CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Blackpool Borough Council
Blackpool, Fylde and Wyre Economic Prosperity Board, Tuesday 7 January 2020 at 2.00pm

FUTURE HIGH STREET FUND: FYLDE COAST TRAMWAY LOOP

Agreed Committee 1 paper

Blackpool, Fylde and Wyre Economic Prosperity Board agreed this item on Tuesday 7 January 2020. Below is the council's own wording, with the papers it was decided on.

Item5

Resolved

It was agreed that it was essential that the brief for a study must build on the work of the existing studies and look at all the issues regarding connectivity between the three authority areas and the town centres, including connections to existing heavy ... view the full minutes text for item 5.
Word for word from the decision Blackpool published for this meeting. Source: democracy.blackpool.gov.uk

Follow this further

Built from Blackpool's papers

What the report saysPro

Report to Blackpool, Fylde and Wyre Economic Prosperity Board, 4 pages

Background

The Fylde Coast is served by heavy rail by the North Fylde Line, recently electrified, and the South Fylde Line branching off at Kirkham and Wesham, which is single track to its terminus (Blackpool South railway station). Since electrification, the disused single track railway from south Fleetwood no longer connects at Poulton-le-Fylde.

The Blackpool Tramway, fully upgraded in 2012, operated successfully by Blackpool Transport along the coast from Starr Gate (Blackpool/Fylde border) to Fleetwood Ferry (Wyre). An extension to Blackpool North railway station is currently under development.

The proposal is to investigate the feasibility of two further extensions to the tramway, creating two tram/rail interchanges, with the aim of creating a more cohesive Fylde Coast public transport system, boosting Blackpool, Kirkham and Fleetwood town centres.

3. Proposition:

Following the discussion at the last Board meeting it is proposed that each local authority includes within their FHSF submission, a bid for resources in order for Blackpool Council, in conjunction with Lancashire County Council as transport authority for Fylde and Wyre, to undertake a comprehensive feasibility study to recommend a sufficiently developed preferred option, which will be capable of being implemented if a future funding opportunity becomes available.

4 It is important that this opportunity is pursued to prepare the way to develop the tramway network further to enhance the sub-region in terms of accessibility, regeneration and environmental sustainability and support important economic sectors such as tourism.

A more efficient and effective, modern and reliable, public transport system could be created by operating continuous tramlines between Kirkham and Wesham and Poulton-le- Fylde via Lytham St Anne’s, Blackpool, Cleveleys, Fleetwood and Thornton. A tramway loop would also serve Blackpool Airport Enterprise Zone, Blackpool Pleasure Beach and Hillhouse International Enterprise Zone.

In the north, the tramway would utilise the trackbed of the disused railway line between south Fleetwood and Poulton-le-Fylde. To the south, the tramway would use the trackbed of what is currently an operational railway, with an hourly service to Preston operated by Northern Railway. Clearly, this operator and Network Rail, who own and are responsible for the two branch lines would need to support the proposal.

It should be stressed that the proposal is to undertake a business case study, which may or may not conclude the above is feasible, deliverable and would offer value for money, in accordance with a WebTAG appraisal, necessary for all major transport schemes. A healthy Benefit Cost Ratio (BCR) of >2:1 would be the ideal. The outputs would be an initial options report and then a comprehensive business case for the preferred option, which would reference previous options appraisal work undertaken. It is estimated that a comprehensive business case study would cost c£2m, which would be split equally between the Councils.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
FUTURE HIGH STREET FUND: FYLDE COAST TRAMWAY LOOPReport 4 pages DownloadRead as text

At this meeting

Whole meeting

Who was there

2 of 9 attended
SB
Councillor Simon BlackburnCommittee Member, expected
YB
Yvonne BurnettSecretary, expected
AC
Alan CavillOfficer, present
NG
Nick GerrardOfficer, present
LH
Lorraine HurstSecretary, expected
NJ
Neil JackOfficer, expected
AL
Antony LockleyOfficer, expected
MS
Councillor Mark SmithCommittee Member, expected
MT
Mr Mark TowersSecretary, expected

On this subject at Blackpool

Search all
  1. FUTURE HIGH STREET FUND: FYLDE COAST TRAMWAY LOOPThis decision
  2. Future high streets fund updateNoted

More from Blackpool Blackpool, Fylde and Wyre Economic Prosperity Board

All decisions
MeetingDecisionOutcome
14 Mar 2024 Appointment of chairmanThat Councillor Mark Smith be appointed Chairman for the meeting. Decided Open
14 Mar 2024 Exclusion of public and pressThat the public and press be excluded from the meeting whilst the agenda items 7 and 8 are considered, on the ground ... Decided Open
14 Mar 2024 Minutes of the last meeting held on 7 december 2023That the minutes of the meeting held on 7 December 2023 be approved and signed by the Chair as a correct record. Approved Open
14 Mar 2024 Fylde coast green growth updateThat the update be noted. Noted Open
7 Dec 2023 Appointment of chairThat Councillor Mark Smith be appointed Chair of the Blackpool Fylde and Wyre Economic Prosperity Board for the meeting Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies