Resolved
RESOLVED that planning permission be granted subject to the following conditions. 1. The development hereby permitted shall be carried out in accordance with Site Location Plan 1: 1250, LP01A received by the Local Planning Authority 11 August 2023, Metal Gate Elevations, LP01, Gate Location, BP01, Section of track, FT01 received by the Local Planning Authority on 27 March 2023 and Block Plan, LP01A received by the Local Planning Authority on 14 August 2023. Reason: For the avoidance of doubt. 2. Within 3 months from the date of this decision, the access will be required to be surfaced in a hard-bound material (not loose gravel) for a minimum of 8.0 metres behind the Highway boundary. The surfaced access shall then be maintained in such hard-bound material for the life of the development. Reason: To reduce the possibility of deleterious material being deposited on the publichighway (loose stones etc.), in accordance with policy 10 of Aligned Core Strategy (2014) and Policy 17 of the Part 2 Local Plan (2019). NOTES TO APPLICANT 1. The Council has acted positively and proactively in the determination of this application by working to determine it within the determination timescale. 2. The proposed development lies within an area that has been defined by the Coal Authority as containing coal mining features at surface or shallow depth. These features may include: mine entries (shafts and adits ); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be present and problems can occur, particularly as a result of new development taking place. Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Coal Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure that a suitable engineering design which takes into account all the relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Coal Authority Policy in relation to new development and mine entries available at: ww.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which ... view the full minutes text for item 21.5