Resolved
RESOLVED that planning permission be granted with an additional condition for suitable drainage, should it be required. 1. The development hereby permitted shall be maintained in accordance with the plans Received by the Local Planning Authority on 2 December 2024: Ground Floor Plan (1:100) (Drawing Number: 1801(P)13, Revision: M) Roof Plan (1:100) (Drawing Number: 1801(P)15, Revision: J) Received by the Local Planning Authority on 6 December 2024: Amended Elevations (1:100) (Drawing Number: 1801(P)16, Revision: L) Received by the Local Planning Authority on 10 February 2025: Site Location Plan (1:1250) Block Plan (1:500) (Drawing Number: 1801(P)11, Revision: J) Reason: For the avoidance of doubt. NOTES TO APPLICANT 1. The Council has acted positively and proactively in the determination of this application by working to determine it within the agreed determination timescale. 2. The proposed development lies within an area that has been defined by the Mining Remediation Authority as containing coal mining features at surface or shallow depth. These features may include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be present and problems can occur, particularly as a result of new development taking place. Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Mining Remediation Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure a suitable engineering design which takes account of all relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Mining Remediation Authority Policy in relation to new development and mine entries available at: Building on or within the influencing distance of mine entries - GOV.UK Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Mining Remediation Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment ... view the full minutes text for item 52.1