Resolved
That Development Control Committee note the content of the report and the response to the request for comments on the applicant’s Scoping report.
Development Control Committee noted this item on Thursday 4 March 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
That Development Control Committee note the content of the report and the response to the request for comments on the applicant’s Scoping report.
1.1This report seeks to advise Members of a response that has been prepared (and submitted to the Planning Inspectorate) by the Local Planning Authority to a request for comments on a Scoping Report prepared by the applicant for up to twenty six wind turbines and associated works on land at Bryn and Penhydd Forest, between Port Talbot and Maesteg.
1.2The development is classed as a Development of National Significance (DNS).
2. Connection to Corporate Improvement Plan/Other Corporate Priorities
2.1The delivery of the County Borough’s statutory Planning function has links to the Council’s corporate priorities in particular number 1 – supporting a successful economy.
3.1The purpose of the DNS process is to ensure timely decisions are made on those Planning applications that are of the greatest significance to Wales because of their potential benefits and impacts.
3.2Before the application is formally lodged with the Planning Inspectorate Wales (PINS) the applicant can request a Scoping Direction to advise the content of an Environmental Statement that will accompany the DNS application.
3.3In preparing their Scoping Direction PINS will take into account the specific characteristics of the development and the environmental features likely to be affected by the development as identified by the developer in the applicant’s Scoping Report: Biological Environment – Ecology Assessment and Ornithology Assessment Physical Environment – Landscape and Visual Impact Assessment (LVIA), Cultural Heritage Assessment and Hydrology, Geology and Hydrological Assessment Population and Human Health – Traffic and Transport Assessment, Noise Assessment, Forestry Assessment, Health and public Safety, Aviation and Existing Infrastructure
3.4PINS has consulted Bridgend County Borough Council (BCBC) (and Neath Port Talbot County Borough Council (NPT CBC)) for our advice on the scope of the EIA and the proposed methodologies outlined in the Scoping Report, in relation to BCBC’s functions, in order to inform their Scoping Direction. The response had to reach PINS by Monday 15 February 2021.
3.5At this stage, the proposed development is envisaged as comprising: • up to 26 turbines of up to 250 m maximum tip height and indicative up to 170m rotor diameters and associated crane hardstandings; • transformers housed adjacent to turbines; • onsite access tracks plus underground cable runs alongside; • an on-site sub-station building; • construction compound(s); • battery storage; • one or more permanent anemometry masts (at up to the hub height of the turbines); and • borrow pits.
3.6The lifetime of the proposed development would be up to 50 years from commissioning to decommissioning. Of the 26 turbines only one will be within BCBC. Turbine component deliveries are anticipated to come from Swansea docks and along the M4 towards the site however, a number of options are being investigated for final site access. For example, some of the smaller components may be transported to the area via BCBC.
3.7The formal response has been prepared to meet the requirements of the Developments of National Significance (Procedure) (Wales) Order 2016 (as Amended) and the Town & Country Planning (Environmental Impact Assessment) (Wales) Regulations 2017.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Request For Scoping Direction By Natural Power Consultants Limited (Natural Power) On Behalf Of Y Bryn Wind Farm Limited: Y Bryn Wind Farm (Land At Bryn And Penhydd Forest, Located Between Port Talbot And Maesteg): Up To 26 Turbines (6.6 Mw Per Turbine) And Battery Storage: Response To Scoping ReReport | 642 KB | DownloadRead as text |
Follow Development Control Committee at Bridgend and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 19 Oct 2023 | Site VisitsThat a date for any site visits agreed by the Committee or identified in advance of the next meeting by the Chairpers... | Agreed | Open |
| 19 Oct 2023 | Approval of MinutesThat the Minutes of a meeting of the Development Control Committee dated 7 September 2023, be approved as a true and ... | Approved | Open |
| 19 Oct 2023 | Amendment SheetThe was accepted by the Chairperson as an urgent item under Part 4, paragraph 4 of the Council Procedure Rules. | Decided | Open |
| 19 Oct 2023 | Development Control Committee GuidanceThat the report of the Corporate Director – Communities, outlining the be noted. | Noted | Open |
| 19 Oct 2023 | P/23/147/FUL - Rear of 82 Merthyr Mawr Road, Bridgend, CF31 3NSThat the above application be granted, subject to the Conditions contained in the report of the Corporate Director – ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.