High Street Multi Storey Car Park - Condition Survey

Decided Executive 1 paper

Executive decided this item on Tuesday 18 July 2023. Below is the council's own wording, with the papers it was decided on.

Item15

Resolved

RESOLVED that: i. The High Street Car Park be closed at the end of October 2023, following the recommendation made by Structural Engineers. ii. The Assistant Director, Property engages with stakeholders affected which includes the commercial unit tenants (9), Council staff, season ticket holders, Town Centre partners and other parties that have an interest to ensure the implications of this decision are understood. iii. Savings that will be realised in expenditure budgets in the current year from the midyear closure be used to fund decommissioning work including erecting hoarding, securing the site, and commissioning pre and post decommissioning structural surveys. iv. The High Street Car Park site be added to the Bracknell Town Centre Southern Gateway site masterplan area. Outline plans for which will be presented for consideration to the Executive in Autumn 2023.
Word for word from the decision Bracknell Forest published for this meeting. Source: democratic.bracknell-forest.gov.uk

Follow this further

Built from Bracknell Forest's papers

What the report saysPro

Report to Executive

Alternative options considered

4.1The structural engineers report sets out a number of options that could be pursued. The only viable alternative presented was that loading (usage) of the site could be further reduced from 60% of bays available to 30%. This could extend the life beyond the December 2023 date. However, an increase regime of monitoring would be needed to offset the increasing risk of structural failure. This was therefore rejected as an option. 5. Supporting Information

Background

5.1High Street Car Park, was built in the 1970s and is constructed as a reinforced concrete structural frame. It spans a split level of 9 floors, over 23,000m2 with a total of 980 parking spaces. The upper levels are accessed from The Ring, with the industrial units located at Ground level and lower ground level accessed via Market Street. Additionally, there is a large underground surface water attenuation chamber which covers the majority of the above ground structural area and part of the concrete apron within the Market Street section of the building.

5.2Since 2018 there has been an annual programme of re-covering the top surface of the car park floor after sections had started to show signs of wear and cracking. The first year’s programme showed a number of variations during the project. After stripping the surface back to exposed concrete, the number of concrete repairs works from the deck were found to be larger than first anticipated.

5.3As a result, specialist structural engineers, were commissioned to initially look at the areas of concern. However, this review was expanded to the whole structure following their on-site investigations. A series of inspections were then undertaken between October 2020, to date.

5.4A report received from the structural engineers on the 20th December 2022 advised that the council should immediately reduce the current load per floor. This was actioned on the 21st December 2022 (as per the below image). A further survey was undertaken in May 2023 with a recommendation stating the car park will be required to be closed no later than December 2023, due to the level of corrosion within the concrete reinforcement, which cannot be reversed or remedied.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
High Street Multi Storey Car Park: Condition SurveyReport 489 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

7 of 8 attended
MT
Councillor Mary Temperton LABChair, present
KN
Councillor Kathryn Neil LABVice-Chair, present
RB
Councillor Roy Bailey LABCommittee Member, apologies
PB
Councillor Paul Bidwell LABCommittee Member, present, as expected, virtual
GG
Councillor Guy Gillbe LABCommittee Member, present
KJ
Councillor Kandy Jefferies LABCommittee Member, present, as expected, virtual
HP
Councillor Helen Purnell LABCommittee Member, present
MW
Councillor Megan Wright LABCommittee Member, present

On this subject at Bracknell Forest

Search all
  1. High Street Multi Storey Car Park - Condition SurveyThis decision
  2. PA/2026/0294 - High Street Car Park, The Ring, Bracknell, RG12 1GNApproved
  3. Application for the grant of a new premises licence - Sangeetha Restaurant and Banquet Hall, 5 High Street, Bracknell, RG12 1DHDecided
  4. Application for for the granting of a new premises licence in respect of Popeye’s, High Street, BracknellAgreed
  5. Demolition of High Street Car Park and Support and Relocation Strategy for Market Street TenantsApproved
  6. 24/00440/FUL Meadow End 273 High Street Crowthorne Berkshire RG45 7AHApproved

More from Bracknell Forest Executive

All decisions
MeetingDecisionOutcome
17 Sep 2024 Town Centre Off Street Day Rate Car Park ChargesRESOLVED that i. the Executive noted the options on charging tariffs for The Avenue, Braccan Walk and Weather Way car... Noted Open
17 Sep 2024 Housing Supplementary Planning Document (SPD) consultationRESOLVED that i. the content of the Draft Housing SPD is agreed. ii. a public consultation on the Draft Housing SPD b... Agreed Open
17 Sep 2024 Approval of Biodiversity Action Plan 2024-2029RESOLVED that the Bracknell Forest Biodiversity Action Plan (BAP) 2024-2029 and supporting summary document is approved. Approved Open
17 Sep 2024 Council Plan Overview Report Q1RESOLVED that the performance of the council over the period from April to June 2024 highlighted in the Overview Repo... Noted Open
17 Sep 2024 Quarterly update on SEND ImprovementRESOLVED that the Executive: i. notes the progress made on implementing the SEND WSOA to improve services to children... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies