RESOLVED that the Assistant Director: Planning be recommended to APPROVE the application subject to the following conditions amended, added to or deleted as the Assistant Director: Planning considers necessary: 01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 02. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority on: 25.01.24,17.01.24, 29.09.23 and 09.08.23: 3091-APLB-XX-XX-DR-A-4000/ P6 3091- APLB- ZZ- ZZ- DR- A- 4001/P5 3091-APLB-XX-XX-DR-A-2100/ P17 3091- APLB- ZZ- ZZ- DR- A- 3140/P5 3091- APLB- ZZ- ZZ- DR- A- 3130/P5 3091- APLB- ZZ- ZZ- DR- A- 2116/P5 3091- APLB- ZZ- ZZ- DR- A- 2115/P5 3091- APLB- ZZ- ZZ- DR- A- 2114/P5 3091- APLB- ZZ- ZZ- DR- A- 2113/P5 3091- APLB- ZZ- ZZ- DR- A- 2112/P5 3091- APLB- ZZ- ZZ- DR- A- 2111/P5 3091- APLB- ZZ- ZZ- DR- A- 2110/P5 3091- APLB- ZZ- ZZ- DR- A- 3140/P5 3091- APLB- ZZ- ZZ- DR- A- 3130/P5 3091- APLB- ZZ- ZZ- DR- A- 3120/P5 3091- APLB- ZZ- ZZ- DR- A- 3110/P5 3091- APLB- XX- XX- DR- A- 2200/P7 3091- APLB- XX- XX- DR- A- 1100/P3 3091- APLB- XX- XX- DR- A- 1000/P4 Energy and Sustainability Statement V1.2 - 08th April 2024 Drainage and Flood Risk Assessment April 2024 Preliminary Ecological Assessment Report June 2023 Rev A REASON: To ensure that the development is carried out only as approved by the Local Planning Authority. 03. No development shall take place until samples of the materials ... view the full minutes text for item 6.
Word for word from the decision Bracknell Forest published for this meeting.Source: democratic.bracknell-forest.gov.uk
1.1The site is within a settlement area where development is acceptable in principle. The proposed development is considered to be acceptable in terms of its design and layout and any impact on nearby residential properties.
1.2The proposal is considered acceptable in highway terms. Car parking is provided to meet adopted car parking standards. The loss of garages on the site is not considered likely to result in on street parking in the local area. The garages are in a poor state of repair with only 24 of the 55 garages currently in use. Alternative garages are available in the area, owned by the applicant, and will be made available to tenants and private owners of garages. Surveys carried out indicate that the site is not used as overflow parking to serve the local area with only 1 vehicle registered as parking on the site during the survey periods.
1.3Biodiversity Net Gain (BNG) in excess of 10% can be achieved on the site.
1.4The site is in Flood Zone 1 and it is not considered that the development will result in increased flooding on the site or in the local area.
1.5Affordable housing will be provided on site to meet the requirements of the Local Plan. Four affordable housing units will be provided with one of these units being wheelchair accessible.
RECOMMENDATION Planning permission be granted subject to conditions and a S106 Agreement as set out in Section 11 of this report
2. REASON FOR REPORTING APPLICATION TO COMMITTEE
2.1The application has been reported to the Planning Committee because more than 5 objections have been received.
3. PLANNING STATUS AND SITE DESCRIPTION
PLANNING STATUS Settlement Area Sited within the 400m – 5km buffer zone of the Thames Basin Heaths SPA
3.1The site measures approximately 0.48ha and has pedestrian access from both Merryhill Road to the south and Shepherds Lane to the north. Vehicular access to the site is from Merryhill Road. The north and west boundaries are shared with rear gardens to properties on Hart Close and Shepherds Lane.
3.2Levels fall significantly from east to west, with the existing three rows of garages stepped to follow the slope.
Planning Committee 13th June 2024 3.3 Properties surrounding the site are primarily two-storey, with the three-storey Mostyn House to the south. Concrete hardstanding extends across the whole site.
4. RELEVANT SITE HISTORY
4.1There is no relevant site history.
5. THE PROPOSAL
5.1This is a full application for the demolition of 55 garages and the erection of 11 new houses (6 x 2-bedroom and 5 x 3-bedroom) car parking, cycle parking, refuse storage, amenity space and landscaping. Each house is provided with cycle storage in a shed in the rear garden with a bin store provided for each property. Landscaping is shown along the access road and around the end of the central parking area.
Planning Committee 13th June 2024 6. REPRESENTATIONS RECEIVED
Representations
6.1A total of 19 valid representations have been received raising the following planning considerations:
• Parking in Horseneile Lane, Dukeshill Road, Fraser Road, Merryhill Road, Hart Close and • Shepherds Lane is already difficult with on street parking and a residents permit parking area close to the site, pushing parking onto local streets.
Planning Committee 13th June 2024 • 11 houses is an overdevelopment of the site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.