(1) That the following application be referred to Council as a proposal that represents a departure from the Development Plan which the Development Control Committee are not disposed to refuse as the development forms part of the Police rationalisation strategy to invest in their Headquarters site which will allow the early release of their land at Waterton Cross as part of the wider Bridgend Strategic Regeneration Growth Area. (2) That if Council resolve to approve the proposal, the conditions detailed in the report of the Corporate Director Communities be attached to the consent Code No. Proposal P/16/939/FUL Construct a single storey cafe building with ancillary spaces for use by the South Wales Police
Word for word from the decision Bridgend published for this meeting.Source: democratic.bridgend.gov.uk
REFERENCE: P/16/939/FUL APPLICANT: Police & Crime Commissioner S. Wales LOCATION: South Wales Police Headquarters, Cowbridge Road, Bridgend CF31 3SU PROPOSAL: Construct a single storey cafe building with ancillary spaces for use by the South Wales Police RECEIVED: 22 November 2016 SITE INSPECTED: 21 December 2016
APPLICATION/SITE DESCRIPTION
The application seeks consent to erect a single storey building on previously developed land within the grounds of South Wales Police Headquarters to provide a modern replacement café building with ancillary spaces. It represents an alternative scheme to a previous application (P/16/701/FUL refers) for a larger facility that is 10m longer and 138 sq. m. larger than the original scheme.
Proposed Site Plan under P/16/701/FUL Proposed Site Plan
The proposed building will be centrally located within the Police Headquarters site, to the north-west of a new entrance block/headquarters building, to the north of the security lodge and to the south east of the “Ty Coffi” building and police operations and support offices which are due to be demolished. 1
Application Number ) Mast
Skid Pan P/16/939/FUL
Li nd Co say
4 8 ur t
3 7 9
2 Lindsay
6 Court
1 11
5 SE 12
RI ' ES M JA
Tank ST
South Wales Police Headquarters Hafan Deg
CO W El Sub Sta
BR ID TCB Mast GE )
RO AD
War Meml
MS
Mark Shephard Scale 1:1,250 Corporate Director-Communities (c) Crown Copyright and database rights (2016) Ordnance Survey (100023405)
O/Drive/Plandraw/new MI layouts/ (c) Hawlfraint a hawliau cronfa ddata'r Goron (2016) Rhif Trwydded yr Arolwg Ordnans (100023405)
(c) Cities Revealed Aerial Photography copyright, The Geoinformation Group (2009) Tel: 01656 643176 Committee DC Plan The site is designated as part of a wider residential allocation in the Bridgend Strategic Regeneration Growth Area for approximately 138 units (including 28 Affordable Housing Units) under Policy COM1 (5) of the Local Development Plan (2013).
The alternative and re-sited scheme includes a larger single storey building which will accommodate a café with an associated servery and kitchen, a resources room, a communications room, a prayer room, toilets and a plant room.
The resubmitted application has been advertised as a departure to the Local Development Plan (LDP) and is referred to the Development Control Committee on that basis. It will also be referred to the full Council meeting on 1 February 2017 subject to a positive resolution from Members.
The proposed building will have a total gross floor area of approximately 638 sq. m. and will measure 45.6 metres in length x 14 metres in depth with a maximum height of 4.95 metres. The materials, finishes and arrangements will match the new second floor extension to the main headquarters building.
RELEVANT HISTORY
P/16/789/DPN Prior notification for demolition of Ty Coffi building and police operations and support offices
P/16/701/FUL Construction of a single storey cafe building with ancillary spaces for use by South Wales Police th P/16/86/FUL Consent Issued 5 April 2016 Construct three storey extension to existing building, 11 space visitor car park and associated works
P/15/190/FUL Consent Issued 7th July 2015 Construct of third storey on existing two storey building and assoc works
PUBLICITY th The application has been advertised as a departure to the development plan on site (6 th December, 2016) and in the press (8 December, 2016). The period allowed for response to consultations/publicity expired on 28th December 2016.
CONSULTATION RESPONSES
Dwr Cymru/Welsh Water Developer Services has no objections subject to conditions and advisory notes.
Head of Street Scene (Highways) has no objections to the proposal.
Head of Street Scene (Drainage) has no objection subject to conditions and advisory notes.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.