Council, Tuesday 12 June 2012 at 7.00pm

Community Infrastructure Levy

Decided Committee 6 papers

Council decided this item on Tuesday 12 June 2012. Below is the council's own wording, with the papers it was decided on.

Item11

Resolved

RESOLVED that the public consultation on the Preliminary Draft Charging Schedule as detailed in the report considered by the Executive on 12June be endorsed.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Council

Community Infrastructure Levy: Viability Study

Prepared for Bracknell Forest Council

May 2012 Contents 1 Executive Summary 3 2 Introduction 5 3 Methodology and appraisal inputs 9 4 Development appraisals 12 5 Appraisal outputs 22 6 Assessment of the results 25 7 Conclusions and recommendations 34

Appendices Appendix 1 Map of housing market areas Appendix 2 Residential appraisal results Appendix 3 Commercial appraisal results

Contact details:

Anthony Lee Director – Development Consulting BNP Paribas Real Estate 5 Aldermanbury Square London EC2V 7BP

Tel: 020 7338 4061 Fax: 020 7404 2028 Email: [email removed]

2 1 Executive Summary 1.1 This report tests the ability of a range of development types throughout the Bracknell Forest area to yield contributions to infrastructure requirements through the Community Infrastructure Levy (‘CIL’). Levels of CIL have been tested in combination with the Council’s other planning requirements, including contributions towards the provision of affordable housing.

Methodology 1.2 The study methodology compares the residual land values of a range of generic developments to a range of benchmark land values. If a development incorporating a given level of CIL generates a higher value than the benchmark land value, then it can be judged that the proposed level of CIL will be viable.

1.3The study utilises the residual land value method of calculating the value of each development. This method is used by developers when determining how much to bid for land and involves calculating the value of the completed scheme and deducting development costs (construction, fees, finance and CIL) and developer’s profit. The residual amount is the sum left after these costs have been deducted from the value of the development, and guides a developer in determining an appropriate offer price for the site.

1.4The housing and commercial property markets are inherently cyclical and the Council is testing its proposed rates of CIL at a time when values have fallen below their peak. We have allowed for this by running a sensitivity analysis which inflates sales values by 10% and build costs by 5%. This analysis is indicative only, but is intended to assist the Council in understanding the levels of CIL that are viable in today’s terms but also the impact of changing markets on viability. We have also tested a fall in sales values of 5%, to enable the Council to take a view on the impact of any adverse movements in sales values in the short term.

Key findings 1.5 The key findings of the study are as follows: ■ The results of this study are reflective of current market conditions, which are likely to improve over the medium term. It is therefore important that the Council keeps the viability situation under review so that levels of CIL can be adjusted to reflect any future improvements. ■ The ability of residential schemes to make CIL contributions varies depending on area, type of development and the current use of the site. Having regard to these variations, residential schemes should be able to absorb a CIL rate of between £0 to £220 per square metre, leaving a substantial margin in many areas for site-specific factors that might affect viability. Whilst the maximum rates are significantly higher than the proposed rates in some areas, the buffer will help to mitigate a number of risk factors (primarily the potentially adverse impact on land supply of setting the rates at a high level and ‘shocking’ the market; a situation where landowners react so negatively to the reduction in land values that 1 they cease bringing sites to the market for development) . The Council will also need to be mindful of the potential adverse impact CIL might have on

1 As was the case when Development Gains Tax (1973) and Development Land Tax (1976) were introduced and subsequently abandoned.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Bracknell Forest CIL Map: North Further Update 3May12Appendix 1 1.7 MB Download
PDF
Bracknell Forest CIL Map: South Further Update 3May12Appendix 1 1.6 MB Download
PDF
Bracknell CIL viability report 25May12 _3_Report 550 KB DownloadRead as text
PDF
CIL PDCS 29_05_2012Report 864 KB Download
PDF
Community Infrastructure LevyReport 24 KB Download
PDF
Executive Community Infrastructure Levy 120612 FinalReport 50 KB Download

At this meeting

Whole meeting
11Community Infrastructure LevyThis decision

Who was there

28 of 43 attended
MJ
Councillor Mrs Jennifer McCracken CONMayor, present
MJ
Councillor Mrs Jan Angell CONDeputy Mayor, present
NA
Councillor Nick Allen CONCommittee Member, present
RA
Councillor Robert Angell CONCommittee Member, present
CB
Councillor Chas Baily CONCommittee Member, apologies
MM
Councillor Mrs Mary Ballin CONCommittee Member, present
ME
Councillor Mrs Emma Barnard CONCommittee Member, apologies
DG
Councillor Dr Gareth Barnard CONCommittee Member, present
PB
Councillor Paul Bettison CONCommittee Member, present
DB
Councillor Dale Birch CONCommittee Member, present
MG
Councillor Mrs Gill Birch CONCommittee Member, present
AB
Councillor Andy BlatchfordCommittee Member, present

All 43 on the meeting page

On this subject at Bracknell Forest

Search all
  1. Community Infrastructure LevyThis decision
  2. Approval of the Bracknell Forest Community Infrastructure Levy Charging Schedule 2015, the CIL Instalment Policy and the CIL Regulation 123 Infrastructure List and adoption of the Bracknell Forest Planning Obligations Supplementary Planning Document.Approved
  3. Community Infrastructure Levy Revised Charging Schedule & Draft Obligation Supplementary Planning Document for Public ConsultationApproved
  4. Community Infrastructure Levy - Draft Charging ScheduleApproved
  5. Community Infrastructure Levy Response to Overview and Scrutiny Commission recommendations.Decided
  6. Review of Preparations for the Community Infrastructure LevyAgreed

More from Bracknell Forest Council

All decisions
MeetingDecisionOutcome
15 Jul 2026 Minutes of Previous MeetingRESOLVED that the minutes of the Council meeting held on 22 April 2026 and the Annual Council meeting held on 13 May ... Approved Open
15 Jul 2026 Overview and scrutiny annual report 2025-26RESOLVED that the Council adopt the 2025-26 draft annual report of the overview and scrutiny commission. Approved Open
15 Jul 2026 Review of Political Balance and Committee AppointmentsRESOLVED that the Council: i) APPROVES the revised political balance allocations as set out in the report. ii) AGREES... Approved Open
13 May 2026 Election of the Mayor of the Borough of Bracknell Forest for the 2026/27 Municipal YearRESOLVED that Councillor Frewer be elected Mayor of the Borough of Bracknell Forest for the 2026 – 2027 Municipal Yea... Decided Open
13 May 2026 Nomination of the Deputy Mayor of the Borough of Bracknell Forest for the 2026/27 Municipal YearRESOLVED that Councillor Cochrane be appointed Deputy Mayor of the Borough of Bracknell Forest for the Municipal Year... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies