18/00791/FUL

Refused Planning 1 paper

Planning Committee refused this item on Wednesday 13 February 2019. Below is the council's own wording, with the papers it was decided on.

Item50.5

Resolved

RESOLVED that p l a n ningpermission be refused , with the precise w o rd i ngof the r ef u s alto bede l e g atedto theChair ofthe Plan n i ngCommittee and t h e Head ofNe i ghbo u r h oodsand Prosper i t y . Reasons The site lies within the Nottinghamshire Green Belt, within which there is a clear presumption against 'inappropriate' development. The proposed development amounts to inappropriate development in the Green Belt, and is harmful to the openness of the Green Belt due to the size of the 20 generators and associated equipment which amounts to an additional encroachment into the countryside. In the opinion of the local planning authority, the applicant has not demonstrated that very special circumstances exist such as to warrant treating this proposal as an exception. The development would, therefore, be contrary to Policy E8 of the Broxtowe Local Plan, Policy 8 of the Broxtowe Part 2 Local Plan (2018) and the National Planning Policy Framework.
Word for word from the decision Broxtowe published for this meeting. Source: democracy.broxtowe.gov.uk

Follow this further

Built from Broxtowe's papers

What the report saysPro

Report to Planning Committee

Planning Committee 13 February 2019

Report of the Chief Executive

18/00791/FUL INSTALLATION OF A NATURAL GAS ENERGY FACILITY AND ASSOCIATED INFRASTRUCTURE LAND OFF LONG LANE, WATNALL, NOTTINGHAMSHIRE

Councillor J M Owen has requested this application be determined by the Committee.

1 Details of the Application

1.1In January 2016, planning permission was granted for the erection of a solar farm on the former Watnall Brickworks site, which included both the brownfield area to the north and some greenfield land south of it. The 24.5 ha site is located wholly within the Nottinghamshire Green Belt and the approved scheme proposes the installation of 68,000 solar arrays, with six accompanying small supporting buildings and 10 CCTV cameras.

1.2The solar farm, as approved, when complete would generate 17MW of power that would feed into the national grid. This is equivalent to providing for 5,151 homes per annum and would result in a saving of 6,700 tonnes of CO 2 per year. Research has shown that this would result in the creation of 119 jobs either directly or indirectly resulting from this development.

1.3This proposal seeks planning permission to install a natural gas energy facility on the concrete base to the north of the site. This development would cover an area of approximately 0.42ha, and is proposed to provide ‘Grid support’ to both the local and national electricity network. Essentially to provide backup when the grid is under stress at peak times, local demand is high and/or the solar farm is not generating at peak capacity. Thus ensuring no ‘drop’ in power supply and in order to guarantee a secure and uninterrupted supply.

1.4The Natural Gas Energy Facility (NGEF) is proposed to work in conjunction with the already approved solar farm, and due to removal of subsidies, companies investing in renewable energy solutions need to maximise the investment opportunities available to them. Companies producing renewable energy also need to effectively be ‘flexible power generators’ and guarantee a constant supply of power to the national grid. The NGEF would, at times of power shortage, tap into the local gas supply and complement the solar farm when there is a need. This generally tends to be for a period of fifteen minutes to four hours, and is most relevant in the winter months when the solar generation is lower and there is greater demand on the energy network.

1.5In the future it is hoped that battery storage systems will be able to supply the backup power needed to solar farms such as this, but currently this technology is unproven, hence the request for the NGEF.

1.6The built form of a NGEF will consist of:  20 generators that would be 12.7m in length, 2.5m in width and 3m in height for the main structure (4m to the top of the stack). Planning Committee 13 February 2019

 20 transformers that would be 2m x 2m by 2m located adjacent to the generators.  A substation measuring 12.2m in length, 2.4m wide and 2.9m high.  A site office measuring 6.6m in length, 2.4m in width and 2.6m in height.  A supporting building measuring 6.6m in length, 2.4m in width and 2.6m in height.  A gas kiosk measuring 5m in length, 4m in width and 2.4m in height.  Palisade security fencing 2.4metres in height, a communications dish and some CCTV monitoring cameras.

1.7The operating hours of this proposal may vary significantly with demand over the course of the year, particularly with seasonal variations in solar output. However, it is estimated that the gas generators will be operating for approximately five hours a day on average over the year, or 20% of the total hours per annum.

1.8The suite of measures with regard to the wider landscaping of the site (already approved under the previous approval) will not be affected by this proposal.

2 Site and Surroundings

Views of access to the hardstanding area where NGEF proposed

The north of the site, showing hardstanding Northern boundary

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
18/00791/FULReport 619 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

14 of 16 attended
MH
Councillor Margaret HandleyChair, present
LA
Councillor Lydia A Ball BEMVice-Chair, apologies, sent representative
DB
Councillor David BagshawCommittee Member, present
JS
Councillor Joan S BriggsCommittee Member, present
TP
Councillor Timothy P BrindleyCommittee Member, present
MB
Councillor Michael BrownCommittee Member, present
RD
Councillor Richard D MacRaeCommittee Member, present
GM
Councillor Greg MarshallCommittee Member, present
JK
Councillor Josie K MarstersCommittee Member, present
PJ
Councillor Philip J OwenCommittee Member, present
RS
Councillor Richard S RobinsonCommittee Member, apologies
PD
Councillor Paul D SimpsonCommittee Member, present

All 16 on the meeting page

On this subject at Broxtowe

Search all
  1. 18/00791/FULThis decision
  2. 26/00581/fulRefused
  3. 26/00495/fulApproved
  4. 26/00516/fulAgreed
  5. 26/00564/fulAgreed
  6. 26/00404/fulAgreed

More from Broxtowe Planning Committee

All decisions
MeetingDecisionOutcome
28 Oct 2026 26/00581/fulRESOLVED that the Planning permission be refused due to the proposed two-storey rear extension, by reason of its scal... Refused Open
28 Oct 2026 26/00554/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant advertisement conse... Approved Open
28 Oct 2026 26/00495/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Approved Open
28 Oct 2026 26/00335/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open
28 Oct 2026 26/00516/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open