19/00808/FUL

Approved Planning 2 papers

Planning Committee approved this item on Wednesday 18 March 2020. Below is the council's own wording, with the papers it was decided on.

Item73.1

Resolved

RESOLVED that planning permission be granted subject to the following conditions. 1. The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission. 2. The development hereby permitted shall be carried out in accordance with drawing numbers: 005 Rev L, 002 Rev U and 004 Rev S received by the Local Planning Authority on 20 December 2019 and 003 Rev O and 006 Rev T received by the Local Planning Authority on 23 January 2020. 3. No above ground works shall commence until samples of external facing materials have been submitted to and approved in writing by the Local Planning Authority. The development shall be constructed only in accordance with the approved details. 4. No above ground works shall take place until a landscaping scheme has been submitted to and approved in writing by the local planning authority. This scheme shall include the following details: A. n umbers, types, sizes and positions of proposed trees and shrubs B. Details of boundary treatments; C. Proposed hard surfacing treatment and D. Planting, seeding/ turfing of other soft landscape areas. The approved scheme shall be carried out strictly in accordance with the approved details and shall be carried out not later than the first planting season following the substantial completion of the development and any trees or plants which, within a period of 5 years, die, are removed or have become seriously damaged or diseased, shall be replaced in the next planting season with ones of similar size and species to the satisfaction of the local planning authority, unless written consent has been obtained from the local planning authority for a variation. 5. Prior to the first occupation of the apartments hereby approved, the development shall be constructed in accordance with the submitted Flood Risk Assessment prepared by SCC Consulting Engineer dated 18 December 2019. F lood resilient measures and design techniques shall be used as detailed in Section 6 and the finished floor levels shall be set no lower than 27.57m AOD. These mitigation measures shall be maintained and retained for the lifetime of the development. 6. The building hereby approved shall be constructed to include the noise mitigation measures as detailed within section 4 of the noise assessment report ref: 12581. 02.v 1 dated December 2019. Confirmation of the installation of these measures shall ... view the full minutes text for item 73.1
Word for word from the decision Broxtowe published for this meeting. Source: democracy.broxtowe.gov.uk

Follow this further

Built from Broxtowe's papers

What the report saysPro

Report to Planning Committee

Executive summary

1.1This application was deferred at the Planning Committee on 12 February 2020 due to a request to obtain the comments of the Highway Authority. They have been consulted and raise no objections with the details in appendix 1. The 12 February 2020 report is attached as appendix 2, with a recommendation for approval.

1.2The application is brought back to Planning Committee with no additional changes to the plans.

1.3A failure to determine this application at this committee or to refuse permission will almost certainly result in an appeal to the Secretary of State and a likely award of costs.

1.4With regard to a policy in determining the application the National Planning Practice Guidance (NPPG) gives advice on the types of behaviour that may give rise to a substantive award (of costs) against the Local Planning Authority. This includes:

‘Preventing or delaying development which should clearly be permitted, having regard to its accordance with the development plan, national policy and any other material considerations.’

1.5With regard to the possibility of refusing the application the same guidance states the following may also give rise to a substantive costs award.

‘Persisting in objection to a scheme or elements of a scheme which the Secretary of State or an Inspector has previously indicated to be acceptable.

1.7The Committee is therefore asked to resolve that planning permission be granted subject to the conditions outlined in appendix 1. Planning Committee 18 March 2020

APPENDIX 1 1 Details of the Application

1.1The Highways Authority have been consulted on this application and have raised no objection. There is no evidence to demonstrate there would be a highway safety issue as a result of approving this application.

1.2The Inspector concluded on the appeal decision for 18/00516/FUL that the site is in an accessible location which would discourage the use of the private car and as the apartments would be likely occupied by 1-2 people, it would not generate a significant parking requirement. The Inspector concluded that the development would not lead to a rise in nuisance or dangerous parking in the area and a sufficient amount of parking had been provided. The Inspector stated the following, “I conclude that the development would not significantly contribute to on street parking stress. It would therefore accord with the relevant sections of Policy 17 of the Broxtowe Part 2 Local Plan (2019), which requires that new development provides sufficient parking.” As this application is for one less apartment than the previous scheme with the same amount of parking, it is difficult to see how a reason for refusal based on insufficient parking could be substantiated.

1.3To conclude with regard to highway and parking issues, it is the opinion of the Highways Authority, the Inspector and the Planning Officers, that the scheme is acceptable on highway safety and parking grounds.

2. Other

2.1Two letters of objection were received as late items which can be summarised as follows:

 the building is high and will make the rooms in the neighbouring property dark and overlooked,  the building will create a long dark alley and maintenance/access will not be possible due to insufficient space to erect scaffolding; and  insufficient parking.

2.2These comments have been addressed in the original committee report in appendix 2.

3. Conclusion

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
19/00808/FULReport 1.4 MB DownloadRead as text
PDF
5.1.2 19_00808_FUL 147: 151 Queens Road: FGReport 1.5 MB Download

At this meeting

Whole meeting

Who was there

3 of 14 attended
DB
Councillor David BagshawCommittee Member, present
LA
Councillor Lydia A Ball BEMCommittee Member, apologies
TA
Councillor Teresa A CullenCommittee Member, apologies
DG
Councillor David GrindellCommittee Member, apologies
MH
Councillor Margaret HandleyCommittee Member, apologies
RI
Councillor Richard I JacksonCommittee Member, apologies
RD
Councillor Richard D MacRaeCommittee Member, apologies
JW
Councillor John W McGrathVice-Chair, apologies
PJ
Councillor Philip J OwenCommittee Member, apologies
DP
Councillor Don PringleCommittee Member, apologies
CM
Councillor Colin M TideswellCommittee Member, apologies
DK
Councillor David K WattsChair, present

All 14 on the meeting page

On this subject at Broxtowe

Search all
  1. 19/00808/FULThis decision
  2. 26/00581/fulRefused
  3. 26/00495/fulApproved
  4. 26/00516/fulAgreed
  5. 26/00564/fulAgreed
  6. 26/00404/fulAgreed

More from Broxtowe Planning Committee

All decisions
MeetingDecisionOutcome
28 Oct 2026 26/00581/fulRESOLVED that the Planning permission be refused due to the proposed two-storey rear extension, by reason of its scal... Refused Open
28 Oct 2026 26/00554/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant advertisement conse... Approved Open
28 Oct 2026 26/00495/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Approved Open
28 Oct 2026 26/00335/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open
28 Oct 2026 26/00516/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open