Joint Development Control Committee - Cambridge Fringes decided this item on Wednesday 21 January 2015. Below is the council's own wording, with the papers it was decided on.
Resolved (by 13 votes to 0 with 2 abstentions) to grant the reserved matters application in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the amended conditions recommended by the officers.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Report to Joint Development Control Committee - Cambridge Fringes
Appendices
Ref Title
1 Map of the ‘Lots’ within Phase 1
2 Layout Plans and Computer Generated Images
3 Quality Panel Minutes
2 SUMMARY The development accords with the Development Plan for the following reasons:
1) This scheme complies with the general principles of the outline parameter plans and Design Code.
2) The design and appearance of Market Square will create a high quality public realm for the new local centre in NWC.
3) Key worker accommodation will be provided in attractively designed buildings, linked by high quality landscaped courtyards.
RECOMMENDATION APPROVAL
0.0INTRODUCTION
0.1This is a reserved matters application that has been submitted as part of the wider North West Cambridge site (NWC). The wider site sits to the northwest of Cambridge, and to the south of Girton Village, between Huntingdon Road and Madingley Road.
0.2The site was allocated as an Area of Major Change within the Cambridge Local Plan 2006, policy 9/7, Land between Madingley Road and Huntingdon Road. The draft Cambridge Local Plan 2014 identifies North West Cambridge as an Area of Major Change through the North West Cambridge Area Action Plan. (NWCAAP 2009). The NWCAAP is a joint document adopted by both Cambridge City Council and South Cambridgeshire District Council. The NWCAAP is the policy basis for the assessment of any applications on this site.
0.3Outline permission was granted and the S106 signed on 22 February 2013. In November 2013 two Section 73 applications (S/2036/13/VC and C/13/1402/S73) were approved to the outline permissions, which allowed for a variation in heights within some local centre locations.
0.4The approvals relating the entire site are for a mixed-use development and comprises up to 3,000 dwellings (of which 1,500 are to be affordable key worker units), 2,000 student bed spaces, 100,000sqm of employment floorspace (of which at least 60,000sqm will be academic employment space), a primary school, open space, recreational facilities, and a local centre which includes retail and community facilities, a hotel, police office, health facilities, senior living accommodation and an energy centre.
3 0.5 The Joint Development Control Committee (JDCC) has since determined a number of strategic conditions, namely; a Site Wide Phasing Plan (Condition 5) the Design Code (Condition 7), a Youth and Play Strategy (Condition 9), the Site Wide Drainage Strategy (Condition 26) and Construction Environmental Management Plan (Condition 52). In addition to this a number of other strategic conditions have been approved relating to the whole site.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.