(i) That conceptual designs jointly developed by Brent and Camden for a proposed urban realm improvement and traffic safety scheme for A5 Kilburn High Road, including a reduced 20mph speed limit between Willesden Lane and Kilburn Station be noted; (ii) That subject to agreement to LIP funding requirements, further preliminary and detailed design work be undertaken in collaboration with London Borough of Camden leading to a full public consultation over the proposals in 2014/15.
Word for word from the decision Brent published for this meeting.Source: democracy.brent.gov.uk
1.1This report seeks the approval of the committee to implement a traffic management and road safety scheme with an associated 20 mph speed limit on the section of the A5 Kilburn High Road between Willesden Lane and Kilburn Station. This is a jointly developed scheme which Camden and Brent Councils have been working on to improve public realm and safety along the corridor. The scheme will extend from Willesden Lane to Kilburn Station and on through the borough of Camden to their border with Westminster.
Recommendations
2.1That the Committee notes conceptual designs jointly developed by Brent and Camden for a proposed urban realm improvement and traffic safety scheme for A5 Kilburn High Road, including a reduced 20mph speed limit between Willesden Lane and Kilburn Station.
2.2That, subject to agreement to LIP funding requirements, further preliminary and detailed design work is undertaken in collaboration with LB Camden leading to a full public consultation over the proposals in 2014/15.
Background
3.1The A5 corridor is an important link on the strategic road network. It is also important as a local link, connecting town centres such as Kilburn. It has mixed frontage uses along its length and there are a number of important district shopping centres that serve the needs of communities that border the corridor. In addition to these varied functions, the A5 will accommodate the needs of new development along its length, including the major Brent Cross development.
3.2The A5 acts as a boundary to neighbouring boroughs and in the south, at Kilburn High Road, a boundary road agreement exists between Brent and Camden Councils. This agreement divides responsibility for Kilburn High Road between the two boroughs. Brent is responsible for the section north of Willesden Lane, with Camden taking responsibility for the section south of Willesden Lane (as illustrated in Appendix A).
3.3Camden is looking to implement a borough wide 20 mph limit, of which the Kilburn High Road is a part.
3.4Camden and Brent are jointly developing a concept scheme for the High Road which improves public realm and includes traffic management measures, including a central median strip, as part of the design. The current concept involves improving the public realm by removing street clutter such as reducing the number of signs and removing pedestrian guardrail where appropriate. The introduction of a ‘central median strip’ along parts of the High Road would assist pedestrians to cross and improve safety. The central median strip would be a raised surface 1-2m wide running down the centre of the carriageway and could incorporate street trees to further improve the environment.
3.5The scheme includes the establishment of five different character areas. These include two gateway areas at the northern and southern ends of Kilburn High Road, a cultural area, a secondary town centre shopping area and primary town centre shopping area. The Northern Gateway and Cultural Area together with a small part of the Secondary Town Centre are within Brent.
3.6Brent Council is working with Camden on the concept and, subject to committee approval, we are proposing to prioritise LIP funding in 2104/15 and 2015/16 so that further detailed design and development work can be undertaken prior to consultation and implementation. Camden has funding agreed and are looking to develop parts of the scheme on their section of the High Road by 2014/15.
3.7It should be emphasised that the scheme is still a concept and has not yet been developed as a formal scheme, so we are keen that expectations of local residents are not heightened ahead of the availability of funding. Once a more formal scheme has been developed, a comprehensive local consultation will be undertaken.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Minutes of the Previous MeetingIt was RESOLVED that the minutes of the previous meeting held on 27 June 2017 be approved as an accurate record of th...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.