12 items, 43 papersAbout 61 MB, led by CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT.
1 item with exempt partsEXCLUSION OF THE PRESS AND PUBLIC may be taken in private.
This meeting was held23 September 2026
12items
43papers
2decisions
1exempt
Running order, sized by papersItem 1 to 12
ReportsProcedureExempt parts

AI summaryWhat Shareholder Committee decided

Checked against 18 papers PDF briefing Pro

Blackpool Council's Shareholder Committee approved a suite of relocation support documents for the Central Housing Regeneration project area and noted delivery progress, and signed off the 2026/27 Wholly Owned Companies Strategic Risk Register covering 13 risk categories.

2decisions 1approved1noted Topicsgovernance, regeneration
Written by AI from the council's own reports and checked against them before publishing. Each decision page shows the sources, paragraph by paragraph.Report a problem

The agenda, item by item

What the committee will consider, in order, with every paper attached to its item. CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT is the main business; one item may be taken in private.

1
Procedure

DECLARATIONS OF INTEREST

Members are asked to declare any interests in the items under consideration and in doing so state: (1) the type of interest concerned either a (a) personal interest (b) prejudicial interest (c) disclosable pecuniary interest (DPI) and (2) the nature of the interest concerned If any member requires advice on declarations of interests, they are advised to contact the Monitoring Officer in advance of the meeting.

2
Report

WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27

To present the Council’s Wholly Owned Company Strategic Risk Register to the Shareholder Committee.

Decision: To approve the Wholly Owned Companies’ Strategic Risk Register for 2026/27. Reason for To ensure that strategic risks relating to the Council’s companies are effectively managed. The Wholly Owned Companies’ Strategic Risk Register is a key component of the Council’s Risk Management Framework. Alternative Options Considered: The Committee noted that the Risk Register was a key component of the Risk Management Framework which required approval by the Committee. Date of 23 September 2026. [name... Decision page

4 papers, 2.6 MBSearch inside with Pro
ReportDraft Wholly Owned Company Strategic Risk Register: 2026-2027810 KBDownload
ReportDraft Wholly Owned Company Strategic Risk Register: 2026-2027810 KBDownload
ReportWHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27489 KBDownload
ReportWHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27489 KBDownload
3
ReportMain business

CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT

To seek approval to the suite of documents that support owner and occupier relocation within the Central Housing Regeneration Project area. To support activity enabling resident and business relocation. To note the progress in respect of the workstream activity outlined in this report.

Decision: To note the updates outlined in respect of workstream delivery activity, including property acquisitions and forward delivery. To approve the suite of documents drafted in support of relocation activity for those owners and occupiers in the Central Housing Regeneration project area, including: Project Engagement Commitments; Fee Policy and Landowner Guides; Resident Relocation Statement Owner occupier additional support; Commercial Relocation Statement; and, Equality Impact Report. To delegate... Decision page

14 papers, 17 MBSearch inside with Pro
AppendixAppendix 1: CHRP Project Commitments279 KBDownload
AppendixAppendix 1: CHRP Project Commitments279 KBDownload
AppendixAppendix 2: CHRP Guides and Fee Policy5.3 MBDownload
AppendixAppendix 2: CHRP Guides and Fee Policy5.3 MBDownload
AppendixAppendix 3: CHRP Resident Relocation Statement v2558 KBDownload
AppendixAppendix 3: CHRP Resident Relocation Statement v2558 KBDownload
AppendixAppendix 4: CHRP Owner Occupier Additional Support301 KBDownload
AppendixAppendix 4: CHRP Owner Occupier Additional Support301 KBDownload
AppendixAppendix 5: CHRP Commercial Relocation Statement v1482 KBDownload
AppendixAppendix 5: CHRP Commercial Relocation Statement v1482 KBDownload
AppendixAppendix 6: Central Regen Project Equality Analysis Sept261 MBDownload
AppendixAppendix 6: Central Regen Project Equality Analysis Sept261 MBDownload
ReportCENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT598 KBDownload
ReportCENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT598 KBDownload
4
Exempt parts

EXCLUSION OF THE PRESS AND PUBLIC

The Monitoring Officer has marked with an asterisk (*) those items where the Committee is requested to consider whether the public should be excluded from the meeting as the items are likely to disclose exempt information in accordance with Section 100 (A) of the Local Government Act 1972. When considering whether to apply the exemption the Committee is asked to consider that the public interest in maintaining the...

5
Report

MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026

To agree the minutes of the last meeting held on 28 July 2026 as a true and correct record. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

3 papers, 1.4 MBSearch inside with Pro
ReportMINUTES OF THE LAST MEETING HELD ON 28 JULY 2026467 KBDownload
ReportMINUTES OF THE LAST MEETING HELD ON 28 JULY 2026467 KBDownload
ReportMINUTES OF THE LAST MEETING HELD ON 28 JULY 2026467 KBDownload
6
Procedure

SHAREHOLDER UPDATE

To receive a verbal update on the Wholly-Owned Companies from the Shareholder representatives. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

7
Report

WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27

To report detailed information on the financial performance of each of the Council wholly-owned companies to the Shareholder Committee in line with decision EX26/2021. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

4 papers, 1.8 MBSearch inside with Pro
AppendixAppendix 7a: Shareholder Committee report d1 FINAL442 KBDownload
AppendixAppendix 7a: Shareholder Committee report d1 FINAL442 KBDownload
ReportWHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27471 KBDownload
ReportWHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27471 KBDownload
8
Report

HOUNDSHILL SHOPPING CENTRE

To update the Shareholder Committee on the latest position with regard to the performance of the Houndshill Shopping Centre which is managed for the Council by New River. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

2 papers, 948 KBSearch inside with Pro
ReportHOUNDSHILL SHOPPING CENTRE474 KBDownload
ReportHOUNDSHILL SHOPPING CENTRE474 KBDownload
9
Report

BLACKPOOL HOUSING COMPANY - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)

To provide the Shareholder with a progress update in respect of Blackpool Housing Company Limited (BHC) and its subsidiary, Lumen Housing Limited (Lumen). (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

2 papers, 984 KBSearch inside with Pro
ReportBLACKPOOL HOUSING COMPANY: REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)492 KBDownload
ReportBLACKPOOL HOUSING COMPANY: REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)492 KBDownload
10
Report

BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26

To consider the 2025/26 annual report and annual audit report of Blackpool Housing Company Limited. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

2 papers, 942 KBSearch inside with Pro
ReportBLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26471 KBDownload
ReportBLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26471 KBDownload
11
Report

BLACKPOOL COASTAL HOUSING LIMITED UPDATE

To provide the Shareholder with an update on performance and key emerging issues. (This item contains commercially sensitive information which is exempt from publication by virtue of Paragraph 3 of Part 1 of Schedule 12A of the Local Government Act 1972).

6 papers, 4.1 MBSearch inside with Pro
AppendixAppendix 11a: TSM Analysis Report 2025_261.4 MBDownload
AppendixAppendix 11a: TSM Analysis Report 2025_261.4 MBDownload
AppendixAppendix 11b: BCH Board Scorecard Q1112 KBDownload
AppendixAppendix 11b: BCH Board Scorecard Q1112 KBDownload
ReportBLACKPOOL COASTAL HOUSING LIMITED UPDATE506 KBDownload
ReportBLACKPOOL COASTAL HOUSING LIMITED UPDATE506 KBDownload
12
Procedure

DATE OF NEXT MEETING

To note the date and time of the next meeting as Wednesday, 14 October commencing at 10.00am.

Read inside all 43 papersPro opens every page, searches every appendix, and keeps the papers if the council removes them.

The main business: CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT

Item 3 is where most of this meeting's papers sit: 14 papers, about 17 MB.

Item 3

CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT

To seek approval to the suite of documents that support owner and occupier relocation within the Central Housing Regeneration Project area. To support activity enabling resident and business relocation. To note the progress in respect of the workstream activity outlined in this report.

What is in the pack14 papers, about 17 MB
Appendix 1
CHRP Project CommitmentsSupporting paper
279 KB
Appendix 1
CHRP Project CommitmentsSupporting paper
279 KB
Appendix 2
CHRP Guides and Fee PolicySupporting paper
5.3 MB
Appendix 2
CHRP Guides and Fee PolicySupporting paper
5.3 MB
Appendix 3
CHRP Resident Relocation Statement v2Supporting paper
558 KB
Appendix 3
CHRP Resident Relocation Statement v2Supporting paper
558 KB
Appendix 4
CHRP Owner Occupier Additional SupportSupporting paper
301 KB
Appendix 4
CHRP Owner Occupier Additional SupportSupporting paper
301 KB
Appendix 5
CHRP Commercial Relocation Statement v1Supporting paper
482 KB
Appendix 5
CHRP Commercial Relocation Statement v1Supporting paper
482 KB
Appendix 6
Central Regen Project Equality Analysis Sept26Supporting paper
1 MB
Appendix 6
Central Regen Project Equality Analysis Sept26Supporting paper
1 MB
Report
CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTThe report to the committee
598 KB
Report
CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTThe report to the committee
598 KB
Read and search every page of this itemPro opens all 14 papers, and keeps them if the council removes them.

