Planning & Highways Committee, Thursday 17 December 2009 at 7.30pm

07/00570/FUL - Bray Stage II Pipeline

Decided Planning 2 papers

Planning & Highways Committee decided this item on Thursday 17 December 2009. Below is the council's own wording, with the papers it was decided on.

Item71

Resolved

RESOLVED that South East Water be advised that Bracknell Forest Council as the Local Planning Authority would not seek compliance with condition 3 of the planning permission 07/00570/FUL in relation to tunnelling works associated with the rail crossing in Swinley Forest, on the basis that the company followed the approach contained within its letter dated 23 November 2009.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Planning & Highways Committee

Recommendation

2.1That South East Water be advised that BFC as the Local Planning Authority will not seek compliance with the condition 03 of planning permission 07/00570/FUL, in relation to tunnelling works associated with the rail crossing in Swinley Forest, on the basis that the company follows the approach contained in its letter dated 23 November 2009.

3 SUPPORTING INFORMATION

3.1At its meeting on 20 September 2007 the Planning and Highways Committee approved a planning application (07/00570/FUL) for engineering works for the construction of an underground water supply main pipeline from land south of Drift Road, Foliejon Park to the Surrey Hill and Crowthorne Reservoirs with associated shafts, washout chambers, sluice valve chambers, air valves, kiosks and temporary working areas. Condition 03 imposed on this permission controls hours of working as follows:

No construction work or deliveries shall take place outside the hours of 0700 and 1800 Monday to Friday; 0700 and 1400 Saturday and not at all on Sundays and Public Holidays. Where residential properties in A330 (Church Road), Locks Ride, Priory Road, North Road, Church Road (Ascot) and Martins Heron/The Warren are located within 100m of the working width area of the pipeline, these hours shall be restricted to 0900 and 1700 Monday to Friday; 0900 and 1400 Saturday and not at all on Sundays and Public Holidays. REASON: In the interests of the amenities of the area.

3.2A letter has been received from South East Water explaining that its contactor is making preparations to complete the outstanding 120m of pipelaying which includes the drilling of two concrete tunnels under the rail lines in Swinley Forest through which to install steel water-pipes. Network Rail has stipulated that once tunnelling commences, each tunnel should be undertaken as a continuous operation in order to protect the integrity of the railway line and rail and passenger safety. If it complies with this stipulation, South East Water will be in conflict with condition 03 above which restricts hours of working to 0700 and 1800 Monday to Friday; 0700 and 1400 Saturday and not at all on Sundays and Public Holidays. 3.4 The tunnel site is located approximately 200m from the nearest properties on Swinley Road. It is considered unlikely that 24 hour working for the two weeks envisaged will result in an adverse effect on the living conditions of nearby residents. If there is some small impact it is considered that it is outweighed by the need for the tunnelling operations to be carried out as a continuous operation in the interests of rail safety.

3.5The letter from South East Water is attached to this report. This includes reference to the likely impact on residents living close to the Bog Lane access to the works and confirms that all deliveries of plant and materials will be in compliance with condition 03. Provided that this and other matters referred to in the letter are complied with it is not considered expedient for the Local Planning Authority to seek compliance with the condition 03 of planning permission 07/00570/FUL, in relation to tunnelling works associated with the rail crossing in Swinley Forest.

Background Papers Planning permission 07/00570/FUL Letter from South East Water to the Planning Section dated 23 November 2009

Contact for further information Martin Bourne, Development Management [email protected]

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
07/00570/FUL: Bray Stage II PipelineReport 67 KB DownloadRead as text
PDF
11. Bray pipeline Miscellaneous report. attachmentReport 2.1 MB Download

At this meeting

Whole meeting

Who was there

10 of 18 attended
DW
David Worrall CONChair, present
TP
Councillor Tony Packham CONVice-Chair, present
MB
Mike Beadsley LABCommittee Member, present
AB
Councillor Andy BlatchfordCommittee Member, present
MB
Councillor Michael Brossard CONCommittee Member, present
CD
Councillor Colin Dudley CONCommittee Member, present
JF
Jim Finnie CONCommittee Member, present
SR
Mrs Shelagh R Pile CONCommittee Member, present
CT
Clifton Thompson CONCommittee Member, present
TV
Councillor Tony Virgo CONCommittee Member, present
JA
Mrs Jan Angell CONSubstitute
MB
Mrs Maureen Beadsley LABSubstitute

All 18 on the meeting page

More from Bracknell Forest Planning & Highways Committee

All decisions
MeetingDecisionOutcome
26 May 2011 11/00123/FUL - 29 Essex Rise, Warfield, BracknellRESOLVED that the application be refused for the following reason:- 01. The proposed extension by reason of its desig... Refused Open
26 May 2011 11/00177/FUL - 25 Branksome Hill Road College Town SandhurstThe following development plan policies have been taken into account in determining this planning application: Brackn... Decided Open
26 May 2011 PS 11/00239/RTD - Land Opposite Byways Crowthorne Road SandhurstRESOLVED that the siting and appearance of the development proposed be refused for the following reason: 1. The propo... Refused Open
26 May 2011 11/00308/RTD - Land Adjacent To Electricity Substation, Victoria Road, OwlsmoorRESOLVED that the siting and appearance of the development proposed be approved in accordance with the plans as state... Approved Open
25 May 2011 Election of chairmanRESOLVED that Councillor Dudley be elected Chairman of the Planning and Highways Committee for the Municipal Year 201... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies