13/1786/REM - Bell School Development Site, Babraham Road, Cambridge
DecidedPlanning2 papers
Joint Development Control Committee - Cambridge Fringes decided this item on Wednesday 16 April 2014. Below is the council's own wording, with the papers it was decided on.
Resolved (by 8 votes to 0 with 2 abstentions (SCDC Councillors did not vote)) to grant the application for planning permission in accordance with the officer recommendation as amended, for the reasons set out in the officer report, and subject to the conditions recommended by the officers.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Report to Joint Development Control Committee - Cambridge Fringes
Appendices
Ref Title Page A Government Guidance and Advice 41 B Local Plan Policies 41 C Supplementary Planning Documents and Material 42 Considerations D Internal Consultations and Highways Response 43 E Other External Consultations and Representations 45 F Neighbour & Other Representations 45 G Wording of outline conditions to be discharged with 47 application H Summary of Design Code compliance statement 52 I Cambridgeshire Quality Panel Report 55 J Plan Pack 63
2 0.0 INTRODUCTION
0.1The Bell School development site lies on the southern edge of Cambridge near Addenbrookes and is one of a series of sites coming forward for residential development in the area that are collectively referred to as the Southern Fringe. The Bell site is wholly within the City boundary.
0.2The site is allocated for housing development in the Cambridge Local Plan 2006. It remains an allocated site in the emerging draft local plan (Cambridge Local Plan 2014: Proposed Submission).
Original outline permission
0.3Outline planning permission was granted at the end of 2010 for ‘Residential development not exceeding 347 dwellings (comprising houses and apartments, including affordable and key worker housing), 100 bed student living accommodation for the Bell Language School and public open space, with vehicular access from Babraham Road and associated roads, footpath/cycleways and drainage infrastructure’. In this report this original outline permission is referred to as ‘Permission 1’. At the same time a full application was approved allowing the creation of an emergency access between the site and Greenlands. This emergency access was constructed shortly before the permission for it expired in December last year.
0.4The outline permission required submission of all reserved matters applications within three years from the date of the original outline permission (i.e. by 13 December 2013). This is in contrast to other larger fringe sites which allow submissions over a longer period. As this three years period has now lapsed no further reserved matters applications can be submitted under the outline permission.
Reserved matters approval for access
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.