Cabinet: 1. Authorised the Executive Director Growth and Regeneration in consultation with the Cabinet Member Transport to take all steps necessary to use the existing contract for “Maintenance, installation and upgrading of highway electrical assets in the City of Bristol” to include the upgrading of LED lighting and hardware, as well as a provision of a smart CMS to deliver the LED/CMS street lighting network project at a cost of up to £12m.
Word for word from the decision Bristol published for this meeting.Source: democracy.bristol.gov.uk
TITLE Tender and Implementation of the LED/CMS Street Lighting Contract
Ward(s) Citywide Author: Razvan Constantinescu Job title: Assets and Contracts Manager Cabinet lead: Cllr Donald Alexander, Cabinet Executive Director lead: Stephen Peacock, Executive Director Member Transport Growth and Regeneration Proposal origin: BCC Staff Decision maker: Cabinet Member Decision forum: Cabinet Purpose of Report: 1. To seek approval to spend £12 m funding through the existing contract with the aim of replacing Bristol’s existing street lighting installation with a new LED (Light Emitting Diode) and CMS (Central Management System) street lighting network.
2. To seek authorisation to be delegated to Executive Director Growth and Regeneration to approve and oversee the disbursement of the necessary budget for the implementation of this project in consultation with the Cabinet Member Transport.
Evidence Base: 1. This proposed contract would be a far-reaching technical contract, enabling Bristol City Council to be among the cities in the replacement of the existing obsolete high-pressure sodium, ceramic metal halide and cosmopolis based street lighting network. The proposed LED system combined with a CMS system will give the council greater flexibility and control over the street lighting system, resulting in energy savings, reduction of carbon and a reduction in maintenance costs.
2. The proposed LED/CMS system would provide remote control, monitoring and energy measurement of street lighting over a wireless interface, allowing the Council to adapt and manage lighting in line with the Mayoral priorities e.g. carbon reduction.
3. The proposal also seeks to agree a new lighting regime for the city, which will provide significant revenue benefits alongside the carbon reductions. Details of the potential dimming regimes are supplied in Appendix.
4. Importantly, the project would generate 17,741 Tns of Carbon reduction across the projected life-cycle. The project will assist the authority to deliver its target of carbon reduction by 2025
5. Other Councils such as Ealing Council who implemented a similar combination of LED conversion and CMS have generated an estimated 45-50% of energy savings, which is enough energy to power up to 5,000 homes per annum, as well as significantly reducing CO2 emissions. Further savings are anticipated will be made as the Council could increase the use of the CMS system to ‘trim’ streetlights in certain areas and the increased longevity of the LED luminaries and a reduction in maintenance costs.
1 Version April 2021 6. The current BCC stock of lighting units consists of 38,000 units out of which 27,000 units are a combination of high-pressure sodium, ceramic metal halide and cosmopolis lights sources, combined with street lighting lanterns that have reached or are nearing the end of their life span and are in need of change. Depending on the option selected for delivery, the contract would be across several years and the anticipated cost of the entire project estimated to be in the region of £12 m.
7. All heritage lamp posts will remain and will be refurbished including installation of LED lighting and CMS connection. We have already trialled and delivered the refurbishment to cast columns in parts of the city. The CMS system will allow us to control the lighting levels remotely allowing the city to make decision on different lighting levels for different locations and ability to react to safety issues and incidents on the network
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Safety Valve Programme – capital fundingThat Cabinet: 1. Noted the full terms of the Safety Valve agreement with the Department for Education (DfE) (Appendix...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.