existing beinn ghlas wind farm, taynuilt (ref: 25/01240/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: 1. PP - A... Agreed Open
15 Sep 2026 Mr tony coogan: alterations to guesthouse to facilitate lawful use of existing roof space as ancillary guest house owner's accommodation: greencourt, benvoullin road, oban (26/00434/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Mrs faulkes: proposed alterations and erection of extension: 30 the green, craobh haven (ref: 26/01009/pp)Decision The Committee agreed to grant planning permission subject to the following conditions and reasons: Standard ... Agreed Open
15 Sep 2026 Scottish power renewables/machair wind limited: scottish government's marine directorate section 36 consultation on proposed machair offshore wind farm: site 15 km north west of isle of islay and 12.4 km west of isle of colonsay (ref: 26/01100/s36)Decision The Committee agreed that the Scottish Government’s Marine Directorate should be notified that Argyll and Bu... Agreed Open
15 Sep 2026 Development management performance update - fq1 2026/27Decision The Committee reviewed and agreed the content of the report. (Reference: Report by Executive Director with r... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies