Joint Development Control Committee - Cambridge Fringes decided this item on Wednesday 26 February 2014. Below is the council's own wording, with the papers it was decided on.
Resolved (unanimously) to grant the Regulation 3, Town and Country Planning General Regulations 1992 application in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the conditions recommended by the officers.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Report to Joint Development Control Committee - Cambridge Fringes
JOINT DEVELOPMENT CONTROL COMMITTEE (CAMBRIDGE FRINGE SITES)
Report by: Head of Planning Services
Date: 26 February 2014
Application C/05005/13/CC Agenda Item Number Date Received 27/09/13 Officer Kirstie Walker Target Date 5/12/13
Parishes/Wards Trumpington
Site Fawcett CP School, Alpha Terrace, Trumpington
Proposal Erection of four classroom single storey extension to include children’s centre, pre-school, nursery and foyer, car and cycle parking, new access from the Clay Farm development and associated hard and soft landscaping and fencing.
Applicant Cambridgeshire County Council Recommendation Approve subject to the imposition of planning conditions Application Type Regulation 3, Town and Country Planning General Departure: N/A Regulations 1992
The above application is reported to the Planning Committee for determination by Members in accordance with the Scheme of Delegation for the Joint Development Control Committee for the Cambridge Fringes. 0.0 INTRODUCTION
0.1The proposed extension of Fawcett Primary School and children’s centre has come forward as a requirement through the southern fringe developments as secured through the outline planning consent (07/0620/OUT) and Section 106 planning obligations for Clay Farm, Glebe Farm and Trumpington Meadows to meet the needs of the new developments. The principle of having a new access from the east of the school to the Clay Farm development was established through the outline consent. The Fawcett school site playing fields are designated as protected open space under planning policy 4/2 of the Cambridge Local Plan 2006.
1.0SITE DESCRIPTION/AREA CONTEXT
1.1Fawcett School is located to the east of Trumpington High Street, with Long Road to the north and Shelford Road to the south. The school is adjoined to the west by existing residential properties in Alpha Terrace and Wingate Way. To the east it is adjoined by the Clay Farm development, where planning permission has been granted for up to 2,300 homes, as part of the wider Southern Fringe urban extension to Cambridge.
The primary school borders the Trumpington Conservation Area, although there are no listed buildings in close proximity to the application site.
1.2The school is accessed by two routes. The main route is via Alpha Terrace – a residential road with narrow pavements predominately consisting of 19th century terraced housing. The other route is via Foster Road off Paget Road – a traffic calmed street. The existing school is built of brick and is single storey in height with a shallow sloping roof that consists of a main building with five branches off it. Alpha Terrace is accessed off Trumpington High Street and this acts as the main vehicular route in and out of Cambridge City Centre. Cambridge Professional Development Centre (CPDC) is situated adjacent to the school on Foster Road, sharing the exist route onto Paget Road.
1.3The extent of the application site is shown by the red line on the proposed extension plan. The adjacent land uses to the school consist of open fields to the north-east, east and south east and residential properties to the north-west, west and south-west.
1.4The school site is included within the remit of the Joint Development Control Committee (JDCC) because of its close relationship to the Southern Fringe developments and to Clay Farm in particular.
2.0THE PROPOSAL
2 Proposed extension to the school
2.1The existing school provides 10 classrooms and has capacity for 300 pupils with 210 pupils currently on roll. The new proposals will provide four new classrooms, a children’s centre, a pre-school, nursery and a foyer with administration rooms. This will increase the capacity of the school to 420. The extension will be situated to the east of the school, with access provided via a courtyard from the existing building. Two new external entrances will also be provided.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.