Resolved
RESOLVED that the application be deferred.
Planning Committee deferred this item on Wednesday 17 March 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the application be deferred.
1.1This major application seeks planning permission for the construction of 115 dwellings and associated infrastructure, a vehicular access from Cordy Lane and an attenuation pond to deal with surface water to the south-east of the site. The application site has been allocated in the Part 2 Local Plan which was adopted in October 2019 for residential development of 110 dwellings and the proposal is therefore broadly consistent with this policy.
1.2A mix of dwelling sizes is proposed with detached, semi and terraced dwellings, together with one bed maisonette style units. These will largely be 2 storeys in height with a small number having a level within the roofspace. Off road parking is provided for all dwellings. A single vehicular access point is proposed from Cordy Lane and this forms the north boundary of the site with Brinsley Brook running north to south along the eastern boundary. The recreation ground forms the western boundary and a link into this open space is proposed as part of the development. An attenuation pond with perimeter path and landscaping is proposed within the south-eastern corner of the site and a footpath will also be provided alongside the brook.
1.3The main considerations with the application relate to the design of the development and the impact of the development on neighbouring amenity, flooding, ecology, landscape, coal mining legacy and highways infrastructure and safety.
1.4The proposed development is on an allocated site for residential development. The design of the dwellings is considered to be acceptable and includes a mixture of house types to add interest to the streetscene. The LLFA consider that the proposed development can be designed so as to not increase flood risk to other areas outside of the site and mange on site water run-off satisfactorily so as to be acceptable in flood risk terms. Ecological surveys submitted have been accepted by NWT and the ecological impacts of the development are considered to be acceptable. The Highways Authority are content with the layout of the development, the access and the wider network implications, subject to conditions. Links would be provided to connect the site to open spaces and Green Infrastructure beyond its boundary, improving connectivity and there would be no significant harm to any heritage assets. In respect of the coal mining legacy, the results of initial investigations were reviewed by the Coal Authority. They currently object to the Planning Committee 17 March 2021
development as they do not consider that these investigations explore the full extent of the area required in relation to a possible former mine entry within the north of the site. If a mine is located in this area this could result in the need to revise the layout of the scheme to respect ‘no build’ areas around the mine entry. Further investigations have since taken place in line with the recommendations of the Coal Authority and a report detailing the findings of these works is with the Coal Authority for comment. This concludes that no mine shaft has been recorded in the area of investigation and the feature identified on the Coal Authority’s historic maps is considered to be a disused and backfilled historic well, as discovered and documented in the previous investigations. Whilst comments in respect of this are still outstanding it is considered in all other matters the development would therefore be in accordance with the policies contained within the development plan. This should be given significant weight.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
APPLICATION NUMBER 20/00641/FULReport | 2.4 MB | DownloadRead as text |
Follow Planning Committee at Broxtowe and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 28 Oct 2026 | 26/00581/fulRESOLVED that the Planning permission be refused due to the proposed two-storey rear extension, by reason of its scal... | Refused | Open |
| 28 Oct 2026 | 26/00554/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant advertisement conse... | Approved | Open |
| 28 Oct 2026 | 26/00495/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... | Approved | Open |
| 28 Oct 2026 | 26/00335/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... | Agreed | Open |
| 28 Oct 2026 | 26/00516/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.