That the Committee supports the application for listed building consent in preparation for the proposal to be referred to the Secretary of State for a final decision with the following recommended conditions: 1. The works must be begun not later than the expiration of five years beginning with the date of this consent. Reason: To ensure that the development is commenced within a reasonable time period and to be imposed pursuant to Section 18 of the Town and Country Planning (Listed Buildings and Conservation Areas) Act 1990. 2. The development hereby permitted shall be carried out in accordance with the submitted application forms, the Design Heritage and Access Statement and the following plans; § Ref: IMAN001472-EVT-LBC-001 Rev P1 – ‘Site Boundary and Barrier Project Plan’ (1/4) § Ref: IMAN001472-EVT-LBC-002 Rev P1 – ‘Maud Foster Sluice Location Plan’ (2/4) § Ref: IMAN001472-EVT-LBC-004 Rev P1 – ‘Maud Foster Sluice Proposed Works’ (4/4) Reason: For the avoidance of doubt, in order to retain the historic integrity of this listed structure and to accord with the National Planning Policy Framework (2012). 3. The works to the Maud Foster Grade II listed structure hereby approved shall not begin until a written scheme of site management for that structure to minimise any damage and the risk of damage to the fabric of the structure, has been submitted to and approved in writing by the Local Planning Authority. The written scheme shall include: (a) Survey drawings and photographs of all external parts of the listed structure to be affected by the works; and (b) a method statement for the works including any protective works that need to be put in place. Reason: To enable reasonable and proper control to be exercised over the detail of the works and to accord with the intentions of the National Planning Policy Framework (2012).
Word for word from the decision Boston published for this meeting.Source: democracy.boston.gov.uk
Application Type: Listed Building Consent Proposal: Application for listed building consent for the construction of a concrete flood defence wall which would physically abut the parapet of the Grade II listed Maud Foster Sluice, with the creation of a water tight joint in association with The Boston Barrier Site: Maud Foster Sluice, Port of Boston, Boston, PE21 0AF
Applicant: Alison Hukin, Environment Agency
Ward: Skirbeck Parish: Boston Town Area Committee
Case Officer: John Taylor
Third Party Reps: Update members at Committee
Recommendation: Minded to Support
1.0Reason for Report
1.1The application for Listed Building Consent (LBC) forms part of the overall project for the ‘Boston Barrier’. This large project includes an application for a Transport and Works Act Order (TWAO) and planning permission that have been submitted to the Secretary of State (S of S) for approval. Any decision by members on this application for Listed Building Consent will also need to be referred to the Minister for a final decision.
1.2In terms of timing and when the Council’s response will be referred to the S of S for them to make a decision, there is a set timetable which the Council must adhere to. Where a ‘standard’ application is made to the Council for LBC there is an obligation to publicise the application and this is set out in Regulation 5 of the Regulations. The Act modifies the Regulations to substitute a different Regulation (5(1), meaning that the obligations on the applicant (EA) and the local planning authority to advertise an LBC application are different in cases where an LBC application is made in connection with a TWAO application. (For the lpa this means a 42 day consultation period). This means that an application for LBC which relates to proposals included in a TWAO application should still be made to the Council but thereafter it must be automatically referred by the Council to the S of S. Thus, it will be the Minister rather than the Council that makes the final decision on the LBC application. B/16/0305
1.3As this application for LBC has been made in connection with the TWAO it will be necessary to follow the same timetable as the TWAO that has been submitted to the S of S in line with the amended Regulations. For clarity this is provided below;
17 August – Notices in Boston Target and Boston Standard 23 August – TWAO application made available for public inspection 24 August – Notices in London Gazette and Lloyds List 24 August – Notices in Boston Target and Boston Standard 5 October – Last day of TWAO public inspection 5 October – Deadline for public representations or objections to the Secretary of State 10 October – Receipt of and analysis of objections received to identify prospects of (a) resolving any objections and (b) a public inquiry being fixed to consider the application 2 November – Likely ‘relevant date’ for Secretary of State to announce whether a public inquiry should be fixed. This date falls 4 weeks after the date on which the deadline for objections occurs. 14 December – Likely deadline for production of statement of case and supporting documents 8 March – Likely deadline for proof of evidence 4 April – Last possible public inquiry start date
1.4Any resolution made by members on this application for LBC will be sent to the S of S before 5th October 2016.
2.0Application Site and Proposal
2.1The application site (the Maud Foster Sluice) is located at the junction of the Maud Foster Drain and The Haven and within the settlement limits of the town of Boston. Immediately to the west of the Sluice lies Boston Port with residential developments to the north and northeast.
2.2The application site contains the Grade II listed Sluice and also the site lies within the Boston (Skirbeck) Conservation Area. The list entry for the structure states:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.