CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Brighton and Hove City Council
Economic Development & Culture Committee, Thursday 10 January 2013 at 4.00pm

Hove Civic Society Plinth

Agreed Committee 3 papers

Economic Development & Culture Committee agreed this item on Thursday 10 January 2013. Below is the council's own wording, with the papers it was decided on.

Item52

Resolved

RESOLVED - (1) That the Economic Development and Culture Committee agree to grant Landowner’s consent for the siting of the plinth on King’s Esplanade in the position shown on the plan annexed to the report; (2) That the Economic Development and Culture Committee agree for any final lease arrangements to be determined, subject to planning consent, in accordance with the Scheme of Delgation to the Commissioner for Culture acting in consultation with the Seafront Development Manager and the Head of Legal Services.
Word for word from the decision Brighton and Hove published for this meeting. Source: democracy.brighton-hove.gov.uk

Follow this further

Built from Brighton and Hove's papers

What the report saysPro

Report to Economic Development & Culture Committee

25 Hove Civic Society – Plinth North 26 Hove Civic Society – Plinth East 27 Design and Access Statement

Hove Plinth, King’s Esplanade, Hove

Details of proposal:

Installation of stone clad plinth that can be used to display visiting art works, sculptures and art installations.

The plinth will be installed on Hove seafront. It will align south of the Queen Victoria sculpture located at the end of Grand Avenue, and the middle of the two seafront shelters. It will be positioned in the middle of the promenade (North/South).

The proposal has been developed by Hove Civic Society.

The proposed plinth will measure approximately 2500mm wide x 2250mm depth (front to back) and 2500mm tall. It will be engineered to receive a variety of visiting sculptures ranging from classical to modern. Sculptures installed will not be taller than the ridge line of nearby seafront shelters.

In addition the plinth may also be used for a broad range of art installations. The plinth will have integrated power and data feeds. In addition the proposal is to have a remote power supply that can be used where associated elements of the artworks require.

An in!ground system of lighting flush to the existing paving level will form part of the scheme together with flush lighting on top of the plinth itself. The lights will be controllable by timer and their focus will be adjustable to accommodate changing sculptures and minimise light escaping beyond the artworks.

Page 1 of 4

28 1 Design Statement:

1.1Use – (What buildings and spaces will be used for)

The plinth will be used to display sculpture and art installations. The works will be temporary and changing year on year sourced from local and national artists and major sculpture parks and collections.

The plinth and associated artworks aim to enhance the cultural offering of Brighton and Hove. The artworks will be accessible to all.

1.2Amount – (How much would be built on the site.)

The plinth will have a footprint of approximately 6m square, be approximately 2500mm tall and constructed in Nabresina Romanstone (Pale stone similar to Portland but harder wearing)

The total height of the plinth and the sculpture will not exceed 5500mm equivalent to the ridgeline of the adjacent seafront shelters.

1.3Layout – (How the buildings and public and private spaces will be arranged on the site, and the relationship between them and the buildings and spaces around the site.)

The proposed location for the plinth is on the seafront promenade at the Western end of Kings Lawns directly opposite the end of Grand Avenue. It will be located centrally (North to South) on the promenade. It will also align centrally with the Queen Victoria sculpture and centrally between the two seafront shelters (East to West) located on the pathway running North to South from Kingsway to the promenade.

The plinth and its associated installations will tie in with existing artworks and monuments along the Brighton and Hove seafront and adjacent roads.

1.4Scale – (How big the buildings and spaces would be (their height, width and length)).

Page 2 of 4

29 The plinth will have a footprint of approximately 6m square, be approximately 2.5m tall and constructed in Nabresina Romanstone (Pale stone similar to Portland but harder wearing).

The total height of the plinth and the sculpture will not exceed 5.5m equivalent to the ridgeline of the adjacent seafront shelters.

To give an indication of scale the adjacent shelters are approximately 4.6m tall. There is an approximate Drop of 1m from the level of Kings Lawns to the proposed location of the plinth. As such the shelter ridge line is approximately 5.6m above the ground level where the proposed plinth location. The Queen Victoria sculpture is approximately 9m tall.

The seafront promenade is an open tarmacked area approximately 26.5m wide (N to S). Immediately to its North is the Kings Lawns. Grand Avenue is flanked by 7storey Kings House to its Eastern Side and 5 storey seafront buildings with an 11 storey block of immediately behind (inland).

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Hove Civic Society: AppendicesReport 1.2 MB DownloadRead as text
PDF
Hove Civic Society PlinthReport 83 KB Download
PDF
View item 52. as HTML 83 KBReport 83 KB Download

More from Brighton and Hove Economic Development & Culture Committee

All decisions
MeetingDecisionOutcome
9 Mar 2017 Supporting a Vibrant Tourist EconomyRESOLVED - That the Committee note the work undertaken to support a vibrant tourism economy in the City and agrees th... Noted Open
9 Mar 2017 Developing a new Strategic Framework for Arts & Culture in the CityRESOLVED - That the Committee agrees that the City Council works with the Arts & Creative Industries Commission to de... Agreed Open
9 Mar 2017 Houses of Multiple Occupation - Response to matters raised at full CouncilRESOLVED – That the report be deferred. Deferred Open
9 Mar 2017 s106 Developer Contributions Technical Guidance - Updatei) That the Committee approves the updated Developer Contributions Technical Guidance attached as Appendix 1. ii) Tha... Approved Open
9 Mar 2017 Old Town Conservation Area Character StatementRESOLVED – That the Old Town Conservation Area Character Statement be approved (Appendix 1). Approved Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies