Item10/42/PLAd
Resolved
Decision APPROVED by 8 votes to 0 (unanimously) for the following reasons: 1. It was considered to generally conform to the Development Plan, particularly the following policies: Cambridge Local Plan (2006): policies 3/1, 3/4, 3/7, 3/14, 4/1, 4/2, 4/4, 4/13, 4/16, 6/2 and 8/2. 2. Regard had been given to all other material planning considerations, none of which was considered to have been of such significance as to justify doing other than grant planning permission. Additionally the following wording after subsection (iv) of Condition 4 shall be included: ‘These details shall provide for maximum possible use of the river for delivery of materials, and the limitation of the size and weight of any road delivery vehicles used during construction so that they do not damage neighbouring streets or buildings’, With the addition of the following INFORMATIVE: Because of the constrained nature of the residential streets leading to the site, and the likelihood that any heavy vehicles used to deliver or collect materials would damage street surfaces and buildings and cause disturbance and inconvenience to neighbouring residents, the Council will expect a detailed method statement for construction deliveries to be submitted for approval. The method statement will need to include specification of delivery methods and weights of any road vehicles to be used.
Word for word from the decision Cambridge published for this meeting.
Source: democracy.cambridge.gov.uk