Resolved
RESOLVED that the Assistant Director: Planning be authorised to APPROVE the application 22/00868/FUL subject to the following conditions amended, added to or deleted as the Assistant Director: Planning considers necessary: 01. The development hereby permitted shall be begun before the expiration of three years from the date of this permission. REASON: To comply with Section 91 of the Town and Country Planning Act 1990. 02. The development hereby permitted shall be carried out only in accordance with the following approved plans received by the Local Planning Authority. 001-PL04 - Location and Block Plans received 02.05.2024 003-PL07 - Proposed Site Plan received 10.06.2023 005-PL01 - Proposed Site Levels and surfaces received 10.06.2023 020-PL01 - Proposed GF & 1st Floor Plans dated 08.12.2022 021-PL01 - Proposed Roof Plans dated 08.12.2022 031-PL01 - Proposed Elevations dated 08.12.2022 Flood Risk Assessment (Ref: AEG3747 RG42 Berkshire 01) received 21.12.2023 Bat Survey Report (February 2023) REASON: To ensure that the development is carried out only as approved by the Local Planning Authority. 03. No structure hereby permitted shall be built above existing ground level until samples of the materials to be used in the construction of the external surfaces of the development hereby permitted have been submitted to and approved by the Local Planning Authority. The development shall be carried out in accordance with the approved details. REASON: In the interests of the visual amenities of the area. [Relevant Policies: BFLP LP 28, LP 50] 04. No development shall take place until a scheme has been submitted to and approved in writing by the Local Planning Authority, to accommodate: (a) Parking of vehicles of site personnel, operatives and visitors (b) Loading and unloading of plant and vehicles (c) Storage of plant and materials used in constructing the development (d) Wheel cleaning facilities (e) Temporary portacabins and welfare for site operatives (f) areas for the turning of construction and demolition vehicles such that the largest anticipated vehicles can turn and leave the site in a forward gear without damage to the culvert at the access to Jocks Lane and each facility shall in accordance with the approved scheme, be retained throughout the course of construction of the development, free from any impediment to its designated use. No other areas on the site, other than those in ... view the full minutes text for item 8.