CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Bracknell Forest Council
Executive, Tuesday 12 June 2012 at 5.00pm

Community Infrastructure Levy

Approved Executive 7 papers

Executive approved this item on Tuesday 12 June 2012. Below is the council's own wording, with the papers it was decided on.

Item3b

Resolved

RESOLVED that the Preliminary Draft Charging Schedule be approved for public consultation subject to Council endorsement.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Executive

Community Infrastructure Levy: Viability Study

Prepared for Bracknell Forest Council

May 2012 Contents 1 Executive Summary 3 2 Introduction 5 3 Methodology and appraisal inputs 9 4 Development appraisals 12 5 Appraisal outputs 22 6 Assessment of the results 25 7 Conclusions and recommendations 34

Appendices Appendix 1 Map of housing market areas Appendix 2 Residential appraisal results Appendix 3 Commercial appraisal results

Contact details:

Anthony Lee Director – Development Consulting BNP Paribas Real Estate 5 Aldermanbury Square London EC2V 7BP

Tel: 020 7338 4061 Fax: 020 7404 2028 Email: [email removed]

2 1 Executive Summary 1.1 This report tests the ability of a range of development types throughout the Bracknell Forest area to yield contributions to infrastructure requirements through the Community Infrastructure Levy (‘CIL’). Levels of CIL have been tested in combination with the Council’s other planning requirements, including contributions towards the provision of affordable housing.

Methodology 1.2 The study methodology compares the residual land values of a range of generic developments to a range of benchmark land values. If a development incorporating a given level of CIL generates a higher value than the benchmark land value, then it can be judged that the proposed level of CIL will be viable.

1.3The study utilises the residual land value method of calculating the value of each development. This method is used by developers when determining how much to bid for land and involves calculating the value of the completed scheme and deducting development costs (construction, fees, finance and CIL) and developer’s profit. The residual amount is the sum left after these costs have been deducted from the value of the development, and guides a developer in determining an appropriate offer price for the site.

1.4The housing and commercial property markets are inherently cyclical and the Council is testing its proposed rates of CIL at a time when values have fallen below their peak. We have allowed for this by running a sensitivity analysis which inflates sales values by 10% and build costs by 5%. This analysis is indicative only, but is intended to assist the Council in understanding the levels of CIL that are viable in today’s terms but also the impact of changing markets on viability. We have also tested a fall in sales values of 5%, to enable the Council to take a view on the impact of any adverse movements in sales values in the short term.

Key findings 1.5 The key findings of the study are as follows: ■ The results of this study are reflective of current market conditions, which are likely to improve over the medium term. It is therefore important that the Council keeps the viability situation under review so that levels of CIL can be adjusted to reflect any future improvements. ■ The ability of residential schemes to make CIL contributions varies depending on area, type of development and the current use of the site. Having regard to these variations, residential schemes should be able to absorb a CIL rate of between £0 to £220 per square metre, leaving a substantial margin in many areas for site-specific factors that might affect viability. Whilst the maximum rates are significantly higher than the proposed rates in some areas, the buffer will help to mitigate a number of risk factors (primarily the potentially adverse impact on land supply of setting the rates at a high level and ‘shocking’ the market; a situation where landowners react so negatively to the reduction in land values that 1 they cease bringing sites to the market for development) . The Council will also need to be mindful of the potential adverse impact CIL might have on

1 As was the case when Development Gains Tax (1973) and Development Land Tax (1976) were introduced and subsequently abandoned.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Bracknell Forest CIL Map: North Further Update 3May12Appendix 1 1.7 MB Download
PDF
Bracknell Forest CIL Map: South Further Update 3May12Appendix 1 1.6 MB Download
PDF
residential resultsAppendix 2 1.2 MB Download
PDF
commercial resultsAppendix 3 149 KB Download
PDF
Bracknell CIL viability report 25May12 _3_Report 550 KB DownloadRead as text
PDF
CIL PDCS 29_05_2012Report 864 KB Download
PDF
Community Infrastructure LevyReport 50 KB Download

At this meeting

Whole meeting

Who was there

7 of 9 attended
PB
Councillor Paul Bettison CONChair, present
AW
Councillor Alan Ward CONVice-Chair, apologies
MM
Councillor Mrs Mary Ballin CONCommittee Member, present
DG
Councillor Dr Gareth Barnard CONCommittee Member, present
DB
Councillor Dale Birch CONCommittee Member, present
MB
Councillor Marc Brunel-Walker CONCommittee Member, present
MD
Councillor Mrs Dorothy Hayes MBE CONCommittee Member, present
IM
Councillor Iain McCracken CONCommittee Member, present
KS
Katharine SimpsonClerk, expected

On this subject at Bracknell Forest

Search all
  1. Community Infrastructure LevyThis decision
  2. Approval of the Bracknell Forest Community Infrastructure Levy Charging Schedule 2015, the CIL Instalment Policy and the CIL Regulation 123 Infrastructure List and adoption of the Bracknell Forest Planning Obligations Supplementary Planning Document.Approved
  3. Community Infrastructure Levy Revised Charging Schedule & Draft Obligation Supplementary Planning Document for Public ConsultationApproved
  4. Community Infrastructure Levy - Draft Charging ScheduleApproved
  5. Community Infrastructure Levy Response to Overview and Scrutiny Commission recommendations.Decided
  6. Review of Preparations for the Community Infrastructure LevyAgreed

More from Bracknell Forest Executive

All decisions
MeetingDecisionOutcome
17 Sep 2024 Town Centre Off Street Day Rate Car Park ChargesRESOLVED that i. the Executive noted the options on charging tariffs for The Avenue, Braccan Walk and Weather Way car... Noted Open
17 Sep 2024 Housing Supplementary Planning Document (SPD) consultationRESOLVED that i. the content of the Draft Housing SPD is agreed. ii. a public consultation on the Draft Housing SPD b... Agreed Open
17 Sep 2024 Approval of Biodiversity Action Plan 2024-2029RESOLVED that the Bracknell Forest Biodiversity Action Plan (BAP) 2024-2029 and supporting summary document is approved. Approved Open
17 Sep 2024 Council Plan Overview Report Q1RESOLVED that the performance of the council over the period from April to June 2024 highlighted in the Overview Repo... Noted Open
17 Sep 2024 Quarterly update on SEND ImprovementRESOLVED that the Executive: i. notes the progress made on implementing the SEND WSOA to improve services to children... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies