CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Broxtowe Borough Council
Planning Committee, Wednesday 17 March 2021 at 7.00pm

APPLICATION NUMBER 20/00641/FUL

Deferred Planning 1 paper

Planning Committee deferred this item on Wednesday 17 March 2021. Below is the council's own wording, with the papers it was decided on.

Item66.5

Resolved

RESOLVED that the application be deferred.
Word for word from the decision Broxtowe published for this meeting. Source: democracy.broxtowe.gov.uk

Follow this further

Built from Broxtowe's papers

What the report saysPro

Report to Planning Committee

Executive summary

1.1This major application seeks planning permission for the construction of 115 dwellings and associated infrastructure, a vehicular access from Cordy Lane and an attenuation pond to deal with surface water to the south-east of the site. The application site has been allocated in the Part 2 Local Plan which was adopted in October 2019 for residential development of 110 dwellings and the proposal is therefore broadly consistent with this policy.

1.2A mix of dwelling sizes is proposed with detached, semi and terraced dwellings, together with one bed maisonette style units. These will largely be 2 storeys in height with a small number having a level within the roofspace. Off road parking is provided for all dwellings. A single vehicular access point is proposed from Cordy Lane and this forms the north boundary of the site with Brinsley Brook running north to south along the eastern boundary. The recreation ground forms the western boundary and a link into this open space is proposed as part of the development. An attenuation pond with perimeter path and landscaping is proposed within the south-eastern corner of the site and a footpath will also be provided alongside the brook.

1.3The main considerations with the application relate to the design of the development and the impact of the development on neighbouring amenity, flooding, ecology, landscape, coal mining legacy and highways infrastructure and safety.

1.4The proposed development is on an allocated site for residential development. The design of the dwellings is considered to be acceptable and includes a mixture of house types to add interest to the streetscene. The LLFA consider that the proposed development can be designed so as to not increase flood risk to other areas outside of the site and mange on site water run-off satisfactorily so as to be acceptable in flood risk terms. Ecological surveys submitted have been accepted by NWT and the ecological impacts of the development are considered to be acceptable. The Highways Authority are content with the layout of the development, the access and the wider network implications, subject to conditions. Links would be provided to connect the site to open spaces and Green Infrastructure beyond its boundary, improving connectivity and there would be no significant harm to any heritage assets. In respect of the coal mining legacy, the results of initial investigations were reviewed by the Coal Authority. They currently object to the Planning Committee 17 March 2021

development as they do not consider that these investigations explore the full extent of the area required in relation to a possible former mine entry within the north of the site. If a mine is located in this area this could result in the need to revise the layout of the scheme to respect ‘no build’ areas around the mine entry. Further investigations have since taken place in line with the recommendations of the Coal Authority and a report detailing the findings of these works is with the Coal Authority for comment. This concludes that no mine shaft has been recorded in the area of investigation and the feature identified on the Coal Authority’s historic maps is considered to be a disused and backfilled historic well, as discovered and documented in the previous investigations. Whilst comments in respect of this are still outstanding it is considered in all other matters the development would therefore be in accordance with the policies contained within the development plan. This should be given significant weight.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
APPLICATION NUMBER 20/00641/FULReport 2.4 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

16 of 16 attended
DB
Councillor David BagshawCommittee Member, present
LA
Councillor Lydia A Ball BEMCommittee Member, present
TA
Councillor Teresa A CullenCommittee Member, present
DG
Councillor David GrindellCommittee Member, present
MH
Councillor Margaret HandleyCommittee Member, present
RI
Councillor Richard I JacksonCommittee Member, present
RD
Councillor Richard D MacRaeCommittee Member, apologies, sent representative
GM
Councillor Greg MarshallCommittee Member, present
JW
Councillor John W McGrathVice-Chair, present
PJ
Councillor Philip J OwenCommittee Member, apologies, sent representative (council duties)
DP
Councillor Don PringleCommittee Member, present
DK
Councillor David K WattsChair, present

All 16 on the meeting page

On this subject at Broxtowe

Search all
  1. APPLICATION NUMBER 20/00641/FULThis decision
  2. Application Number 24/00863/VOCApproved
  3. Application Number 24/00864/VOCApproved
  4. Application Number 24/00687/REG3Approved
  5. Application Number 24/00700/FULApproved
  6. Application Number 23/00447/FULRefused

More from Broxtowe Planning Committee

All decisions
MeetingDecisionOutcome
28 Oct 2026 26/00581/fulRESOLVED that the Planning permission be refused due to the proposed two-storey rear extension, by reason of its scal... Refused Open
28 Oct 2026 26/00554/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant advertisement conse... Approved Open
28 Oct 2026 26/00495/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Approved Open
28 Oct 2026 26/00335/reg3RESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open
28 Oct 2026 26/00516/fulRESOLVED that the Head of Planning and Economic Development be given delegated authority to grant planning permission... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies