(1) That having regard to the above application, the applicant enters into a Section 106 Agreement to:- i. Provide a minimum of 20% of the units as affordable housing with the type of unit(s), location within the site and affordable tenure to be agreed by the Council or a financial contribution towards off-site provision of affordable dwellings to an equivalent value. ii. Provide a financial contribution of £6,234 on the commencement of development towards the provision/upgrading of children’s play space and outdoor sports facilities in the vicinity of the application site. ii. Comply with the Design Brief and Phasing Plan to be agreed in respect of condition 2. iii. Agree a programme for the management of all retained trees and new tree and hedge planting on the development site and adjacent woodland area. (2) That the Corporate Director Communities be given delegated powers to issue a decision notice granting Outline consent in respect of this proposal once the applicant has entered into the aforementioned Section 106 Agreement, subject to the Conditions contained in her report, in addition to the standard Reserved Matters conditions: - Proposal Demolition of existing offices (former Resource Centre for Groundwork Trust) and proposed 6 detached houses in outline with all matters reserved.
Word for word from the decision Bridgend published for this meeting.Source: democratic.bridgend.gov.uk
REFERENCE: P/21/483/OUT APPLICANT: [name removed] c/o Plan R Ltd, 39 Merthyr Mawr Road, Bridgend, CF31 3NN LOCATION: Land adjacent to Tondu Ironworks Tondu CF32 9TF PROPOSAL: Demolition of existing offices (former Resource Centre for Groundwork Trust) and proposed 6 detached houses in outline with all matters reserved RECEIVED: 21 May 2021 APPLICATION/SITE DESCRIPTION Outline planning consent is sought for the demolition of an existing building and the construction of 6 detached dwellings. All matters of detail have been reserved for future consideration.
The site is located within a woodland area, in an elevated position to the west of Maesteg Road in the community of Tondu. The remains of the Tondu Ironworks, which are both a listed building and a Scheduled Ancient Monument (SAM), lie some 40m to the north-west of this application site. Part of the site also lies within the Derllwyn Road Conservation Area. The nearest residential properties form part of the Ffordd Haearn Estate and comprise a row of semi-detached and detached stone-faced bungalows, the rear gardens of which are approximately 30m from the north-eastern boundary of the application site.
Where layout is a Reserved Matter, the application must state the approximate location of buildings, routes and open spaces included in the development proposed as part of an illustrative layout plan. A 1:500 scale layout plan has accompanied the revised application to address this requirement – see below:
Figure 1 – 1:500 Site Layout Plan
The indicative layout plan proposes development on the footprint of the existing resource centre and associated hardstanding areas and into the areas of adjacent trees and woodland. The six plots are generous in size and will front the existing access road. Parking will be provided alongside each of the dwellings. Site sections suggest that the dwellings will be constructed on or slightly above existing ground levels. Retaining walls will be constructed within the rear garden of the majority of the plots to form a 3m long patio area beyond each dwelling. The remaining garden areas will slope down at various gradients towards the application site boundary. The principal elevation of the dwellings would face south, towards the existing woodland with other significant windows facing north over the pond and landscaped area, with views out towards the Scheduled Ancient Monument of Tondu Ironworks.
Where scale is a Reserved Matter, the application must state the upper and lower limits for the height, width and length of the dwellings. The supporting planning statement indicates that the maximum parameters are at this outline stage given as:
Width – 10m Depth – 12m Ridge Height – 10m.
Where access is a Reserved Matter, the application must state the area or areas where access points to the development proposed will be situated. Access will be gained via the existing junction and road that serves Ffordd Haearn, Tondu Ironworks and the Former Resource Centre Building. From the ‘T’ junction, the 9.0m wide carriageway with footways rise then narrows to form separate points of access to the Ironworks site and application site.
No elevational details are provided at this stage although the supporting statement suggests that the palette of materials will complement the nearby Conservation Area and listed building/scheduled ancient monument and will include slate roofs, stone and render on the walls and grey or white fenestration.
The application has been accompanied by the following plans and technical reports: -
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.