That the Committee fully supports the Boston Barrier Project as proposed in the Transport and Works Act Order (TWAO) submitted to the Secretary of State and raises no objections, and that authority be delegated to the Development Control Manager to amend and finalise the suggested list of conditions (set out at the end of the Planning Officers’ report) in order to ensure that they meet the tests of being necessary, relevant to planning and the development proposed, enforceable, precise and reasonable in all other respects.
Word for word from the decision Boston published for this meeting.Source: democracy.boston.gov.uk
The purpose of this report is to advise members of the Transport and Works Act Order (TWAO) that has now been submitted to the Secretary of State for the Boston Barrier project.
The report summarises the overall process of the TWAO, the role that Boston Borough Council, who are a statutory consultee only, have in this process and the officers recommendation and consideration of the scheme from a planning perspective which, if endorsed by the committee, will be conveyed to the Secretary of State.
Recommendation
The Committee is asked to lend its full support to the scheme as proposed and to make clear that it raises NO OBJECTIONS and seeks delegated authority to the Development Control Manager to amend and finalise the suggested list of conditions contained at the rear of this report in order to ensure that they meet the tests of being necessary, relevant to planning and the development proposed, enforceable, precise and reasonable in all other respects.
1.0INTRODUCTION
1.1The Environment Agency (the applicants for the project) have submitted a Transport and Works Act Order (TWAO) to the Secretary of State to construct and operate a new tidal barrier with a moveable gate across the Haven, together with a new building to enable operation of the barrier, new flood defence walls on both banks of the Haven, a replacement gate across the entrance to the existing wet dock and to execute ancillary works, including dredging of the river to facilitate the construction of the barrier. 1.2 This report provides a brief overview of the proposal, the process and Boston Borough Council’s role in this process with a final recommendation made on behalf of the Planning Department. The full schedule of works is as follows;
(a) A barrier structure to be constructed within the Haven, approximately 100m downstream of Black Sluice. This would comprise a 25m wide u-shaped structure, 35m in length, to house a rising sector gate approximately 10m high, spanning the channel;
(b) A control building, for the tidal barrier, to be constructed on the left bank of The Haven directly adjacent to the proposed barrier. To be located on the current site of the Port of Boston’s buoy shed;
(c) The widening of the wet dock entrance from 15m to 18m. A replacement gate to be installed within the location of the entrance, comprising of vertically moving or rotating gate(s) approximately 10m high and 12m in radius;
(d) A control building for the replacement gate to be constructed within the entrance to the wet dock, directly adjacent to the structure;
(e) Sheet piling construction to take place on the right bank of The Haven to provide a flood protection level of 7.55mAOD. Sheet piling would tie-in to the barrier and continue along the right embankment to connect with the flood protection provided by the WPD substation. This distance is approximately 540m;
(f) Construction will take place on the left bank of The Haven to create two distinct elements. The first is to construct a new sheet piled quay wall (approximately 315m), which will stabilise the existing PoB quayside and provide anchorage for element two. Element two is a concrete flood wall (approximately 515m), 1.5 to 2.4m above ground level commencing at the barrier and terminating at Maud Foster Sluice (totalling approximately 830m). This flood wall would incorporate flood gates which would be double leafed, each 3m to 5m wide (giving a 6-10m total gate width) within the Port of Boston estate;
(g) On the right bank the demolition of the disused wooden quay to facilitate the right bank sheet piling (element (e));
(h) Demolition of grain conveyors on left bank of The Haven to facilitate construction (element (f)). A new grain conveyor to be constructed once the left bank works in the vicinity have been completed;
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies