Joint Development Control Committee - Cambridge Fringes decided this item on Wednesday 18 February 2015. Below is the council's own wording, with the papers it was decided on.
Resolved (by 8 votes to 0 with 0 abstentions – SCDC Councillors did not vote) to grant the application for planning permission in accordance with the officer recommendation, for the reasons set out in the officer report, and subject to the conditions recommended by the officers.
Word for word from the decision Cambridge published for this meeting.Source: democracy.cambridge.gov.uk
Report to Joint Development Control Committee - Cambridge Fringes
Appendices
Ref Title A Strategic conditions which have been discharged B Summary of Design Code compliance statement C Cambridgeshire Quality Panel Report D Plan Pack
0. INTRODUCTION
0.1This is a Reserved Matters application for 165 dwellings on parcels 6 & 7 (77 units and 88 respectively) situated towards the top of the Clay Farm site, approximately 500 metres south of Long Road. The applicant is Countryside Properties, working with, the same architects that developed the nearby parcels 1B, 2 and 5 (known for marketing purposes as Aura), the development of which is well advanced.
0.2In August 2010 outline approval was granted for the Clay Farm development of up to 2,300 homes, a local centre, schools and open space. The outline permission approved 6 parameter plans with which all reserved matter applications must comply. These cover land use, access, density, building heights, landscaping and urban design principles. A full application for the construction of the spine road through the Clay Farm site from Long Road to the Addenbrooke’s Road (AR) roundabout, site wide drainage infrastructure and works to the Long Road plantations was approved at the same time. The spine road is now completed, the associated trees established, and the southern half is open to pedestrians.
0.3Since July 2011 JDCC has granted reserved matters approval for a total of 1700 dwellings on the Clay Farm site for Countryside, Skanska and Bovis. In addition permission has been granted for the secondary school, Central Square and community centre. Implementation of these schemes is underway. More recent permissions include 136 dwellings on parcels 12B, 13 and 14 and 208 dwellings on Quad. There are around 523 occupations (Jan 2015) on the Clay Farm site as a whole.
0.4A number of strategic conditions attached to the outline permission have been discharged, as shown in Appendix B. All reserved matters applications must comply with the documents approved through these conditions.
1. SITE DESCRIPTION/AREA CONTEXT
1.1The site is former agricultural land with a very gentle slope from the site edges towards the centre. Together the parcels cover an area of 3.32 hectares.
1.2Some earth moving has been carried out and the parcels are currently fenced and part of them is used as a construction compound to serve the Aura site. To the north is an area of plantation and the route of one of the 2 east west green links, to the east is the site of the new Secondary School; to the south is another green link and then parcels 8A and 8B, and to the west is the Fawcett primary school.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Joint Development Control Committee - Cambridge Fringes at Cambridge and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.