Resolved
Endorsed the proposals set out in paragraphs 3.14 and 3.16 for consultation with local residents groups and industry representatives with a view to reporting back prior to formal adoption.
Planning Committee approved this item on Wednesday 22 May 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Endorsed the proposals set out in paragraphs 3.14 and 3.16 for consultation with local residents groups and industry representatives with a view to reporting back prior to formal adoption.
1.1Basements are an established feature of many forms of commercial and larger developments in Brent and other areas. However, recent years have seen an increase in demand for basements to existing residential properties leading to concerns by some residents and groups about a range of issues. A number of applications have been reported to the Planning Committee where these issues, and particularly Conservation Area design concerns, have been considered. This report reviews this approach along with those of other authorities and proposes some measures should assist the assessment of applications as well responding to the concerns that are raised.
2.1That the Planning Committee endorse the proposals in paras 3.14 and 3.16 for consultation with local residents groups and industry representatives with a view to reporting back prior to formal adoption.
3.0Details
3.1Basements are a feature of many larger commercial and residential developments and regularly provide areas for parking, storage and plant. These have not usually raised significant objections, even where they are located close to boundaries. Neither has there been a history of concerns over their structural integrity or implications on other properties.
Meeting Version no. Date Date 3.2 Parts of Brent, in common with some other areas of London, now experience demand for basements to various property types. This mostly affects properties in parts of the south of the Borough. Much of Brent’s demand appears to be from owner-occupiers of houses, and to a lesser degree ground floor converted flats, who wish to extend their living accommodation rather than to create basement flats. Brent’s property market does not seem to support some of the multiple level basements experienced elsewhere.
3.3The issues that have caused most concern for Brent have generally been raised in Conservation Areas in the south of the Borough. The principal concerns and the responses to these to date are summarised below;
a) Design/Landscape impact – including impact on front and rear gardens where basements are not a feature of the local area.
Response: Limiting size of basements to the footprint of the building on public frontages and restricting to rear to what would normally be acceptable as rear extensions. The size and design of light-wells are also restricted.
b) Structural Damage – actual or feared, due to construction method and as a result of creating mass concrete structure while leaving adjoining, often attached, properties on their original shallow foundations.
Response: Dramatic failures can occur during construction but should be covered by Building Regulations and the owners/contractors responsibility to build safely. Differential movement can occur for a variety of reasons and the Party Wall Act 1996 was introduced to provide a process to assess damage in these circumstances.
c) Hydrological or geological considerations – these are sometimes raised in conjunction with b) above and include fears of particular impacts on water courses, ground water levels or the safety of substrata.
Response: These fears are acknowledged but Brent does not generally have a high water table and areas with a history of flooding are usually related to local surface drainage issues. In terms of geology, the majority of the Borough sits on London clay which does not raise specific construction problems that cannot be routinely overcome. Neither the Environment Agency or Building Control have raised in principal objections on these issues.
d) Construction nuisance and amenity – noise and mess during excavation, obstruction and inconvenience due to the number of skips required, inconvenience to neighbours – including occupiers of upper floors.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Basement Developments in Brent: Proposed additional planning application validation requirementsReport | 112 KB | DownloadRead as text |
Follow Planning Committee at Brent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 5 Aug 2026 | Apologies for AbsenceApologies for absence were received from Councillor Gallagher with Councillor Ahmadi-Moghaddam substituting. Apologie... | Decided | Open |
| 5 Aug 2026 | Declarations of interestsNo declarations of interest were made during the meeting. | Decided | Open |
| 5 Aug 2026 | Minutes of the previous meetingRESOLVED that the minutes of the previous meeting held on Thursday 2 July 2026 be approved as a correct record of the... | Approved | Open |
| 5 Aug 2026 | 26/0225 - Brent NHS Primary Care Trust, Wembley Centre For Health & Care, 116 Chaplin Road, Wembley, HA0 4UZGranted planning permission subject to: (1) The prior completion of a satisfactory legal agreement; and (2) The condi... | Agreed | Open |
| 5 Aug 2026 | Any Other Urgent BusinessThere was no other urgent business. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.