How this item got here

This committee has dealt with the subject before.

21 April 2026BLACKPOOL HOUSING COMPANY LIMITED - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 11 (2025/26)To provide the Shareholder with a progress update in respect of Blackpool Housing Company Limited (BHC) and its subsidiary, Lumen Housing Limited...
17 June 2026CENTRAL HOUSING REGENERATION AREA: PHASE 1 DELIVERY PROGRESS AND UPDATED FRAMEWORKTo seek approval of the updated Central Housing Regeneration Area Framework document, authorise the commencement of a competitive partner procurement...
23 September 2026CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTThis meeting.

Every paper for this meeting

All 43 papers in one list, with the item each belongs to, its size, and our copy of it. Download any paper from our archive once signed in; read and search it here with Pro.

PaperSizeOur copy
Agenda frontsheetItem
559 KB
Kept 5 Oct
Agenda frontsheetItem
559 KB
Kept 22 Oct
Agenda reports packItem
14 MB
Kept 5 Oct
Agenda reports packItem
14 MB
Kept 22 Oct
Printed draft minutesItem
495 KB
Kept 5 Oct
Printed minutesItem
495 KB
Kept 22 Oct
Draft Wholly Owned Company Strategic Risk Register: 2026-2027Item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
810 KB
Kept 5 Oct
Draft Wholly Owned Company Strategic Risk Register: 2026-2027Item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
810 KB
Kept 22 Oct
WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27Item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
489 KB
Kept 5 Oct
WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27Item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
489 KB
Kept 22 Oct
CHRP Project CommitmentsAppendix 1, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
279 KB
Kept 5 Oct
CHRP Project CommitmentsAppendix 1, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
279 KB
Kept 22 Oct
CHRP Guides and Fee PolicyAppendix 2, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
5.3 MB
Kept 5 Oct
CHRP Guides and Fee PolicyAppendix 2, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
5.3 MB
Kept 22 Oct
CHRP Resident Relocation Statement v2Appendix 3, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
558 KB
Kept 5 Oct
CHRP Resident Relocation Statement v2Appendix 3, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
558 KB
Kept 22 Oct
CHRP Owner Occupier Additional SupportAppendix 4, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
301 KB
Kept 5 Oct
CHRP Owner Occupier Additional SupportAppendix 4, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
301 KB
Kept 22 Oct
CHRP Commercial Relocation Statement v1Appendix 5, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
482 KB
Kept 5 Oct
CHRP Commercial Relocation Statement v1Appendix 5, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
482 KB
Kept 22 Oct
Central Regen Project Equality Analysis Sept26Appendix 6, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
1 MB
Kept 5 Oct
Central Regen Project Equality Analysis Sept26Appendix 6, item 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
1 MB
Kept 22 Oct
CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTItem 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
598 KB
Kept 5 Oct
CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTItem 3, CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT
598 KB
Kept 22 Oct
MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026Item 5, MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026
467 KB
Kept 4 Oct
MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026Item 5, MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026
467 KB
Kept 5 Oct
MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026Item 5, MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026
467 KB
Kept 22 Oct
Shareholder Committee report d1 FINALAppendix 7a, item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
442 KB
Kept 5 Oct
Shareholder Committee report d1 FINALAppendix 7a, item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
442 KB
Kept 22 Oct
WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27Item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
471 KB
Kept 5 Oct
WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27Item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
471 KB
Kept 22 Oct
HOUNDSHILL SHOPPING CENTREItem 8, HOUNDSHILL SHOPPING CENTRE
474 KB
Kept 5 Oct
HOUNDSHILL SHOPPING CENTREItem 8, HOUNDSHILL SHOPPING CENTRE
474 KB
Kept 22 Oct
BLACKPOOL HOUSING COMPANY: REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)Item 9, BLACKPOOL HOUSING COMPANY - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)
492 KB
Kept 5 Oct
BLACKPOOL HOUSING COMPANY: REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)Item 9, BLACKPOOL HOUSING COMPANY - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)
492 KB
Kept 22 Oct
BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26Item 10, BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26
471 KB
Kept 5 Oct
BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26Item 10, BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26
471 KB
Kept 22 Oct
TSM Analysis Report 2025_26Appendix 11a, item 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
1.4 MB
Kept 5 Oct
TSM Analysis Report 2025_26Appendix 11a, item 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
1.4 MB
Kept 22 Oct
BCH Board Scorecard Q1Appendix 11b, item 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
112 KB
Kept 5 Oct
BCH Board Scorecard Q1Appendix 11b, item 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
112 KB
Kept 22 Oct
BLACKPOOL COASTAL HOUSING LIMITED UPDATEItem 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
506 KB
Kept 5 Oct
BLACKPOOL COASTAL HOUSING LIMITED UPDATEItem 11, BLACKPOOL COASTAL HOUSING LIMITED UPDATE
506 KB
Kept 22 Oct

Last time, and what carried over

The committee last met on 28 July 2026. 5 of its items lead into this meeting; 4 items are new. Point at any item to follow a thread. Procedural items are left out.

