RESOLVED that the application be granted planning permission, in line with the recommendation set out in the report, with the additional requirement to secure protective measures between cycle parking spaces and car parking spaces 5-7 (supplement condition 14) and vehicle charging points (new condition). Voting: For – 6 Against – 6 Abstentions – 0 NOTE: · Due to there being a parity of votes, the Chair used his casting vote which saw the application granted as per the above. · A previous vote to refuse was defeated. · Cllr G Farquhar requested that his votes be recorded. Cllr G Farquhar voted to refuse the application in the first vote and subsequently voted against the application being granted in the second vote.
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting.Source: democracy.bcpcouncil.gov.uk
Follow this further
Built from Bournemouth, Christchurch and Poole's papers
NOTES-PLANNING 1. The contents of this drawing are copyright. 2. Do not scale. Figured dimensions only to be used. 3. Contractors must verify all dimensions and report any discrepancies before putting work in hand or making any shop drawings. 4. All flat roofs to be fitted with a man safe system to satisfy CDM 2015 regulations unless written confirmation from Principle Designer/ Principle Contractor is provided to show alternative compliance has been sought and approved. 5. Please note a sprinkler system and mechanical smoke extraction may be required in all or some areas of the building inc. basement car parks - Qualified fire consultant to confirm as part of fire safety report - to be instructed by client or contractor to cover all aspects of Fire Safety / Part B 6. Fixed shut fire safety glass windows may be required where windows are in close proximity to
PROPOSED SUDS SYSTEM boundaries (subject to building regulations). 7. Stair design to be independently checked by stair fabricator for regs. compliance and sizing, prior to construction/ ordering. Dimensions to be checked before fabrication. 8. Maclennan waterproofing specialists (or similar company with relevant PI insurance) to be instructed and detail all basement waterproofing designs. - ARC carry no responsibility for basement designs in terms of waterproofing or structure in any way. 37.61 9. “AS BUILT” drawings will only be issued upon request from the client/ contractor. All information within as built drawings is to be confirmed and provided by the client/ contractor. ARC Architecture do not perform regular site inspections to guarantee as built information so contractor or client must sign a letter from ARC to confirm compliance with our plans on site. 37.60 37.47 10. Any discrepancies between specification notes and details must be clarified for design intention with ARC before continuing with construction. T2 11. At Building Regulation stage our instruction is to gain a certificate of building regulations compliance 37.52 from the clients chosen inspector (LA or Private alternative) 37.38 12. To ensure compliance with EWS1 fire safety forms, an independent and an appropriately qualified and insured fire consultant / engineer should be appointed by the client to ensure the finished project 37.48 can be mortgaged.
Ea
Rid GREENHOUSE
ve
ge s:4
:4 13. A design and risk assessment should form part of our drawing package, if you have not received this
2.
6. 7
98 ToH:40.94
9 G from us by post, email or collection please contact us for a copy before moving forward with the project.
Rid OVERHANGING VIN PA 14. At planning stage planning drawings are to only to used for planning purposes.
ge C UNDERGROWTH CN
:4 6. 15. All Cladding & building attachments to be all A1 fire rated.
95 37.37 To F:3 9.4 8 16. We take no responsibility for the depicted site ownership boundary. Clients must notify us if they feel the our plans do not accurately depict their ownership or area of control or ownership. 37.37 17. We do not take responsibility for meeting minimum space as setout in Government Technical housing CN 37.49 37.43 C PA standards - nationally described space standards document. 37.59 VI 37.38 37.45 N G
Note: Any design or details relating to Fire Safety, including under Part B of the
NT 37.57
Rid VE
ge 37.36 Building Regulations is shown for indicative/information purposes only and is
:4 4. 74 37.25 1. 66 39. 88 subject to appropriate external professional input. No assumption of any
Ea s: T3g :4 ve responsibility is accepted.
ve 37.48 ge Ea
s: Rid
42 .7 ToH:40.01
M
7 37.37 37.39
OO Water
DR Level:
BE
AD 37.26
16 37.41 POND (approx) LEGEND
ITE To
-SU
RO W:3 37.34
EN 7.6 6 ToH:39.37 37.36 1.1 36.89 ToH:40.19
TR 2 IN UNDVEERHA
Rid O To W
ge 37.36 :38
M :4 37.34 .51 FO AN CL RGR NGIN
1. UN
16 To D S IN OW G W:3 SITE BOUNDARY
R ER R FIN ITIO E TH 9.3 GR G IN 4
FA M 37.34 DIN OW
O 37.35 AL N TH
RO START OF
D 37.36 36.89 36.85 T
BE ToH:40.09 oW 3M :38 BASEMENT
N 37.43 .53 To 37.39 36.92 ToW:37.73 W :37 NOTE:
ITE 37.57 RAMP
G .68
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning Committee at Bournemouth, Christchurch and Poole and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.