Bournemouth, Christchurch and Poole Council
Eastern BCP Planning Committee, Thursday 20 August 2026 at 10.00am

Two Riversmeet Leisure Centre, Christchurch, BH23 1HW

Noted Planning 7 papers

AI summaryBCP Council's Eastern Planning Committee granted permission for a two-storey extension at Two Riversmeet Leisure Centre, Christchurch, to provide two new fitness studios, with ecology mitigation including bat and bird boxes.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeNotedVoting 7 For, 0 Against, 0 Abstentions
MoneyNot stated
What happens nextBuild to approved drawingsImplement ecology measures set out on plan
Who it affectsTwo Riversmeet Leisure CentreErection of two-storey extension for two fitness studios

What was decided

The Committee granted planning permission in accordance with the officer's report, as updated by the Committee Addendum published on 19 August 2026.

Members noted officers' confirmation that building controls would ensure people of all abilities, including wheelchair users using ramp access, could safely exit the building in the event of a fire.

Why

The application is by BCP Council itself (a Regulation 3 application) for a new two-storey extension to house two fitness studios at the council-owned leisure centre.

The proposed elevations include ecology mitigation: relocation of an existing house sparrow terrace, two additional sparrow terraces on the west-facing wall, new bat boxes, and four bird boxes in the on-site English oak and Scots Pine, in line with the Ecology PRA. Report P1, P2, P7

What happens next

Existing solar PV panels on the south-facing elevation are to be temporarily adjusted or removed in September by a suitably qualified ecologist and reinstated on completion, after confirming no birds are still nesting. Report P1

Bat boxes and bird boxes are to be installed in locations agreed with the Principal Designer and Ecologist on site. Report P1, P7

Options considered

  • Chosen: Grant permission in accordance with the officer's report, as updated by the Committee Addendum

Implications

  • Other: Loss of bird nesting habitat within the development boundary is mitigated by four bird boxes placed in trees outside the boundary. Report P7
  • Legal: Fire escape is via anthracite grey steel personnel fire escape doors with timber surrounds to reveals; ramp access for wheelchair users is subject to building controls approval. Report P16
  • Risk: Works to the roof must be carried out in September, after an ecologist confirms no birds are still using the sparrow terrace to nest. Report P1

Who and where

  • Users of Two Riversmeet Leisure Centre, Christchurch Report P17
  • Christchurch Town Ward residents

Timeline

  • 28.10.2025: Proposed Elevations drawing produced by Morgan Design Studio Report P18, P20
  • 5th November 2025: Ecology Preliminary Roost Assessment prepared by KP Ecology Report P1, P2, P7, P8
  • 3rd March 2026: Ecology PRA updated to version 3 Report P1, P2, P7, P8
  • 10.07.2026: Proposed Elevations drawing revised for ecology Report P12
  • 19 August 2026: Committee Addendum published
  • 20 August 2026: Eastern BCP Planning Committee meeting; permission granted
  • September: Existing solar PV panels to be adjusted or removed by a qualified ecologist before roof works Report P1

Plain English for the jargon

  • Regulation 3 application: A planning application made by a local authority for its own development, decided by its own planning committee.
  • Ecology PRA: Preliminary Roost Assessment, a survey for bats and other protected species.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item38b

Resolved

to GRANT permission in accordance with the recommendation set out in the officer’s report, as updated by the Committee Addendum published on 19 August 2026. Voting: For:7, Against:0, Abstentions:0 Notes: In granting the application, Committee Members noted the officers’ confirmation that, in respect of ramp access for wheelchair users, building controls would ensure that people of all abilities would be able to safely exit the building in the event of a fire.
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting. Source: democracy.bcpcouncil.gov.uk

Follow this further

Built from Bournemouth, Christchurch and Poole's papers

What the report saysPro

Report to Eastern BCP Planning Committee

© Bats — Three woodstone or UV-stabilised recycled plastic Maintain flush & continuous Existing solar PV panels. Allow The house sparrow terrace on the bat boxes will be installed on the south elevation of the Existing (weather tight) roof finish. for temporarily adjusting or south-facing elevation of the building will be building (Figs. 7 - 10) to provide suitable features for removed in September by a suitably qualified glazed Level and true with existing. removing locally around new bats. Woodstone/UV-stabilised recycled plastic boxes are ecologist, after confirming that no birds are available from various suppliers, including: rooflights roof works and reinstating upon still using the box to nest. This will be https://www.wildcare.co.uk/bat boxes, completion. relocated onto the W-facing wall of the https://www.nhbs.com existing leisure centre, high up under the eaves, so the box is in the shade (Fig. 11). Read in conjunction with Ecology PRA Prepared on: 5th November 2025, updated 3rd March 2026 Version no: 3 (or most current update) by Katie Pollard at KP Ecology. RIDGE LEVEL 12.34m This will not be put over any existing gaps currently used by nesting birds. Two additional house sparrow terraces will be erected on the W-facing wall of the existing leisure centre, high up under the eaves, so that the boxes are in the shade, in addition to the relocated terrace (see above). These will not be put over any existing gaps currently used by nesting birds.

