Resolved
RESOLVED that planning permission be granted subject to the following conditions: 1. The development hereby permitted shall be commenced before the expiration of three years beginning with the date of this permission. 2. The development hereby permitted shall be carried out in accordance with the following: Received by the Local Planning Authority on 17 February 2022 · Drawing 1038 007 A Proposed Roof Plan Layout · Drawing F21198 Proposed Site Access Layout & Visibility Assessment (within Transport Statement) Received by the Local Planning Authority on 21 February 2022 · Drawing 1038 008 A Proposed Bin and Cycle Store Received by the Local Planning Authority on 1 August 2022 · Drawing 1038 003 A Proposed Floor Plans · Drawing 1038 004 A Proposed Elevations · Drawing 1038 005 A Existing and Proposed Site Block Plan · Drawing 1038 006 B Proposed Site Plan Layout · Drawing 1038 009 A Existing and Proposed Listed Wall Plan · Drawing 1038 013 Proposed Material Board Received by the Local Planning Authority on 1 December 2023 · Drawing 600924-HEX-00-XX-D-C-9200 P01 Drainage Strategy (within Drainage Statement) Received by the Local Planning Authority on 6 June 2024 · Drawing 22.1695.002C Landscape Strategy Received by the Local Planning Authority on 10 December 2024 Drawing 22.1695.001D Landscape Strategy. 3. No external lighting shall be installed unless its specification and an assessment of areas illuminated has been submitted to and approved in writing by the local planning authority. 4. No removal of hedgerows, trees, or scrub shall take place between 1st March and 31st August inclusive, unless a recent survey has been undertaken by a competent ecologist to assess the nesting bird activity on site during this period. 5. No works which include the creation of trenches or culverts or the presence of pipes shall commence until measures to protect mammals including badger and hedgehog, from being trapped in open excavations and/or pipe and culverts are submitted to and approved in writing by the local planning authority. The measures may include: a) The creation of sloping escape ramps (mammal ladders) for badgers (and other mammals potentially using the site), which may be achieved by edge profiling of trenches/excavations or by using planks placed into them at the end of each working day; b) Open pipework greater than 150 mm outside diameter must be capped off at the end of each working day; c) Fuel and other harmful substances must be kept all in a locked area and spillages treated with spill kits; d) If any fresh sett digging ... view the full minutes text for item 42.7