Resolved
RESOLVED that planning permission be granted subject to the following conditions: 1. The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the drawings numbered ST-347/02 revision B (1:100), ST-347/03 revision C (1:100), ST-347/01 revision B (1:200, 1:100); received by the local planning authority on 18 September and 23 October 2019 . 3. No part of the development hereby permitted shall be brought into use until the dropped vehicular footway and parking spaces as shown on drawing ST-347/02 Rev B, are available for use and constructed in accordance with the Highway Authority specification. 4. No part of the development hereby permitted shall be brought into use until the parking, turning and servicing areas are surfaced in a bound material and with provision to prevent the unregulated discharge of surface water from the driveway/parking/turning areas to the public highway. The parking, turning and servicing areas shall be maintained in the bound material for the life of the development. 5. No part of the development hereby permitted shall be brought into use until the boundary wall and fence on the north west boundary of the site is erected in accordance with the details on drawing no. ST-347/01 revision B. 6. The development hereby permitted shall not be first occupied until details of the bin store have been submitted to and approved in writing by the local planning authority. The bin store shall then be erected in accordance with these details. 7. The windows above ground floor level in the north west elevation of the development hereby permitted shall be obscurely glazed to Pilkington level 4 or 5 and retained as such for the lifetime of the development. 8. No above ground works shall take place until details including the colour and manufacturer of the brick and render have been submitted to and approved in writing by the local planning authority. The development shall then be carried out in accordance with these details. Reasons 1. To comply with S91 of the Town and Country Planning Act 1990 as amended by S51 of the Planning and Compulsory Purchase Act 2004. 2. For the avoidance of doubt. 3. In the interests of Highway safety. 4. To reduce the possibility of deleterious material being deposited on the public highway (loose stones etc.) and to ensure surface water from the site ... view the full minutes text for item 56.3