1 2 RIDGE LEVEL 10.06m 3 4 Read in conjunction with Ecology PRA Prepared on: 5th November 2025, updated 3rd March 2026 Version no: 3 (or most current update) by Katie Pollard at KP Ecology. 3no: House Sparrow boxes

W08 W09 W10 W11 W12

FOOTPATH 4.60

W01 W02 W03 W04

PROPOSED WEST ELEVATION Scale 1:50 FGL 2.510

Four bird boxes will be put up in the English oak and the Scots Pine on site (Figs. 12- 14). The boxes will be DATUM 1.0m Stairs - handrails typically galvanized 48.3x5.0 Proposed new extension roof New bat box - agree exact chs rails and posts. 16mm dia solid pin. 40x10mm Kingspan (or similar & approved) insulated profiled location with Principal woodstone/woodcrete, and are available from various top bottom rail with 12mm dia solid bar infills @ roofing panels. Colour/Style to match existing Designer & Ecologist on site suppliers, including: www.birdfood.co.uk/, New bat boxes - agree exact www.wildcare.co.uk/wildlife-nest-boxes/bird-boxes. This max 100mm c/c. 6mm folded durbar treads to stairs is outside the development boundary and will mitigate typically. 220x10mm m/s stringers location with Principal for loss of bird nesting habitat within the boundary. Designer & Ecologist on site

Read in conjunction with Ecology PRA Prepared on: 5th A B C D E F G November 2025, updated 3rd March 2026 Version no: 3 (or most current update) by Katie Pollard at KP Ecology.

W13 W14 W15 W16 W17

0m 0.5 1 1.5 2 2.5

1:50 scale

D UPDATED ECOLOGY SM 10.07.2026 REV: DESCRIPTION: BY: DATE:

Morgan Design Studio 2 River Mews, Blandford Forum, Dorset, DT11 7AX

W05 W06 W07 T: 0755 796 2724 E: [email removed] W:morgandesignstudio.co.uk

CLIENT:

Anthracite Grey double glazed Anthracite Grey steel personnel fire BCP Council PROPOSED SOUTH ELEVATION aluminium windows, with timber surround to reveals. escape doors, with timber surround to reveals. Facilities Management Customer & Property Unit 4 Dalling Road, Branksome, Poole, BH12 1DJ Scale 1:50 PROJECT:

PROPOSED NEW STUDIOS Two Riversmeet Leisure Centre, Christchurch, BH23 1HW

DRAWN: CHECKED: DATE: REVISION: SJM 28.10.2025

DRAWING TITLE:

PROPOSED ELEVATIONS

SCALE: SHEET SIZE: SHEET NO: As Shown (@A1) A1

PROJECT NO: STATUS: MDS1365 PLANNING

DRAWING NO: REVISION:

MDS1715/210 D

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
1: Location Plan 200EPlan 580 KB Download
PDF
2: Proposed ElevationsReport 580 KB DownloadRead as text
PDF
3: Proposed Ground Floor PlanReport 305 KB Download
PDF
4: Proposed First Floor PlanReport 313 KB Download
PDF
5: Landscape PlanReport 1.3 MB Download
PDF
6: Proposed Site Plan 207CPlan 1.9 MB Download
PDF
Two Riversmeet Leisure Centre, Christchurch, BH23 1HWReport 365 KB Download

At this meeting

Whole meeting

Who was there

12 of 16 attended
P
Presentthe member of the committee was present as expected at the meeting
A
Apologiesthe member of the committee was unable to attend and reported their apologies in advance (substitute
A
Absentthe member of the committee was not present and did not apologise for their absence
IA
In attendancea councillor, who was not a member of the committee, was also in attendance
PH
Councillor Paul HilliardChair, present
ML
Councillor Marion Le PoidevinVice-Chair, present
PC
Councillor Patrick CanavanCommittee Member, present
JC
Councillor Jo ClementsCommittee Member, apologies
DF
Councillor David FlaggCommittee Member, present
MG
Councillor Matthew GillettCommittee Member, present
GM
Councillor Gillian MartinCommittee Member, present
DF
Councillor Dr Felicity RiceCommittee Member, apologies, sent representative

All 16 on the meeting page

On this subject at Bournemouth, Christchurch and Poole

Search all
  1. Two Riversmeet Leisure Centre, Christchurch, BH23 1HWThis decision
  2. Audit and Governance Committee 19 March 2026 - Minute No. 119 - Two Riversmeet StudiosApproved
  3. Two Riversmeet StudiosAgreed
  4. Update on Two Riversmeet Leisure CentreNoted
  5. Two Riversmeet Leisure Complex Pool ClosuresNoted

More from Bournemouth, Christchurch and Poole Eastern BCP Planning Committee

All decisions
MeetingDecisionOutcome
20 Aug 2026 Confirmation of MinutesThat the minutes of the meetings held on 25 June and 6 July 2026 be approved as a correct record. Voting: Nem. Con. Approved Open
20 Aug 2026 Broadwaters, Wick Lane, Bournemouth, BH6 4LAto GRANT permission in accordance with the recommendation set out in the officer’s report and the addendum published ... Decided Open
20 Aug 2026 Appeals Reportthat the Planning Committee note the contents of the report. Voting: Nem. Con. Noted Open
6 Jul 2026 JP Morgan, Chase Bank, 1 Chaseside, Bournemouth BH7 7DAResolved to GRANT permission in accordance with the recommendation set out in the officer’s report, as updated by the... Decided Open
25 Jun 2026 5 Seafield Road, Bournemouth, BH6 3JEResolved to GRANT permission in accordance with the recommendation set out in the officer’s report, as updated by the... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies