Resolved
Agreed (11 votes to 0) to approve the scheme for implementation at an estimated cost of £36,000 . 2. Kendal Way Planting Refurbishment Refurbishment incorporating tree and shrub replacement with minor civils work, such as knee rail replacement. The estimated cost of this scheme is £8,750. As this work is maintenance of the existing planting areas, officers do not propose to carry out public consultation on the proposals. This work is dependent on the coming planting season and is required to be included within the programme of work planned for the City Council Streetscene Department. Agreed (11 votes to 0) to approve the scheme for implementation at an estimated cost of £8,750. 3. Woodhead Drive/Milton Rd Works to include the thinning and tidying of a Yew hedge to allow surveillance views through to the rear of the hedge and sowing of wildflower plugs to introduce some diversity into the grass sward. The land is City Council owned and therefore the scheme will follow the Tree Protocol Procedure. Officers now propose to carry out public consultation in line with the tree protocol procedure in order to implement the scheme. Agreed (unanimously) to approve the scheme for implementation at an estimated cost of £4,000. 4. Mortlock Avenue The drawing attached in Appendix 1 of officer’s report illustrates the proposed scheme options. The proposed measures include: · Block paving of the central area - £17,014 · Existing footpath to be repaved. - £15,610 · New street furniture. - £2,514 · Wooden panels to screen wheelie bins. - £2,225 · Contingency - £1,637 Total cost - £39,000 Additional options that could be provided in lieu of some of the above measures include: · Provision of play equipment - £5,232 · Removal of existing trees - £750 · Replanting of existing planting areas - £4,760 · Additional wooden panels to screen wheelie bins - £870 Officers propose to carry out a local public consultation to determine local opinion of the design options in order to define a preferred scheme within the budget available. Members stated that if there were headroom in the budget, then the additional wheelie bin screens should be prioritised. Agreed (unanimously) to approve the scheme for public consultation and implementation at an estimated cost of £39,000.