Two Riversmeet Leisure Centre, Christchurch, BH23 1HW
NotedPlanning7 papers
AI summaryBCP Council's Eastern Planning Committee granted permission for a two-storey extension at Two Riversmeet Leisure Centre, Christchurch, to provide two new fitness studios, with ecology mitigation including bat and bird boxes.
Written from the decision and the officer reportPDF Pro
OutcomeNotedVoting 7 For, 0 Against, 0 Abstentions
MoneyNot stated
What happens nextBuild to approved drawingsImplement ecology measures set out on plan
Who it affectsTwo Riversmeet Leisure CentreErection of two-storey extension for two fitness studios
What was decided
The Committee granted planning permission in accordance with the officer's report, as updated by the Committee Addendum published on 19 August 2026.
Members noted officers' confirmation that building controls would ensure people of all abilities, including wheelchair users using ramp access, could safely exit the building in the event of a fire.
Why
The application is by BCP Council itself (a Regulation 3 application) for a new two-storey extension to house two fitness studios at the council-owned leisure centre.
The proposed elevations include ecology mitigation: relocation of an existing house sparrow terrace, two additional sparrow terraces on the west-facing wall, new bat boxes, and four bird boxes in the on-site English oak and Scots Pine, in line with the Ecology PRA. Report P1, P2, P7
What happens next
Existing solar PV panels on the south-facing elevation are to be temporarily adjusted or removed in September by a suitably qualified ecologist and reinstated on completion, after confirming no birds are still nesting. Report P1
Bat boxes and bird boxes are to be installed in locations agreed with the Principal Designer and Ecologist on site. Report P1, P7
Options considered
Chosen: Grant permission in accordance with the officer's report, as updated by the Committee Addendum
Implications
Other: Loss of bird nesting habitat within the development boundary is mitigated by four bird boxes placed in trees outside the boundary. Report P7
Legal: Fire escape is via anthracite grey steel personnel fire escape doors with timber surrounds to reveals; ramp access for wheelchair users is subject to building controls approval. Report P16
Risk: Works to the roof must be carried out in September, after an ecologist confirms no birds are still using the sparrow terrace to nest. Report P1
Who and where
Users of Two Riversmeet Leisure Centre, Christchurch Report P17
Christchurch Town Ward residents
Timeline
28.10.2025: Proposed Elevations drawing produced by Morgan Design Studio Report P18, P20
5th November 2025: Ecology Preliminary Roost Assessment prepared by KP Ecology Report P1, P2, P7, P8
3rd March 2026: Ecology PRA updated to version 3 Report P1, P2, P7, P8
10.07.2026: Proposed Elevations drawing revised for ecology Report P12
19 August 2026: Committee Addendum published
20 August 2026: Eastern BCP Planning Committee meeting; permission granted
September: Existing solar PV panels to be adjusted or removed by a qualified ecologist before roof works Report P1
Plain English for the jargon
Regulation 3 application: A planning application made by a local authority for its own development, decided by its own planning committee.
Ecology PRA: Preliminary Roost Assessment, a survey for bats and other protected species.
What was decided, why, and what happens next
Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.
Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item38b
Resolved
to GRANT permission in accordance with the recommendation set out in the officer’s report, as updated by the Committee Addendum published on 19 August 2026. Voting: For:7, Against:0, Abstentions:0 Notes: In granting the application, Committee Members noted the officers’ confirmation that, in respect of ramp access for wheelchair users, building controls would ensure that people of all abilities would be able to safely exit the building in the event of a fire.
Word for word from the decision Bournemouth, Christchurch and Poole published for this meeting.Source: democracy.bcpcouncil.gov.uk
Follow this further
Built from Bournemouth, Christchurch and Poole's papers
1 2 RIDGE LEVEL 10.06m 3 4 Read in conjunction with Ecology PRA Prepared on: 5th November 2025, updated 3rd March 2026 Version no: 3 (or most current update) by Katie Pollard at KP Ecology. 3no: House Sparrow boxes
W08 W09 W10 W11 W12
FOOTPATH 4.60
W01 W02 W03 W04
PROPOSED WEST ELEVATION Scale 1:50 FGL 2.510
Four bird boxes will be put up in the English oak and the Scots Pine on site (Figs. 12- 14). The boxes will be DATUM 1.0m Stairs - handrails typically galvanized 48.3x5.0 Proposed new extension roof New bat box - agree exact chs rails and posts. 16mm dia solid pin. 40x10mm Kingspan (or similar & approved) insulated profiled location with Principal woodstone/woodcrete, and are available from various top bottom rail with 12mm dia solid bar infills @ roofing panels. Colour/Style to match existing Designer & Ecologist on site suppliers, including: www.birdfood.co.uk/, New bat boxes - agree exact www.wildcare.co.uk/wildlife-nest-boxes/bird-boxes. This max 100mm c/c. 6mm folded durbar treads to stairs is outside the development boundary and will mitigate typically. 220x10mm m/s stringers location with Principal for loss of bird nesting habitat within the boundary. Designer & Ecologist on site
Read in conjunction with Ecology PRA Prepared on: 5th A B C D E F G November 2025, updated 3rd March 2026 Version no: 3 (or most current update) by Katie Pollard at KP Ecology.
W13 W14 W15 W16 W17
0m 0.5 1 1.5 2 2.5
1:50 scale
D UPDATED ECOLOGY SM 10.07.2026 REV: DESCRIPTION: BY: DATE:
Morgan Design Studio 2 River Mews, Blandford Forum, Dorset, DT11 7AX
Anthracite Grey double glazed Anthracite Grey steel personnel fire BCP Council PROPOSED SOUTH ELEVATION aluminium windows, with timber surround to reveals. escape doors, with timber surround to reveals. Facilities Management Customer & Property Unit 4 Dalling Road, Branksome, Poole, BH12 1DJ Scale 1:50 PROJECT:
PROPOSED NEW STUDIOS Two Riversmeet Leisure Centre, Christchurch, BH23 1HW
DRAWN: CHECKED: DATE: REVISION: SJM 28.10.2025
DRAWING TITLE:
PROPOSED ELEVATIONS
SCALE: SHEET SIZE: SHEET NO: As Shown (@A1) A1
PROJECT NO: STATUS: MDS1365 PLANNING
DRAWING NO: REVISION:
MDS1715/210 D
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Eastern BCP Planning Committee at Bournemouth, Christchurch and Poole and we tell you when its next papers are published, before the meeting rather than after it.
5 Seafield Road, Bournemouth, BH6 3JEResolved to GRANT permission in accordance with the recommendation set out in the officer’s report, as updated by the...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.