DECISIONS 1. That progress with Climate Change during 2008/2009 be noted. 2. That the Leicestershire Climate Impacts Profile Study outcomes attached at Appendix 1 of the report of the Environmental Protection Group Manager and the recommendations summarised in paragraph 6.4 of the report (which forms the basis of Levels 0 and 1 of NI 188) be approved. 3. To note the work required to achieve the target for NI 188 during 2009/2010. Reasons: 1. Blaby District Council adopted its Climate Change Action Plan during October 2008 (minute number 240 2008/2009 refers). This sets a target for adaptation to Climate Change (NI 188) which has been achieved for 2008/2009. 2. The Council is committed to the Nottingham Declaration on Climate Change and is therefore required to embed the management of climate risks and opportunities across all levels of services and plans.
Word for word from the decision Blaby published for this meeting.Source: democracy.blaby.gov.uk
Climate Change Adaptation Risk Register - List of potential risks to council services from future climate change The Impact and Probability are scored between 1 and 3 (1 low risk 3 high risk). These are multiplied together to give a score between 1 - 9. This is then multiplied by the influence the council has over this risk (scored between 1 - 3, 3 highest influence, 1 little or no influence) to give the final overall risk rating. Overall Type Risk? (Effect) Result Impact Probability Score Influence Risk 2 Lack of capacity in the There is an increasing probability of The council has storm/sewer and System unable to The impacts of such events occurring as the some Flash highway drainage cope with increased this type of frequency and intensity of extreme responsibility Flooding system due to lack of rainfall and speed of flooding will be rainfall events increases and the 6 12 working with the Pluvial (Rain) maintenance and runoff leading to severe but sewer system reaches capacity and water service cleaning or localised flooding localised maintenance is reduced to a reactive company (Severn inadequate size basis by the water service companies Trent) 1. Residents unable to use road network 2 2. The council The council has employees unable to shared get to work reponsibility for The impacts of development 3. The council the road network control and street employees unable to flooding will have The probability of the road network Road network flooding cleaning with deliver key services more significant flooding will increase as the duration due to flash storm 6 LCC has total 12 due to disruption to implications than and intensity of localised rainfall events responsibility for transport network that of flooding of events increases maintenance and 4. Disruption to public the sewer operation of the transport network road network with 5. Emergency exception of vehicles unable to major trunk reach victims of routes flooding The impacts will 2 Risk of infection Workplace/homes be very localised The council has a residents/employees unsuitable for As flood risk increases so does the but with responsibility to where occupancy until risk of infection from polluted 2 4 significant health ensure that it's homes/workplaces thorough clean up floodwater implications for buildings are fit have been flooded has taken place those affected for purpose The impacts will As flood risk increases so does the Floodwaters polluting No access to clean be localised but risk of contamination in drinking water 2 1 4 clean drinking water drinking water significant for from polluted floodwater those affected
2 The council working with the Very significant Environment or catastrophic Agency (EA) and Fluvial Damage to property Rising river floodwater impact to those water service Flooding and infrastructure, Very probable that flood risk will damaging property residents within 9 company (ST) 18 (Main huge cost of clear up, increase due to climate change and infrastructure the floodplain of has some watercourses) health risk etc the river and responsibility to main waterways safeguard residents from the threat of flooding
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.