Jul28
28 July 202610 items, 20 papers
Held
carried over
Sep23
23 September 202612 items, 43 papers
Held
3
POLICY FRAMEWORK - WHOLLY OWNED COMPANIESTo seek endorsement of the proposed Companies Group Policy Framework...
4
MUSEUM AND HERITAGE TRUST UPDATETo receive a presentation on the Museum and Heritage Trust.
5
EXCLUSION OF THE PRESS AND PUBLICThe Monitoring Officer has marked with an asterisk (*) those items...
6
MINUTES OF THE LAST MEETING HELD ON 17 JUNE 2026To agree the minutes of the last meeting held on 17 June 2026 correct...
8
WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 2 2026/27To report detailed financial information on the financial performance...
10
DATE OF NEXT MEETINGTo note the date and time of the next meeting as Wednesday, 23...
2
WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27To present the Council’s Wholly Owned Company Strategic Risk Register...
3
CENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORTNew this time
4
EXCLUSION OF THE PRESS AND PUBLICThe Monitoring Officer has marked with an asterisk (*) those items...
5
MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026To agree the minutes of the last meeting held on 28 July 2026 as a...
7
WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27To report detailed information on the financial performance of each...
8
HOUNDSHILL SHOPPING CENTRENew this time
9
BLACKPOOL HOUSING COMPANY - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)To provide the Shareholder with a progress update in respect of...
10
BLACKPOOL HOUSING COMPANY LIMITED ANNUAL REPORT AND ANNUAL AUDIT REPORT 2025/26New this time
11
BLACKPOOL COASTAL HOUSING LIMITED UPDATENew this time
12
DATE OF NEXT MEETINGTo note the date and time of the next meeting as Wednesday, 14...

The threads

  • POLICY FRAMEWORK - WHOLLY OWNED COMPANIES leads to item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
  • POLICY FRAMEWORK - WHOLLY OWNED COMPANIES leads to item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
  • EXCLUSION OF THE PRESS AND PUBLIC leads to item 4, EXCLUSION OF THE PRESS AND PUBLIC
  • MINUTES OF THE LAST MEETING HELD ON 17 JUNE 2026 leads to item 5, MINUTES OF THE LAST MEETING HELD ON 28 JULY 2026
  • WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 2 2026/27 leads to item 2, WHOLLY OWNED COMPANY STRATEGIC RISK REGISTER 2026/27
  • WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 2 2026/27 leads to item 7, WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 4 2026/27
  • WHOLLY-OWNED COMPANY FINANCIAL PERFORMANCE UPDATE AS AT MONTH 2 2026/27 leads to item 9, BLACKPOOL HOUSING COMPANY - REPORT ON OVERALL PERFORMANCE AND FINANCIAL POSITION AT MONTH 5 (2026/27)
  • DATE OF NEXT MEETING leads to item 12, DATE OF NEXT MEETING

Not carried over

MUSEUM AND HERITAGE TRUST UPDATE do not return this time.

See the 28 July meeting

This committee over time

Every Shareholder Committee meeting we have read, the dates it has set for the future, and each time those dates have changed.

