It was agreed that this option would be explored and a paper detailing the contractual options would be brought to the Board’s next meeting. RESOLVED that: The report be noted FCC staff be thanked for the work they undertook to ensure that Smallmead HWRC remained operational during the period of recent flooding Staff at FCC, SITA , Veolia and council officers be thanked for the work undertaken to minimise disruption during recent electrical cabling work in the vicinity of Longshot Lane HWRC Officers prepare a paper looking at the contractual options for future Community Paint Reuse Contracts for the next Board meeting
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
3.1The Thames Valley has been affected by flooding throughout most of February. Of particular relevance to the Joint Waste Disposal Board is the impact on Island Road.
3.2Island Road flooded on Thursday 6th February and was closed by Reading Borough Council Highways and Drainage team. The road closure was in place for 18 days.
3.3The initial flooding covered the entire middle section of Island Road. Over the course of the period of the road closure, the flooding slowly receded to the point on Monday 24th February that the road could be reopened.
3.4The depth and coverage of the flooding presented a risk to residents wishing to access the HWRC. A further and enduring risk was that a drainage inspection cover had broken loose. While the flooding remained, it was impossible to fully assess the extent of the damage, repair the inspection cover or clear debris which had accumulated in the road. As a result of these risks to safety, the road remained closed.
3.5Communication of the road closure, via websites and local media, was handled by each of the re3 councils as appropriate. There were also direct queries by email and phone. Welcome additional support was given by the councils’ PFI Contractor in the form of staff ‘manning’ the entrance to Island Road to inform prospective visitors about the road closure.
3.6In the main, residents, whilst no-doubt finding the closure to be inconvenient, seemed to appreciate the clear and apparent risks and accepted the reasons for the road closure. Some residents were happy to keep their waste items until after the closure had been lifted. Others were redirected to Longshot Lane in Bracknell.
3.7Another potential service impact was on the council collection of waste. Whilst there were few areas in which the three council waste collection services could not operate because of flooding, the closure of Island Road might have meant that collected waste could not be processed or that it had to be hauled elsewhere for processing (at additional cost). 3.8 Contingency arrangements were promptly put in place by the re3 Project Team and the PFI Contractor which meant that waste collection across the re3 area was able to continue.
3.9The contingency arrangements, and the helpful cooperation of the waste collection services, meant that, from the perspective of residents, there was no disruption to the waste collection service as a result of the flooding in Island Road.
3.10Clear-up operations, both by agencies and individual residents, are underway and they are likely to result in additional waste disposal costs for the councils.
3.11Most sandbags were deployed in either Reading or Wokingham Boroughs. In relation to the specific cost of disposing of sandbags (those which are deemed necessary for disposal), the re3 Project Team has identified the likely unit cost and will be able to identify the per-council total.
Other Items
3.12Members will recall from the report presented at the last Joint Waste Disposal Board, that Scottish and Southern Electricity (SSE) cabling works were due to cause some disruption to services at the re3 facility at Longshot Lane in Bracknell.
3.13The works, to connect the Bracknell Primary Substation with Wokingham, precipitated the temporary closure of Longshot Lane Household Waste Recycling Centre (HWRC) and partial closure of the Transfer Station.
3.14SSE was able to complete the section of cabling works immediately adjacent to the entrance to Longshot Lane within the time allotted (January 29th to February 1st inclusive) and the facility was able to reopen as planned.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.