RESOLVED (unanimously) : I. Approved the replacement of the two highway trees on Fitzroy Street as part of the approved Fitzroy/Burleigh Street refurbishment Scheme. II. Approved the implantation of the Manor Street/king Street scheme at a cost of £9,000. III. Approved the sealing of a license between Cambridge City Council and Jesus College, in order to regulate the agreement to provide cycle racks and to carry out resurfacing on land by Jesus College at the Manor Street/king Street junction. IV. Approved the replacement of the Gough Way Bridge to improve access for cyclists and pedestrians along Gough Way path, despite the lack of its adoption as a public right of way by the County Council.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
• Consultation on the replacement of two highway trees on Fitzroy Street has recently completed and the results are presented in this report. The Committee are asked to decide whether to approve the implementation of replacement trees. • The Committee are requested to approve the implementation of the Manor Street/King Street cycle rack and resurfacing scheme. • The Committee are asked to decide whether to continue the Gough Way bridge replacement scheme, following the decision by Jesus College not to agree to the adoption of the route as a public right of way by the County Council.
Recommendations
The West/Central Area Committee is recommended:
2.1To approve the replacement of the two highway trees on Fitzroy Street as part of the approved Fitzroy/Burleigh St refurbishment scheme.
2.2To approve the implementation of the Manor Street/King St Scheme at a cost of £9,000.
2.3To approve the sealing of a license between Cambridge City Council and Jesus College, in order to regulate the agreement to provide cycle racks and carry out resurfacing on land owned by Jesus College at the Manor Street/King Street junction.
2.4To approve the replacement of the Gough Way Bridge to improve access for cyclists and pedestrians along the Gough Way path, despite the lack of its adoption as a public right of way by the County Council.
Report Page No: 1 3. Background
Fitzroy Street Tree Replacement
3.1The refurbishment works that have taken place in Fitzroy Street and Burleigh Street have upgraded street furniture and street lighting, removed redundant facilities, completed new paving work and, where underground utilities allow, will shortly plant new trees in Burleigh Street.
3.2Before the project is completed, further work is planned by the Highway Department of the County Council to maintain the street surface. As part of this they propose to resolve the trip hazards caused by the surface roots of two of the four Ash trees at the western end of Fitzroy Street. An image of this problem can be found in Appendix B of this report.
3.3Within the City Council refurbishment works, the original intention was to construct a plinth at the base of the two trees to encase and accommodate the surface roots. However over the past 12 months the surface roots have become much more prominent, meaning that a plinth would need to be much larger than anticipated and would obstruct the highway and entrances to nearby shops. There is also a possibility that with the rate of recent root growth a plinth would not solve the problem in the long term.
3.4The proposed alternative is to remove the two Ash trees and to replace them with two new semi-mature Ash trees. These would be planted using a proprietary root cell system, a new technique that provides improved growing conditions for the roots to remain below the pavement.
3.5The new trees would be of a variety with a slightly tighter crown, reducing conflict with surrounding buildings.
3.6The City Council are committed to keeping trees in Fitzroy Street because they enhance and soften the streetscape. This proposal would enable new trees to become established ahead of any similar problem with the other two trees, thereby reducing the possibility of a protracted barren period along the street.
3.7By adopting the new root cell technology, we would also be providing more sustainability for the new trees in the very challenging street environment.
Report Page No: 2 3.8 This tree work would be completed as part of our refurbishment project, co-ordinated carefully with the County Council’s surface maintenance work in order to rectify the damaged surfacing in the vicinity. The plan in Appendix C shows the location of the trees proposed to be replaced and the underground area of the new root cell system.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Policing and Safer Neighbourhoods WCACAgreed to speak with Inspector McNeill on how to improve the message of successes and if a briefing note could be cir...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.