RESOLVED that the Interim Head of Planning and Economic Development be granted delegated authority to grant planning permission subject to: (i) prior completion of an agreement under Section 106 of the Town and Country Planning Act 1990 to secure the provision of affordable housing on site, education, health, off-site highway works and integrated transport measures contributions (ii) the following conditions: 1. Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission. 2. The development hereby permitted shall be commenced before the expiration of two years from the date of approval of the last of the reserved matters to be approved. 3. The outline permission relates to drawings: · 2019-613-00 received by the Local Planning Authority on 5 June 2020 · CLBR-BSP-ZZ-XX-DR-D-0003 Rev P03 and CLBR-BSP-ZZ-XX-DR-D-0001 Rev P04 received by the Local Planning Authority on 12 October 2020 4. Before any site clearance or development is commenced, detailed drawings and particulars showing the following (the ‘Reserved Matters’) shall be submitted to and approved by the Local Planning Authority: (a) the layout, scale, and external appearance of all buildings; (b) roads and parking provision details within the site; (c) the particulars of the materials to be used in the facing of the external surfaces of all buildings; (d) cross sections through the site showing the finished floor levels of the new dwellings ... view the full minutes text for item 31.3
Word for word from the decision Broxtowe published for this meeting.Source: democracy.broxtowe.gov.uk
1.1This is a major planning application seeking outline permission to construct up to 190 dwellings to the west of Coventry Lane with all matters reserved except the formation of a vehicular access (from Coventry Lane). This site has been allocated for housing within the Part 2 Local Plan (2019) under Policy 3.4.
1.2As part of the application, a Transport Assessment, Travel Plan, Flood Risk Assessment and Drainage Strategy, Phase 1 Site Investigation, Protected Species Reports, Ecological Report, Concept Plan, Tree Survey, Noise Assessment, and Design and Access Statement were submitted.
1.3There is an existing access from Coventry Lane (Sidings Lane) which will be reconfigured with the inclusion of mitigation measures to Coventry Lane.
1.4The main issues relate to whether up to 190 dwellings on this site would be acceptable, if satisfactory means of connections and highway mitigation measures have been created, there is a sufficient buffer between the site and Bramcote Crematorium and Stapleford Hill, if enhanced Green Infrastructure corridors have been provided and there is an acceptable impact on neighbour amenity.
1.5The benefits of the proposal would mean 190 additional homes within a sustainable, urban location with improvements to local infrastructure on a site that has been allocated for housing. The proposed works would contribute to the local economy by providing jobs during the construction process. There would be some impact on neighbour amenity but this is considered to be outweighed by the benefits of the scheme.
1.6The Committee is asked to resolve that planning permission be granted subject to conditions outlined in the appendix. Planning Committee 4 November 2020
APPENDIX
1 Details of the Application
1.1This is a major planning application seeking outline permission to construct up to 190 dwellings to the west of Coventry Lane with all matters reserved except the formation of a vehicular access (from Coventry Lane). This site has been allocated for housing within the Part 2 Local Plan (2019) under Policy 3.4.
1.2Policy 3.4 of the Part 2 Local Plan (2019) refers to the whole allocated site and the ability to accommodate up to 240 houses. However, this application does not include the north east corner of the allocation which belongs to Broxtowe Borough Council and Erewash Borough Council. The intention is for this land to be sold to the developer subject to receiving permission for this site. Therefore, it is not included in this application due to the management of the S106 financial contributions.
Part 2 Local Plan (2019) Policy 3.4 Map page 49 Site Location Plan
1.3There is an existing access from Coventry Lane (Sidings Lane) which will be reconfigured with the inclusion of mitigation measures to Coventry Lane. The proposed changes are included within section 6.3 of this report.
2 Site and surroundings
2.1The site is located to the north east of Stapleford District Centre and is situated in- between Stapleford Hill (to the south), the railway line (to the north), Coventry Lane and Bramcote Crematorium to the east and the strategic Aligned Core Strategy allocation of Field Farm to the west. The site is mixed greenfield and brownfield and is used for equestrian, residential and as an engineering depot. The entire allocated site is 12.2 hectares but the part of the site considered for development within this application is 8.73 hectares.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.