Resolved
View the decision text for item 30.
Environment, Transport & Sustainability Committee decided this item on Tuesday 11 October 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
View the decision text for item 30.
Appendix 1
ASSESSMENT AND PROVISION OF PEDESTRIAN CROSSING FACILITIES
PURPOSE OF POLICY To ensure that pedestrian crossings are provided on the basis of impartially assessed need
POLICY
1. When a request for a pedestrian crossing facility is received, an initial assessment will be undertaken to determine if the site meets the agreed pre-qualification criteria, as follows:
Pre-qualification criteria Where a pedestrian casualty has been recorded that site will be deemed to have met the criteria and will go on to be fully assessed. Where there is no pedestrian casualty record, a sample one hour count of pedestrians and vehicles will be undertaken during the busiest time and only sites with a sample PV2 value of greater than 0.2 x 108 will be put forward for full assessment.
2. All sites meeting the pre-qualification criteria set out in (1) will be assessed in detail and prioritised using an approved assessment procedure that takes into account factors such as pedestrian casualties, speed limits, severance, access to schools and existing conditions (See Overleaf).
3. The type of facility constructed will be determined by site assessment bearing in mind the site characteristics including casualty history, vehicle speeds and difficulty of crossing.
NOTE ON PV2 PV2 gives an impartial measure of the need for a pedestrian facility at any site by determining the number of vehicles and pedestrians using the area; it is nationally accepted and has been tried and tested over many years. Using a pre-qualification criteria ensures that detailed assessment is only undertaken for those sites with a proven need and reduces the impact on limited resources.
CROSSING TYPES Traffic light controlled crossings can cost up to 5 times the cost of a zebra or a central island and, therefore, will only be provided where there is a clear identified need.
101 Appendix 1
PEDESTRIAN CROSSINGS ASSESSMENT SCORING
Factor Options Score 1 Improvements for Mobility Impaired Score 2 for crossings specifically requested to improve conditions for mobility impaired
2 Safer Routes to School Score 3 for sites specifically identified as an issue in a School Travel Plan 3 Access to Public Transport Score 2 for sites which will improve access to public transport 4 Reduction of Severance Score 2 for sites which reduce severance (e.g. to serve sole local store / shopping area or where a residential area is severed by a heavily trafficked A or B class road 5 Pedestrian Casualties Score 3 for each pedestrian fatality Score 2 for each serious pedestrian casualty Score 1 for each slight pedestrian casualty 6 Child Pedestrian Casualties Score 3 for each child pedestrian fatality Score 2 for each child serious pedestrian casualty Score 1 for each child slight pedestrian casualty 7 Road Width Score 2 for roads over 9m Score 1 for roads between 7 and 9m 8 Speed Limit Score 3 for roads subject to National Speed Limit Score 2 for roads subject to 50mph limit Score 1 for roads subject to 40mph limit 9 Existing Pedestrian Facilities Score -3 for sites with an existing bridge or subway Score -2 for sites with existing traffic signals with no specific pedestrian facility Score -1 for sites with an existing traffic island 10 Footpaths and Cycle Routes Score 1 for sites which serve an existing designated cycling or walking route such as the National Cycle Network, bridle path or footpath. 11 Street Lighting Score 1 for sites with no street lighting Score 0.5 for sites with existing but sub-standard street lighting 12 Walkability Score 1 for sites that will clearly improve the ‘walkability’ of an area, thereby resulting in additional pedestrian movements 13 Links to South Downs Score 1 for sites that create a new link to the South Downs National Park 12 Average PV squared value (busiest four hours) Score equals average PV squared x 10 (e.g. PV2 of 0.25 becomes score of 2.5) Overall Score
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Enc. 1 for Pedestrian Crossings Priority ListReport | 2 pages | DownloadRead as text |
PDF |
Enc. 2 for Pedestrian Crossings Priority ListReport | 4 pages | Download |
PDF |
Pedestrian Crossings Priority ListReport | 6 pages | Download |
PDF |
View item 30. as HTML 32 KBReport | Download |
Follow Environment, Transport & Sustainability Committee at Brighton and Hove and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 14 Mar 2023 | Official Feed and Food Controls Service Delivery Plan 1 April 2023 - 31 March 2024View the decision text for item 86. | Decided | Open |
| 14 Mar 2023 | Public Toilet UpdateView the decision text for item 87. | Decided | Open |
| 14 Mar 2023 | City Environment Improvement Programme UpdateView the decision text for item 88. | Decided | Open |
| 14 Mar 2023 | Local Transport Plan 2023/24 Capital ProgrammeView the decision text for item 89. | Decided | Open |
| 14 Mar 2023 | Mini Holland feasibility study - Wish & WestbourneView the decision text for item 90. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.