Resolved
View the decision text for item 95.
Environment, Transport & Sustainability Committee decided this item on Tuesday 17 March 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
View the decision text for item 95.
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Appendix 2
Developed Design Visuals
117 Rebuilding Valley Gardens Stage 1: Roads
Why are we changing the Road layout?
Despite being designed for vehicles, with no real thought for anyone else, Valley Gardens works poorly for everyone moving through the area.
When we surveyed residents in April 2013: • only 34% of people felt the roads were well designed to keep traffic moving. • only 26% felt that it was pleasant to walk in Valley Gardens. • only 17% felt that it was easy to cross the road on foot. • only 10% felt that it was pleasant to cycle in Valley Gardens. • only 9% felt that cycle parking was of high quality. Key The current road arrangement between the Aquarium Roundabout and St Peters Church is a needlessly confusing Bus, Taxi & Access mixture of gyratories and contraflows, with buses, private General Traffic vehicles and cyclists moving from one side of the gardens to the other as they travel north to south.
This creates an unpleasant and at times unsafe environment, which prevents people from enjoying public spaces as much as they could. In our 2013 consultation, 83% of people said they’d like to spend more time in the gardens if the facilities/environment were improved. In the 36 months between August 2008 and July 2011 185 collisions were reported in Valley Gardens. 32 were serious, 1 fatal. Of 249 casualties, 86 were vulnerable road users (32 cyclists and 54 pedestrians).
The collisions tend to cluster around particularly confusing and counter - intuitive junctions. How can we simplify the road layout?
We have to simplify the road layout if we want The scheme achieves this by moving buses, taxis and to improve Valley Gardens for everyone. Ideally local access onto a consistent route that will run along this has to be achieved without losing any of the the western side of Valley Gardens, and keeping important trees in the area. private vehicles on the eastern side. (All vehicle access points in and out of Valley Gardens will be maintained).
Because traffic routes are simplified, so are junctions, meaning there are fewer delays when driving in Valley Gardens.
The simpler layout enables us to reclaim some of the existing space given over to vehicles to create more public space, without reducing the time it takes for vehicles to get through the area.
As well as simplifying the traffic infrastructure (and so removing the need for confusing junctions and road layouts), the proposal sees carriageways designed in a way that is appropriate for a city centre environment and complementary to the character and location of Valley Gardens. The design language, including elements such as tighter junction radii, narrow lane widths, minimal road markings etc., will encourage drivers to drive appropriately for a city centre location.
118 Rebuilding Valley Gardens Stage 1: Roads (cont)
Existing
New
Key
Public Traffic / Access General Traffic Public & General Traffic 1 lane 2 lanes
The current traffic layout is unnecessarily confusing. The mix of gyratories and contraflows require complex junctions and create a dangerous environment. The simplified layout puts general traffic on the eastern side of the Gardens and public transport / local access to the west. As well as making Valley Gardens easier to drive through and safer for everyone, this lets us reduce the amount of tarmac without reducing the time it takes to drive through the area. All routes in and out119 of Valley Gardens stay the same. Rebuilding Valley Gardens Stage 2: Walking
Complex junctions and constantly changing traffic arrangements currently make it difficult (and sometimes dangerous) for pedestrians to cross the road in Valley Gardens.
Numerous collisions have taken place in the area. The vehicle dominated design of the area, which encourages drivers to drive without appropriate care, the counter intuitive road layout and limited number of formal crossing places are all contributory factors.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Valley Gardens Decision TimelineAppendix 1 | 59 KB | Download |
PDF |
Enc. 2 for Valley GardensReport | 4 MB | DownloadRead as text |
PDF |
Enc. 3 for Valley GardensReport | 48 KB | Download |
PDF |
Valley GardensReport | 88 KB | Download |
PDF |
View as HTML (95./2) 31 KBDecisions | 31 KB | Download |
PDF |
View as HTML (95./4) 28 KBReport | 28 KB | Download |
PDF |
View item 95. as HTML 50 KBReport | 50 KB | Download |
Follow Environment, Transport & Sustainability Committee at Brighton and Hove and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 14 Mar 2023 | Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. | Decided | Open |
| 14 Mar 2023 | Public Toilet UpdateView the decision text for item 87. | Decided | Open |
| 14 Mar 2023 | City Environment Improvement Programme UpdateView the decision text for item 88. | Decided | Open |
| 14 Mar 2023 | Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. | Decided | Open |
| 14 Mar 2023 | Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.