CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Cambridge City Council

18/0481/OUT & S/1231/18/OL - Land north of Cherry Hinton

Agreed Planning 6 papers

Joint Development Control Committee - Cambridge Fringes agreed this item on Wednesday 27 May 2020. Below is the council's own wording, with the papers it was decided on.

Item20/8/JDCC

Resolved

Agreed careful consideration was required when looking at the detailed design to ensure that play spaces were usable and did not flood. Officers had worked with the Applicants to produce a drainage strategy, which would ensure play spaces would be usable even during times of high rainfall. There would be some doubling up on the use of land for open spaces and for SUDs systems. iii. Further modelling work had been undertaken by the applicant with regard to drainage. The Council’s drainage and landscape officers were satisfied with these measures and the area would provide useable recreational spaces. iv. The building height parameter plan referred to maximum height of buildings. If buildings of greater storeys are proposed this would be contrary to the parameter plans and would require appropriate planning changes. v. Suggested that additional text should be included o the building heights parameter plan to clarify that building heights will not exceed maximum building heights in both metres and storeys. Design codes and the detailed reserved matters applications would also address the issue of the height of buildings which would be brought forward for the Committee’s future consideration. vi. The South Cambridgeshire District Council’s Local Plan included policies which relate to agricultural land which recognise that an allocated development site comes forward its loss as agricultural land is acceptable. vii. The development proposal sought to deliver 40% affordable housing on site; to be secured through the section 106 Agreement. There was also an opportunity to influence the phasing of the development with a phasing condition. Officers would also work with the applicants as part of the reserved matters process to determine the location of the affordable housing throughout the development. viii. It will not be possible to exceed the maximum number of dwellings (up to 1200 dwellings) if approved today as doing so would be in contravention of the outline approval. ix. Any subsequent plans to alter the change of use on the greenbelt land would require its own specific application to be made for planning permission; therefore, the greenbelt is safeguarded. x. There were relevant planning conditions relating to accessibility and residential space standards; these ensured that M4(2) standard with 5% of affordable homes to M4(3) standard as set out in the Local Plan policies would be met. xi. Could not speculate on the future use of the dwellings or if they were to be used as an Airbnb. Access and Transport Issues The Committee made the following comments in response to the Officer’s Committee report: i. Asked if the roundabout at Airport Way was subject to a s106 Agreement on the Marleigh development, which was the other side of Newmarket Road. ii. Referred to paragraph 13.51 of the Officer’s report which referred to the impact of the development on Teversham village and the increased traffic. Officers were asked to comment on increased traffic through Teversham arising from the two schools provided on the development. iii. Asked from where the pupils attending the secondary school would be travelling as they did not think they would all be coming from Cherry Hinton or Teversham villages. iv. Asked if the locations of the level crossings in both Cherry Hinton High Street and Gazelle Way had been taken into consideration as part of the transport assessment. v. Questioned the robustness of the Transport Assessment and reliance on people travelling by bicycle. vi. Referred to the Officer’s report which stated the ‘residual highway impact would not be severe’. Members were not convinced by the public transport provision and expressed concerns regarding the spine road through the site. Asked what would happen if either Airport Way or Coldham’s Lane were closed and whether this meant the spine road would then become the main route. vii. Commented that the academy appointed to run the secondary school stated on their website that 50% of the school intake would be from outside the catchment area. Most people attending the school would travel by car which would cause transport problems and this wasn’t taken into account as part of the transport modelling / assessment. viii. Questioned if Coldham’s Lane would be segregated between pedestrians and cyclists on both sides of the road. ix. Questioned what the baseline was for the transport assessment and asked whether the impact of the incremental traffic was severe. x. Requested an addition to condition 9 (design code) regarding traffic calming measures. xi. Commented that vehicle trips would not only include trips for employment purposes but could include trips for shopping and noted the location of Tesco and Sainsburys in the vicinity. In response to Members’ questions the County Council Transport Assessment Manager, County council Transport Assessment Officer, Principal Planner and Assistant Director (Delivery) said the following: i. Confirmed that the roundabout at Airport Way was not part of the s106 proposals relating to the Marleigh development. The transport assessment modelled the built-out development and the trips which would be generated as the development was built out including the schools being fully operational. Confirmed the assessment considered the level of trips that the development ‘uses’ would generate and a cautious and robust calculation was taken in that regard. Sought to understand the distribution of those trips and apply them to the network to see if the network could tolerate that against the NPPF test. ii. The education trips were looked at using a gravity model. This considered the probability that people would walk, cycle or travel to school by car. Trips from Teversham were expected to be walking or cycle trips. Trips from Fulbourn might be made by car but it was not expected that there would be many trips from Fulbourn by car. iii. If there were already a lot of car trips to Teversham this was an existing problem and unfortunately could not be resolved as part of the current application. Infrastructure was being put in place for any school children who needed to travel from Teversham to Cherry Hinton as part of the current application. The level crossing was an existing situation. The amount of traffic going through Cherry Hinton High Street was going to be relatively minimal because it was relatively low speed and had the level crossing. There would be minimal extra impact as it was expected that people would avoid a journey through an already congested route which had a level crossing. iv. A comprehensive transport mitigation package was contained in the Officer’s report which had been agreed with County Council officers. Measures included financial contribution to strategic infrastructure, connectivity improvements, improvements to existing footpaths and cycle paths to facilitate linkages connecting with existing routes. v. A signalised junction was already proposed to Coldhams Lane. The safety of the junction had been assessed based on designs submitted and which were judged to be acceptable. Extensive discussions over a number of years had taken place looking at the highway impacts. The design would be worked up through a reserved matters application. A construction management plan would need to be in place to manage transport movements during its construction. Re-routing of traffic in the event of planned roadworks would be considered in advance of any works taking place. The spine road was not expected to be a desirable route as it had traffic signals at the proposed junction with Coldhams Lane. vi. A detailed protocol was being put in place between the City and District Councils and County Council staff for when the County Council are no longer part of JDCC or any successor planning committee set up along strategic joint working. Officers already work closely and would continue to do so. The County Council would be required to consult with the City and District Councils on certain applications, which included school applications. Representations could be made to the County Council on any future school application and there would be public speaking provisions at its meetings as well. vii. Officers were not aware at the time the transport modelling assessment was undertaken that the school would be accepting 50% of its pupils from outside of the catchment area. The school will need to have a travel plan in place which considered how they could accept 50% of pupils outside the catchment area without causing additional congestion/harm. viii. Where possible segregated cycle and pedestrian routes would be provided; however this was not always possible throughout the whole of the site because of constraints and one area where this wasn’t possible was Coldham’s Lane. ix. The baseline for transport modelling was the current situation and the incremental traffic calculated as a result of the development which would not be, relatively speaking, severe given the package of mitigation measures provided. x. Details of the traffic management measures could be picked up in condition 9 of Appendix E as part of the site wide design code condition. xi. Hoped that people who did more frequent trips to a supermarket would walk or cycle and appreciated that some trips would be done by car. Anticipated that some people would seek to avoid travelling to the supermarket during rush hour / commuter traffic. The Chair sought advice from the Assistant Director (Delivery) whether the Committee should continue to determine the application following a query from a Member regarding transport modelling. The Assistant Director (Delivery) commented that this was an allocated site in the local plan and had been through a supplementary planning document (SPD) process. The County Council transport and highways officers had been through a detailed technical assessment process. She appreciated there were local concerns regarding the transport impact but these were inevitable when a strategic development site was brought forward. The transport and highways officers were the technical experts and had considered the transport impacts and supported the application. The impact of the school would be dealt with via the County Council’s planning application process and through a protocol with the City and District Councils. The County Council Transport Assessment Manager commented that they had been working on this application for a long period of time and there had been a number of briefings for Members. Following the last Member briefing they had worked further on the mitigation proposals. This area posed a number of strategic challenges which required strategic investment. Briefings had been provided by the Greater Cambridge Partnership. Localised mitigation had been guided by the SPD and the NPPF and linked back to the planning tests. Housing Delivery and Social Community Infrastructure The Committee made the following comments in response to the Officer’s report: i. Welcomed the additional information regarding the space standards to allow for future review. ii. Expressed concern at suggested location for the affordable housing and should ensure that all developers on site delivered affordable housing on their developments. iii. Questioned why there was no social rent on the one and two bed units. iv. Asked why the Officer’s report referred to the term pepper-potting with regards to affordable housing when it should be clustering. The two were different forms of build-out of social housing and pepper-potting was incorrect as this was not in City Council’s SPD. v. Asked what proportion of the housing would be built to passivhaus standards. vi. Queried was meant by retirement living? vii. Wanted to ensure public accessibility to the facilities. viii. Expressed concerns regarding the length of time that it took to deliver community facilities on the Darwin Green development and requested an earlier trigger point for the delivery of both the temporary and permanent community facilities. ix. Asked if the allotments could be provided earlier than their current trigger point. x. Queried who would service the foul drainage, as Anglian Water said that they did not have capacity. xi. Queried where allotment holders would get water from. In response to Members’ questions the County Council Transport Assessment Manager, Principal Planner and Assistant Director (Delivery) said the following i. Would look to ensure that the affordable housing was distributed appropriately through across the site through the s106 agreement. This would allow an element of control of how much development was permitted and the requirement for affordable housing. ii. An