51 meetings, 2021 to 2026Dot size shows the number of papers
202120222023202420252026
HeldThis meeting
MeetingItemsPapers
1 Dec 2026Tuesday
0items
0papers
UpcomingOpen
18 Nov 2026Wednesday
0items
0papers
HeldOpen
14 Oct 2026Wednesday
8items
8papers
HeldOpen
23 Sep 2026Wednesday, this meeting
12items
21papers
28 Jul 2026Tuesday
10items
10papers
HeldOpen
17 Jun 2026Wednesday
10items
14papers
HeldOpen
21 Apr 2026Tuesday
8items
4papers
HeldOpen
25 Feb 2026Wednesday
13items
7papers
HeldOpen
21 Jan 2026Wednesday
9items
5papers
HeldOpen
3 Dec 2025Wednesday
8items
6papers
HeldOpen
19 Nov 2025Wednesday
12items
10papers
HeldOpen
16 Oct 2025Thursday
11items
10papers
HeldOpen
18 Jun 2025Wednesday
10items
6papers
HeldOpen
1 May 2025Thursday
8items
5papers
HeldOpen
19 Mar 2025Wednesday
5items
4papers
HeldOpen
4 Mar 2025Tuesday
12items
9papers
HeldOpen
4 Feb 2025Tuesday
12items
6papers
HeldOpen
4 Dec 2024Wednesday
9items
6papers
HeldOpen
21 Nov 2024Thursday
8items
5papers
HeldOpen
12 Nov 2024Tuesday
11items
9papers
HeldOpen
1 Oct 2024Tuesday
9items
8papers
HeldOpen
16 Jul 2024Tuesday
10items
7papers
HeldOpen
18 Jun 2024Tuesday
0items
0papers
HeldOpen
26 Mar 2024Tuesday
10items
5papers
HeldOpen
22 Feb 2024Thursday
14items
5papers
HeldOpen
18 Jan 2024Thursday
13items
9papers
HeldOpen
14 Dec 2023Thursday
0items
0papers
HeldOpen
9 Nov 2023Thursday
10items
7papers
HeldOpen
12 Oct 2023Thursday
11items
8papers
HeldOpen
21 Sep 2023Thursday
11items
8papers
HeldOpen
5 Sep 2023Tuesday
5items
5papers
HeldOpen
13 Jul 2023Thursday
13items
8papers
HeldOpen
10 Mar 2023Friday
11items
6papers
HeldOpen
20 Feb 2023Monday
5items
5papers
HeldOpen
3 Feb 2023Friday
10items
5papers
HeldOpen
20 Jan 2023Friday
11items
12papers
HeldOpen
19 Dec 2022Monday
13items
6papers
HeldOpen
25 Nov 2022Friday
10items
5papers
HeldOpen
14 Oct 2022Friday
13items
5papers
HeldOpen
23 Sep 2022Friday
14items
8papers
HeldOpen
5 Sep 2022Monday
5items
5papers
HeldOpen
15 Jul 2022Friday
9items
11papers
HeldOpen
17 Jun 2022Friday
0items
3papers
HeldOpen
27 May 2022Friday
12items
6papers
HeldOpen
18 Mar 2022Friday
11items
10papers
HeldOpen
25 Feb 2022Friday
10items
5papers
HeldOpen
11 Feb 2022Friday
15items
11papers
HeldOpen
21 Jan 2022Friday
10items
10papers
HeldOpen
26 Nov 2021Friday
8items
6papers
HeldOpen
19 Nov 2021Friday
14items
5papers
HeldOpen
8 Oct 2021Friday
11items
5papers
HeldOpen

Follow the Shareholder Committee

Choose what you want to hear about. The preview is built from this committee's real papers and changes, so you can see what would have reached you.

What should we tell you?

Blackpool, Shareholder Committee

Shareholder Committee: 3 kinds of updateBlackpool, sent the same day
PDF
43 papers published for 23 SeptemberCENTRAL HOUSING REGENERATION PROJECT AREA: DELIVERY PROGRESS AND RELOCATION SUPPORT and 42 more papers
DAT
Meeting dates updatedAny date added, moved or dropped
DEC
Decisions from 23 SeptemberThe committee's resolutions, the day they are recorded
ABC
"central" found in 4 papersCentral Regen Project Equality Analysis Sept26 and Central Regen Project Equality Analysis Sept26
Each update links to the paper and the council's own copy
Free: one weekly alert. Pro: every option, the same day. Pro Plus: straight into your own systems.

Free

One alert, sent weekly, on titles and decisions.

£0for good
  • 1 alert, weekly summary
  • Titles and decisions
  • Link to every official paper
Save this alert free
Most chosen

Pro

Unlimited alerts the same day, searching every page.

£99per user a month
  • Unlimited alerts, same day
  • Matches inside every page and appendix
  • Every council, not just this one

Pro Plus

Your team, with every match pushed into your own tools.

£449a month, 3 users included
  • Everything in Pro, for 3 users
  • Alerts as webhooks into Slack or a CRM
  • API key and bulk export of this council

Data licence

Every council's records in your own products and research.

£12,000a year, from
  • Unlimited API and full archive delivery
  • Rights to use the data in your products
  • Back to 2000, every council
Talk to us

Never miss what this committee decides

Papers, decisions and date changes for the Shareholder Committee, and every other committee you follow, the day they appear.

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies