What was decided
The Planning Committee delegated authority to the Head of Planning and Economic Development to grant advertisement consent, subject to conditions [D].
The authority required commencement within three years, compliance with listed drawings and site investigation and remediation controls before development [D, P2, P4, P5, P6, P7, P9, P10, P11]. Report P2, P4, P5, P6, P7, P9, P10, P11
The officer report set out further conditions covering noise, construction methods, external materials, landscaping, remediation, highway access, drainage, parking, bins and working hours [P13, P14, P16, P17, P18, P20, P22, P24, P27, P28, P30, P31, P33, P35, P37, P39, P40]. Report P13, P14, P16, P17, P18, P20, P22, P24, P27, P28, P30, P31, P33, P35, P37, P39, P40
Why
The three year commencement limit is intended to comply with S91 of the Town and Country Planning Act 1990, as amended by S51 of the Planning and Compulsory Purchase Act 2004 [P2, P3]. Report P2, P3
The contamination controls aim to protect future occupiers and follow Policy 19 of the Part 2 Local Plan (2019) and Policy 10 of the Broxtowe Aligned Core Strategy (2014) [P10, P11, P12]. Report P10, P11, P12
The noise and construction controls aim to protect future occupants from excessive noise and nearby residents from construction impacts [P13, P14, P15, P16, P17, P18, P19]. Report P13, P14, P15, P16, P17, P18, P19
What happens next
The applicant must commence the development before the expiration of three years beginning with the permission date [P2]. The listed drawings cover the cycle store, roof, site, levels, bin store and elevations, with receipt dates of 10/08/26, 21/08/26 and 15/09/26 [P4, P5, P6, P7]. Report P2, P4, P5, P6, P7
Before development, submit and obtain written approval of the site investigation strategy, any required remediation scheme, the environmental noise assessment and the Construction/Demolition Method Statement [P9, P10, P11, P13, P16, P18]. Give at least 14 days’ notice before remediation works and suspend work if suspected contamination is found [P10]. Report P9, P10, P11, P13, P16, P18
Approve external materials before above ground work and the landscaping scheme before work above slab level [P20, P21, P22, P23, P24, P25, P26]. Complete remediation validation, the dropped crossing, drainage control, parking and turning areas and bin provision before use, and follow the stated working hours [P27, P28, P30, P31, P33, P34, P35, P36, P37, P38, P39, P40, P41]. Contact the Council’s Street Naming and Numbering team once development starts and the County Council to arrange the crossing [P44, P45]. Report P20, P21, P22, P23, P24, P25, P26, P27, P28, P30, P31, P33, P34, P35, P36, P37, P38, P39, P40, P41, P44, P45
Options considered
- Chosen: Grant consent subject to conditions. The conditions aim to protect future occupants from contamination and noise and nearby residents from construction impacts. Report P12, P15, P19
Implications
- Legal: The decision wording refers to advertisement consent, while the officer report recommends planning permission [D, P1]. Report P1
- Legal: Development must start within the statutory period and follow the listed drawings [P2, P3, P4, P5, P6, P7, P8]. Report P2, P3, P4, P5, P6, P7, P8
- Risk: A competent person must investigate contamination. Unacceptable contamination requires an approved remediation scheme, and suspected contamination found during work requires work to stop [P9, P10, P11, P12]. Report P9, P10, P11, P12
- Risk: An environmental noise assessment must assess relevant commercial, manufacturing, plant and goods handling noise [P13, P14, P15]. Report P13, P14, P15
- Risk: The construction method statement must cover access, parking, loading, storage, waste, dust and noise [P16, P17, P18, P19]. Report P16, P17, P18, P19
- Other: External materials and landscaping need approval before the relevant stage of work [P20, P21, P22, P23, P24, P25, P26]. Report P20, P21, P22, P23, P24, P25, P26
- Legal: No part may be used until remediation validation, the dropped crossing, drainage control, bound parking and turning areas and bin provision are complete. Drainage and parking controls must be retained for the life of the development [P27, P28, P30, P31, P33, P34, P35, P36, P37, P38]. Report P27, P28, P30, P31, P33, P34, P35, P36, P37, P38
- Legal: Construction and site preparation work is limited to 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays, with no work on Sundays or Bank Holidays [P39, P40, P41]. Report P39, P40, P41
Who and where
- The applicant Report P10, P18, P44, P45
- Future occupants Report P12, P15
- Nearby residents Report P19, P29, P38, P41
- Highway users Report P32, P34, P36
- The Environmental Health Division Report P10
- The Highway Authority Report P31, P45
- The natural and historical environment Report P10
- Buildings and other property Report P10
Timeline
- 10/08/26, 21/08/26 and 15/09/26: The listed site, level, roof, cycle store, bin store and elevation drawings were received. Report P5, P6, P7
- 28 October 2026: The Planning Committee considered the application. Report P8
- Before the expiration of three years beginning with the date of this permission: The development must be commenced. Report P2
- Before development: The site investigation strategy, any remediation scheme, environmental noise assessment and Construction/Demolition Method Statement must be approved. Report P9, P10, P11, P13, P16, P18
- At least 14 days before remediation works: The applicant must notify the Local Planning Authority’s Environmental Health Division. Report P10
- Before above ground works and before development above slab level: External material samples and a landscaping scheme must be approved. Report P20, P22, P23, P24, P25
- Before any part of the development is brought into use: Remediation validation, the dropped crossing, drainage control, parking and turning areas and bin provision must be complete. Report P27, P28, P30, P31, P33, P35, P37
- During construction and site preparation: Work is limited to 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays, with no work on Sundays or Bank Holidays. Report P39, P40
Plain English for the jargon
- Advertisement consent: The consent named in the decision wording, which differs from the report’s planning permission recommendation [D, P1].
- Site investigation strategy: A strategy for sampling and analysis, undertaken by a competent person [P10].
- Remediation scheme: A scheme to remove unacceptable contamination risks and meet approved objectives and criteria [P10].
- Validation report: A competent person’s report confirming remediation works, quality results and sampling [P28].
- Quality Assurance/Quality Control: Checks included in the validation report to show that remediation met the approved methodology [P28].
- Environmental noise assessment: An assessment of commercial, manufacturing, plant and loading noise [P13, P14, P15].
- Construction/Demolition Method Statement: A statement covering construction access, parking, loading, storage, waste, dust and noise [P16, P17, P18].
- Dropped vehicular footway crossing: A crossing available for use and built to the Highway Authority’s specification [P30, P31].