affordable housing mix and tenure type was highlighted on p81 of the report which had been agreed with the Council’s housing officers. A review mechanism will be built into the s106 Agreement. iii. Cambridge City’s SPD was for guidance. Housing officers had provided advice based on recent experiences and it was best to avoid significant clusters of affordable housing. Would work with potential applicants on the details of the affordable housing schemes to ensure that officers were satisfied with the proposals at that time. iv. Advised that the normal approach on all the previous fringe sites had been to cluster the affordable housing; clustering and pepper-potting can have the same meaning, this will be clarified through the s106 Agreement. v. The s106 Agreement would be signed off in consultation with the Chair, Vice-Chair and Opposition Spokes. vi. Could not advise on the specific percentage of houses which would be built to passivhaus standard on site, the Council’s sustainability officer had re-viewed the conditions and would review any discharge of condition applications. vii. The planning application included within its description ‘retirement living facility’ and would be secured through c ondition 15 see Appendix E. This could be private or affordable housing and would form part of the affordable housing component. viii. Confirmed there would be a community use agreement secured through the s106 Agreement. Work had been undertaken with community services officers to agree the delivery of the temporary facility. ix. Agreed to revise the trigger points for the delivery of the temporary community facilities to the 50th dwelling and the permanent facility to the 350th dwelling. x. Phasing of the development would preclude an earlier trigger point for the provision of allotments. xi. Anglian Water had committed to undertaking the necessary improvement work which would be required to be able to service the development. xii. The allotment management strategy would address how water was provided to the allotments. Environmental considerations The Committee made the following comments in response to the Officer’s report: i. The Agent suggested a decision on the bund may have already been made but they understood this would be dealt with through reserved matters applications. ii. Questioned helicopter movements. iii. Queried lighting impact when the MUGA (multi use games area) was used. iv. Asked if hedgerows could be maintained and improved. In response to Members’ questions the Principal Planner, Environmental Health Officer (EHO – Environmental Services) and Assistant Director (Delivery) said the following: i. The Parameter Plan made provision for attenuation measures and the scheme had been assessed on that basis. Precise detail of the attenuation would be subject to a reserved matters application. ii. The City Council’s Environmental Health Officer confirmed that there were various helicopter routes around the airport and one was through the centre of the site, this had been fully assessed in the noise impact assessment. However there are a limited number of daytime movements and at night time only the East of England Air Ambulance flew infrequently. Concluded that there was no unacceptable adverse noise impacts. In reality certain aircraft noise movements would be heard from time to time but any impacts would be reduced and mitigated to an acceptable level as part of building noise insulation scheme. This issue would be controlled by condition. iii. Flood lighting from use of the MUGA would be controlled through condition. The school would have a community access agreement in place. iv. There were ecology aspirations which sought to retain existing hedgerows and trees on the site and the improvement of their condition. This would be covered through the ecological design and the landscape and environment plan. Legal advice was sought on the fact that the free schools’ admissions policy anticipated that 50% of pupils would attend the school from outside of the catchment area and this appeared not to have been taken into account as part of the transport modelling. Advice was also sought on whether the existence of a road in front of the school was an adequate reason to reject the planning application. The Legal Adviser responded: i. The application had undergone extensive consultation and assessment before it had reached the Committee for determination. He reminded the Committee it was an allocated site in the local plan and the Officer’s report had evidenced the application was policy compliant. The Local Highways Authority considered the transport assessment to show appropriate mitigation to eliminate certain elements of traffic. ii. The school could only be occupied after a travel plan had been approved by the County Council. Therefore, it was reasonable to conclude that any concerns regarding transport measures for the school would be addressed. The County Council Transport Assessment Manager confirmed: i. A gravity model had been used when looking at the approach to the school; usually those closer would be more likely to use the school but the model had not excluded those who lived further away, although not postcode specific (as could not be certain where the students would be arriving from), this was the most sensible approach. The Principal Planner clarified: i. The Sustainable Design and Construction SPD did not specify a percentage of housing that would be passive housing. A proportion was acceptable. The Council’s Sustainability Officer had agreed to these conditions and any discharge of condition applications would be reviewed and signed off by the Sustainability Officer. Conditions In response to the conditions attached to the Officer recommendations the following comments were made: i. Condition 41 to also include: any replacement trees should also be maintained for five years from when any replacement planting occurred. ii. Condition 9 to also include: an additional criterion regarding traffic management measures. iii. Additional wording to be included on the Building Heights Parameter Plan to clarify the storeys and heights of buildings. Delegation to officers in consultation with Chair, Vice Chair and Spokes. The Assistant Director (Delivery) concluded with the following: i. Reiterated this was an allocated development site in the current local plan but also in previous local plans. There was an
Word for word from the decision Cambridge published for this meeting. Source: democracy.cambridge.gov.uk

Follow this further

Built from Cambridge's papers

What the report saysPro

Report to Joint Development Control Committee - Cambridge Fringes

JOINT DEVELOPMENT CONTROL COMMITTEE (CAMBRIDGE FRINGE SITES)

Report by: Joint Director of Planning and Economic Development

Date: 27 May 2020

Application Agenda Item 18/0481/OUT Number

Date Received 29 March 2018 Officer Philippa Kelly

Target Date 30 June 2020 (with agreement)

Parishes/Wards Cherry Hinton

Site Land North of Cherry Hinton, Coldhams Lane, Cambridge

Proposal Outline planning application (all matters reserved except for means of access in respect of junction arrangements onto Coldhams Lane, Cherry Hinton Road and Airport Way) for a maximum of 1200 residential dwellings (including retirement living facility (within Use Class C2/C3)), a local centre comprising uses within Use Class A1/A2/A3/A4/A5/B1a/D1/D2, primary and secondary schools, community facilities, open spaces, allotments, landscaping and associated infrastructure.

Applicant Marshall Group Properties Limited and Endurance Estates Strategic Land.

Recommendation Approve subject to conditions and prior completion of Section 106 Agreement.

Application Type Outline Departure: No

Application S/1231/18/OL Agenda Item Number Officer Philippa Kelly Date Received 29 March 2018 Target Date 30 June 2020 (with agreement)

Parishes/Wards Teversham

Site Cambridge Airport, Newmarket Road, Cambridge.

Proposal Outline planning application (all matters reserved except for means of access in respect of junction arrangements onto Coldhams Lane, Cherry Hinton Road and Airport Way) for a maximum of 1200 residential dwellings (including retirement living facility (within Use Class C2/C3)), a local centre comprising uses within Use Class A1/A2/A3/A4/A5/B1a/D1/D2, primary and secondary schools, community facilities, open spaces, allotments, landscaping and associated infrastructure.

Applicant Marshall Group Properties Limited and Endurance Estates Strategic Land.

Recommendation Approve subject to conditions and prior completion of Section 106 Agreement.

Application Type Outline Departure: No ___________________________________________________________________

The development proposed accords with the SUMMARY adopted development plans for the following reasons:

1. The site is allocated for development as Land North of Cherry Hinton, part of Cambridge East, in the adopted Cambridge Local Plan 2018 and South Cambridgeshire Local Plan 2018.

2. The proposals are consistent with the site allocation requirements of policy 13 of the Cambridge Local Plan 2018 and policy SS/3 of the South Cambridgeshire Local Plan Local Plan 2018. It has been demonstrated that acceptable mitigation of environmental and health impacts (including noise) from Cambridge Airport can be provided and secured by planning conditions and planning obligations through a Section 106 Agreement.

3. The application proposals demonstrate that the future development of Land North of Cherry Hinton will not prejudice the potential delivery of development on wider safeguarded land at some point in the future if it becomes available.

4. The continued authorised use of Cambridge Airport is not considered to pose a safety risk. Ongoing activities at Cambridge Airport will not have a significant adverse impact on prospective residential amenity and any new residential use will have an acceptable level of amenity and will not impede on the ongoing use of the airport.

5. The residual highway impacts will not be severe.

6. The proposed development is in accordance with the Cambridge East Area Action Plan 2008 and the Land North of Cherry Hinton Supplementary Planning Document 2018, in that the proposals will contribute to the creation of a sustainable community on the eastern edge of Cambridge with a provision of residential units with a mix of tenure and social infrastructure.

7. The indicative design and layout will set a framework for a high quality and distinctive new neighbourhood.

RECOMMENDATION APPROVAL subject to planning conditions and prior completion of a Section 106 Agreement. INDEX

REPORT SECTION APPENDIX

1. EXECUTIVE SUMMARY -

2. GLOSSARY OF TERMS A

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
18/0481/OUT & S/1231/18/OL: Land north of Cherry HintonReport 1.3 MB DownloadRead as text
PDF
Glossary /8/JDCCAppendix A 108 KB Download
PDF
Government Guidance and Advice /8/JDCCAppendix B 116 KB Download
PDF
Development Plan Documents /8/JDCCAppendix C 88 KB Download
PDF
Supplementary Planning Guidance /8/JDCCAppendix D 60 KB Download
PDF
Proposed Planning Conditions /8/JDCCAppendix E 343 KB Download

At this meeting

Whole meeting
20/6/JDCCMinutesOn the agenda 20/7/JDCCVirtual Council MeetingsApproved
20/8/JDCC18/0481/OUT & S/1231/18/OL - Land north of Cherry HintonThis decision

Who was there

15 of 29 attended
DB
Councillor Dave Baigent Cambridge City CouncilCommittee Member, present
JP
Councillor Jennifer Page-Croft Cambridge City CouncilCommittee Member, apologies
MS
Councillor Mike Sargeant Cambridge City Council - City SpokesVice-Chair, present
MS
Councillor Martin Smart Cambridge City CouncilCommittee Member, apologies, sent representative
KT
Councillor Katie Thornburrow Cambridge City CouncilCommittee Member, present
DT
Councillor Damien Tunnacliffe Cambridge City CouncilCommittee Member, present
BA
Councillor Barbara Ashwood Cambridgeshire County CouncilCommittee Member, apologies, sent representative
LH
Councillor Lynda Harford Cambridgeshire County Council - County SpokesCommittee Member, present
CR
Councillor Claire Richards Cambridgeshire County CouncilCommittee Member, apologies
TW
Councillor Tim Wotherspoon Cambridgeshire County CouncilCommittee Member, present
TB
Councillor Tom Bygott South Cambridgeshire District CouncilCommittee Member, apologies
GC
Councillor Grenville Chamberlain South Cambridgeshire District CouncilCommittee Member, present

All 29 on the meeting page

On this subject at Cambridge

Search all
  1. 18/0481/OUT & S/1231/18/OL - Land north of Cherry HintonThis decision
  2. 24/02159/S106A - Land South of Worts Causeway - Newbury FarmAgreed
  3. 24/01704/S73 - Land South of Worts Causeway - Newbury FarmApproved
  4. 24/01531/REM Land South of Worts Causeway - GB2 - Phase 3Approved
  5. 24/01704/S73 Land South Of Worts CausewayDeferred
  6. 23/01857/S73 - Land South of Robinson Way, Addenbrookes Hospital (RSC40 / Orthopaedic Theatres)Decided

More from Cambridge Joint Development Control Committee - Cambridge Fringes

All decisions
MeetingDecisionOutcome
27 May 2020 Virtual Council Meetings(i) To adopt the conventions for virtual meetings as adopted and used by Cambridge City Council the administering aut... Approved Open
20 Nov 2019 Planning Application 19/1134/FUL - 9 Whitelocks DriveResolved (by 9 votes to 0) to grant the application for planning permission in accordance with the Officer recommenda... Decided Open
20 Nov 2019 18/0181/OUT - Land North of Cherry Hinton, Coldhams Lane (Transport)Agreed that cycle routes in the Coldham’s Lane area were currently problematic due to the railway bridges and stated ... Agreed Open
18 Sep 2019 S/0064/19/CC and S/0064/19/CM - Land north of Newmarket Road, CambridgeResolved (by 11 votes to 1) to refuse the application contrary to the officer recommendations for the following reaso... Refused Open
18 Sep 2019 19/0657/FUL - 31 Southwell Drive, TrumpingtonResolved to grant the application for planning permission in accordance with the officer recommendation, for the reas... Decided Open