Hillhouse Enterprise Zone: Progress Report
Masterplan and Baseline Report
The Mott MacDonald led master planning consultancy team, with IBI Group and How Planning have completed the Hillhouse Technology Enterprise Zone Masterplan (see Appendix 1 Hillhouse Technology EZ Masterplan November 2018) and the Baseline Report.
Following Portfolio Holder approval in April 2018, Public and Statutory Consultation finished on 1 November 2018. On 12 October a ‘Drop in Event’ at Thornton FC was held from 1pm – 6pm, which was well attended.
In total, 33 responses from individuals and organisations were received during the three week consultation period. All responses received have been fully reviewed and considered and this has led to a number of proposed modifications to the masterplan
The consultation comments received have been analysed and considered to enable the Masterplan to be finalised. (see Appendix 2 Consultation Report 2018)
The Masterplan will be considered at the Cabinet meeting on November 28th.
Marketing
A Marketing Strategy for Hillhouse Enterprise Zone will be prepared in house and will complement the Delivery (Implementation) Plan and the Masterplan. The Strategy will complement the overarching Lancashire Advanced Manufacturing Energy Cluster (LAMEC) branding and marketing approach adopted for the four Lancashire EZ’s.
New site signage will be installed at three locations around the EZ boundary. Ground surveys have now been undertaken and installation can commence once advertisement consent has been granted. www.hillhouseez.com is now live. There is some development work to add context to the site including an enquiry handling form, news feed page and some interactive layers which describe in detail the different EZ sites in Lancashire.
Implementation / Delivery Plan
Work commenced on the detailed EZ Delivery Plan earlier this year. Now that the Masterplan is completed work to complete the Delivery Plan has recommenced in conjunction with consultants Genecon, utilising initial data from the Masterplan and Baseline Report. The delivery plan will be prepared in line with the Masterplan. The delivery plan will account for capital and revenue expenditure required to deliver the EZ. Main issues that need to be addressed are:
State Aid in terms of major land owners NPL Group To consider the recommendations made in the Masterplan regarding undertaking specific surveys and assessments of the whole site Produce a 5 year forecast with a detailed plan for the 1st Phase (3 years) including a cost plan Costings for detailed site surveys, including Flood Risk Assessment and highway assessment
We will continue to work with Genecon and NPL Group to develop the plan and envisage a first draft be completed by January 2019.
Forthcoming Activity
i) Draft Delivery Plan by January 2019 ii) A flood risk assessment to be commissioned for the entire site iii) A transport assessment is advised to be commissioned for the entire site iv) An Environmental and Ecology study to be commissioned for the entire site v) The planning application process for the gas fired power station, will be monitored and support offered as appropriate vi) Advice will be obtained on potential State Aid implications of public funding of enabling infrastructure – within this designated EU assisted area vii) Completing draft Marketing Strategy
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Hillhouse EZ MasterplanAppendix 1 | 67 pages | Download |
PDF |
Consultation Report Nov 2018Appendix 2 | 17 pages | Download |
PDF |
HILLHOUSE TECHNOLOGY EZ PROGRESS REPORT (STANDING ITEM)Report | 2 pages | DownloadRead as text |
Follow Blackpool, Fylde and Wyre Economic Prosperity Board at Blackpool and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 14 Mar 2024 | Appointment of chairmanThat Councillor Mark Smith be appointed Chairman for the meeting. | Decided | Open |
| 14 Mar 2024 | Exclusion of public and pressThat the public and press be excluded from the meeting whilst the agenda items 7 and 8 are considered, on the ground ... | Decided | Open |
| 14 Mar 2024 | Minutes of the last meeting held on 7 december 2023That the minutes of the meeting held on 7 December 2023 be approved and signed by the Chair as a correct record. | Approved | Open |
| 14 Mar 2024 | Fylde coast green growth updateThat the update be noted. | Noted | Open |
| 7 Dec 2023 | Appointment of chairThat Councillor Mark Smith be appointed Chair of the Blackpool Fylde and Wyre Economic Prosperity Board for the meeting | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.